Head of the Department (SWM), Solid Waste Management Department,Vadodara Municipal Corporation, Vadodara
DESIGN, BUILD, ERECTION, COMMISSIONING, OPERATION AND MAINTENANCE OF 500 TPD CAPACITY MUNICIPAL SOLID WASTE TO COMPOST PLANT AT - VADODARA FOR A PERIOD OF 10 YEARS
301230
PRO NO 45/26-27
Open
Solid Waste Management
Works
Vadodara
2 documents required · 1 mandatory · 1 optional
₹30,000
The Municipal Commisioner, Vadodara Municipal Corporation.
₹3.1 Cr
5 May 2026
5 May 2026
5 May 2026
28 May 2026
5 May 2026
VOLUME I: TECHNICAL BID
Date of downloading of From date: 5/5/2026 on https://tender.nprocure.com
online tender and 28/5/2026
Web site https://tender.nprocure.com
Queries should be sent
Pre bid to Dt. 13/5/2026 Up to 18.00 Hour on
Last date of submission
Of online tender Date: 28/5/2026 till 6:00 pm.
Date: 30/5/2026 till 4:00 pm.
Date of submission of The bidder shall also have to submit hard copy of all the
technical bid, tender documents through reg. AD / Speed post at following
fees, EMD and other address : Khanderao Market, Vadodara-390001, Solid
documents in hard copy waste management, Vadodara Municipal Corporation,
Khanderao Market, Vadodara-390001.
Estimated capital cost Rs. 32,86,00,000.00/-
Estimated O&M cost
Document fees Rs.
TO BE SUBMITTED TO:
(ONLY HARD COPY)
Executive Engineer SWM Solid waste management,
Vadodara Municipal Corporation,
Khanderao Market, Vadodara-390001.
Vadodara Municipal Corporation
Solid Waste Management Department
Khanderao Market, Vadodara-390001.
(O) 1800-233-0265, E-mail: [email protected]
“DESIGN, BUILD, ERECTION, COMMISSIONING, OPERATION AND
MAINTENANCE OF 500 TPD CAPACITY MUNICIPAL SOLID WASTE TO
COMPOST PLANT AT V A D O D A R A FOR A PERIOD OF 10 YEARS”
Executive Engineer SWM Solid waste management,
Vadodara Municipal Corporation,
Khanderao Market, Vadodara-390001.
NOTICE INVITING TENDER (NIT)
NOTICE INVITING TENDER:
Tender Notice No. 45/2026-27
Organization Name VADODARA MUNICIPAL CORPORATION
Department Name SOLID WASTE MANAGEMENT
DESIGN, BUILD, ERECTION, COMMISSIONING, OPERATION
AND MAINTENANCE OF 500 TPD CAPACITY MUNICIPAL SOLID
WASTE TO COMPOST PLANT AT - VADODARA FOR A PERIOD
Tender Type Online Open
Bidder Nationality Indian
Type of Contract Single Work
Bidding Currency Single- Indian National Rupees.
Joint Venture/Consortium Allowed.
From Dt. 5/5/2026 on
Downloading of Tender
https://tender.nprocure.com and
From 5/5/2026 on
Last date of Online Bid https://tender.nprocure.com and
submission. 28/5/2026 Up to 18:00
Physical submission of EMD, at Solid Waste Management
Department, Vadodara Municipal
tender fee and PQ Bid &
Corporation, Khanderao Market,
Schedule of E-Tender Technical Bid of tender with
Vadodara, Gujarat- 380001. through
PQ Supporting documents RPAD/ Speed Post through postal
authority only.
30/5/2026 From 4:00 pm onwards at
Opening of Tender (online) Solid Waste Management
Department, Vadodara
180 days (One hundred and Eighty
Bid validity period days) from the date of opening of price
Project Duration 12 Months (excluding monsoon)
Rs. 30,000/- in form of Demand
Draft / Pay order from any bank
payable at VADODARA in the favor
Payment Details Document Fee
of The Commissioner, Vadodara
Municipal Corporation payable at
Rs. 3,12,00,000/- in form of Demand
Draft / Pay Order / Bank Guarantee
from any Nationalized / Scheduled
EMD (BID SECURITY) bank or any other bank as
approved by VMC in the favor of The
Commissioner, Vadodara Municipal
Corporation payable at VADODARA.
GENERAL TERMS & CONDITIONS
The tenders will be received up to 6:00 pm hrs. on dt:28.05.2026 through online e-tendering
on https://tender.nprocure.com
All documents must be colored scanned to be seen as original. Scanning in black and white
or gray shall not be acceptable, However Decision of Competent authority shall be final and
binding for its acceptance to all bidders.
All the documents must be notarized with clearly displaying stamp, number and name of the
Price Bid shall have to be quoted strictly online only. No hard copy of price bid shall be
All document claiming the bid shall be submitted online only, submission made in physical
format later shall not be considered as part of bid.
Addenda/corrigenda to these tender documents, if issued must be signed and submitted
DOWNLOAD OF TENDER DOCUMENT
The tender document for this work is available only in Electronic format can be download
free of cost by the bidder.
SUBMISSION OF TENDER
The tenders will be received up to 6:00 pm hrs. on dt:28.05.2026 through online e-tendering
on https://tender.nprocure.com
"Following Documents shall only be submitted in Hard Copy to Vadodara Municipal
Corporation by all bidders"
Earnest Money Deposit as mentioned in the Tender.
Tender Fees as mentioned in the tender
Documents like Site Visit Certificate, Undertaking, Affidavit and Undertaking on EMD
Surrender as prescribed in tender document whether on bidder‟s letterhead or stamp paper
shall be submitted.
Technical Bid and qualification documents mentioned in the tender and price Bid are not to
be submitted in Physical Form. Please note that Non-submission of Hard copies of Technical
Bid as well as price bid does not absolve the bidders from any liability created from the bid
condition and bidding process. Price Bid shall have to be quoted strictly online only. Technical-
Bid in Hard copy shall be submitted only by Successful Bidders upon intimation from VMC."
This cover must be superscripted with "Technical Bid Cover".
All above sealed covers shall be put together in One cover (say Main cover) and this cover
duly sealed shall be submitted to through Reg. AD / Speed post at following address :
Khanderao Market, Vadodara-390001., Solid waste management, Vadodara Municipal
Corporation, Khanderao Market, Vadodara-390001. on or before dt:30.05.2026 at 4:00 pm.
Tender Notice No., Due Date, Name of Work, and Name of Tenderer/Contractor with
Address must be specified on all above covers.
No delay on account of any case for receipt of tender shall be entertained. Tenders received
or due to be received after the time limit is over will not be accepted and if inadvertently
accepted will not be opened and will be returned unopened. The tenders which may get opened
before the due date with no indication having been given on the outside of the envelope are
liable to be rejected.
The tender must contain the name, address and residence and place of business of the
persons submitting the tender and must be signed and sealed by the Tenderer with his usual
All partners must sign tenders by partnership firm. The full name and addresses of all the
partners shall be furnished. The tenders by Corporation/Companies must be signed with the
legal name of the Corporation/Company by the president/or by the secretary or other person or
persons legally authorized to bind the company in the matter.
OPENING OF TENDER
The Technical Bid will be opened on the specified date online on website
https://tender.nprocure.com Bidders or their representative who wish to participate in online
tender opening can log on to https://tender.nprocure.com on the due date and time, mark their
presence and participate in online tender opening. Bidders who wish to remain present at
Vadodara Municipal Corporation, Solid Waste Management Department at the time of tender
opening can do so. Only one representative of each firm will be allowed to remain present.
INFORMATION FOR ONLINE PARTICIPATION
1. Internet site address for e-Tendering activities will be https://tender.nprocure.com
2. Interested bidders can view detailed tender notice and download tender documents from the
above mentioned website.
3. Bidders who wish to participate in online tender have to register with the website through the
“New User Registration” link provided on the home page. Bidder will create login id & password
on their own in registration process.
4. Bidders who wish to participate in this tender need to procure Digital Certificate as per
Information Technology Act-2000 using that they can digitally sign their electronic bids. Bidders
can procure the same from any of the CCA approved certifying agencies, or they may contact
(n) code Solution at below mentioned address and they will assist them in procuring the same.
Bidders who already have a valid Digital Certificate need not to procure the same. In case
bidders need any clarification regarding online participation, they can contact
M/S (n) code Solution, 301, G.N.F.C. Info Tower, Neargrant Bhagwati Hotel, Vadodara
Tel: +91 79 26857318 E-Mail: https://VMC.nprocure.com
5. Bidders who wish to participate in e-Tender need to fill data in predefined forms of tender fee,
EMD, PQ(Technical) or experience details and Price bid only.
6. Bidder should upload scan copies of reference documents in support of their eligibility of the
7. After filling data in predefined forms bidders need to click on final submission link to submit
their encrypted bid.
The information contained in this tender including information provided subsequently to
Bidder(s) as addendum/clarifications by Vadodara Municipal Corporation is provided to
Bidder(s) on the terms and conditions set out in this tender and such other terms and conditions
subject to which such information is provided. The purpose of this tender is to provide interested
parties with information that may be useful to them in submitting their Proposals pursuant to this
tender. This tender includes statements, which reflect various assumptions and assessments
arrived at in relation to the Project. Such assumptions, assessments and statements do not
purport to contain all the information that each Bidder may require. This tender may not be
appropriate for all persons, and it is not possible for the Authority, its employees or advisors to
consider the investment objectives, financial situation and particular needs of each party who
read or uses this tender. The assumptions, assessments, statements and information contained
in this tender, may not be complete, accurate, adequate or correct. Each Bidder should,
therefore, conduct its own investigations and analysis and should check the accuracy,
adequacy, correctness, reliability and completeness of the assumptions: assessments,
statements and information contained in this tender and obtain independent advice from
appropriate sources.
Information provided ·in this tender to the Bidder(s) is on a wide range of matters, some of
which depends upon interpretation of law. The information given is not an exhaustive account of
statutory requirements and should not be regarded as a complete or authoritative statement of
law. The Authority accepts no responsibility for the accuracy or otherwise for any interpretation
or opinion on law expressed herein. The Authority, its employees and advisors make no
representation or warranty and shall have no liability to any person, including any Bidder under
any law, statute, rules or regulations or tort, principles of restitution or unjust enrichment or
otherwise for any loss, damages, cost or expense which may arise from or be incurred or
suffered on account of anything contained in this tender or otherwise, including the accuracy,
adequacy, correctness, completeness or reliability of the tender and any assessment,
assumption, statement or information contained therein or deemed to form part of this tender or
arising in any way in this Bid Stage. The Authority also accepts no liability of any nature whether
resulting from negligence or otherwise howsoever caused arising from reliance of any Bidder
upon the statements contained in this tender. The Authority may in its absolute discretion, but
without being under any obligation to do so, update, amend or supplement the information,
assessment or assumptions contained in this tender. The issue of this tender does not imply
that the Authority is bound to select a Bidder or to appoint the Selected Bidder, as the case may
be, and the Authority reserves the right to reject all or any of the Bidders or Bids without
assigning any reason whatsoever. The Bidder shall bear all its costs associated with or relating
to the preparation and submission of its Bid including but not limited to preparation, copying,
postage, delivery fees, expenses associated with any demonstrations or presentations which
may be required by the Authority, or any other costs incurred in connection with or relating to its
Bid. All such costs and expenses will remain with the Bidder and the Authority shall not be liable
in any manner whatsoever for the same or for any other costs or other expenses incurred by a
Bidder in preparation or submission of the Bid, regardless of the conduct or outcome of the
Bidding Process.
(SECTION - II) PRE-QUALIFICATION CRITERIA
QUALIFICATIONS OF TENDERERS:
Following are the minimum requirement to qualify in the tender technical bid. :
A. Only duly registered Firm/Company can submit Bid. Provide Certificate of Registration.
(I.e. GST / IT tax etc.)
B. Registration
The bidder shall have the following registrations and details of the same be provided
in the Technical Bid.
i). PF registration.
ii). Labour Licence / ESIC Registration.
C. The tenderer should be the service provider of Processing fresh solid waste
plant/compost processing plant/CNG Plant/C & D waste Plant either on EPC/PPP and/or
under integrated waste management processing work. Tenderer must be having at least One
year of continuous experience for above referred work. Necessary documentary proof/s shall
be attached with the tender.
D. The tenderer shall furnish the list of Municipal corporations /ULBs /Institutions with
Address & Tel. no. To whom services have been rendered during the preceding three years
and the work details of Any Type of Fresh Solid Waste processing plant.
E. The tenderer shall furnish work certificates of at least one of such customers, together
with self-attested copies of purchase order received from those clients.
F. Certificate from Chartered Accountant about turn over must be attached.
G. Site Visit Certificate Must be required before three (3) days of tender last submission
H. Financial Experience Criteria
a. The Tenderer/s should have minimum Average Annual Contract turnover (Service
Providing work turn over as per work experience shown in the criteria) from work (on rental
EPC/PPP Basis &/or O & M of contract base / integrated waste management work) of last
three financial years 2022-2023, 2023-2024 and 2024-2025 shall be at least 30% of the
Civil, Supply work cost and Operation and maintenance cost of the tender which is Rs.
156.015 Cr. i.e. It must be at least (Rounded off) Rs. 46.80 Cr. (Forty Six Crore and
eighty Lakhs Only).
b. The Tenderer should have a Bank solvency certificate from a Nationalized Bank /
Scheduled Bank / banks as per VMC circular of an amount not less than 20 % of the
estimated cost of the tender which is Rs. 156.015 Cr. i.e. it must be at least (Rounded off)
Rs. 31.20 Cr. (thirty one crore twenty lakh only) Bank Solvency shall not be older than
one year period from the last date of due date of tender.
I. Work Experience Criteria
The tenderer should be the service provider of Any Type of Fresh Solid Waste processing
plant /Compost Plant/Bio-CNG Plant/C&D Plant/MRF Plant either on EPC/PPP and/or
under integrated waste management processing work. Tenderer must be having at least
One year of continuous experience for above referred work. Necessary documentary
proof/s shall be attached with the tender.
Agency must be having the Experience of successfully completed O & M of similar work/s
for at least One full (Continuous) year during last 7 years ending on bid Publish date; it
should be either of the following:
A. For Civil & Supply Part
a. Three similar works which should not be less than 40% (i.e. work for supply,
installation, testing, commissioning and erection of plant work value more than
Rs.13,14,40,000 /-) of the work.
b. Two similar works which should not be less than 50% (i.e. work for supply, installation,
testing, commissioning and erection of plant work value more than Rs. 16,43,00,000/-) of
c. One similar work which should not be less than 80% (i.e. work for supply, installation,
testing, commissioning and erection of plant work value more than Rs. 26,28,80,000/-) of
*Similar nature of work shall mean setting up of successfully completing or substantially
completing and equipment and machineries for Any type of Processing fresh solid waste
plant/compost processing plant/CNG Plant/C&D Plant/MRF Plant as per SWM Rules
Rules, Norms, Act, CPCB Guidelines, NGT Orders etc.
B. For O&M Part
a. Three similar works which should not be less than 40% (i.e. work for 200 ton per day) of
the estimated daily work.
b. Two similar works which should not be less than 50% (i.e. work for 250 ton per day) of
the estimated daily work.
c. One similar work which should not be less than 80% (i.e. work for 400 ton per day) of
the estimated daily work.
*Similar nature of work shall mean O&M of processing plant of any type of fresh solid
waste/Compost Plant/Bio-CNG Plant/C&D Plant/MRF Plant and scientifically disposal
of the screened items in environment friendly way and as per SWM Rules 2016 Rules,
Norms, Act, CPCB Guidelines, NGT Orders etc. Documents To Be Submitted In Support
of above Criteria as Co-processing certificates issued by the consumer with unique
reference number along with Certificates issued by the Urban or Local Bodies confirming the
same, signed by officer above or equal to the rank of Executive Engineer.
The bidder shall produce the work completion certificate / 3A Progress Certificate or
performance certificate from Central govt. organization/ State govt. organization /VMC
/Municipal Corporations / Institute or any other Agency of Government of India or any of the
State Governments /ULBs/Govt/Municipal Authority. The same shall mention clear amount
and Work Done Quantity of work related to this tender.
Joint Venture/Consortium/Memorandum of understanding is allowed between maximum
Agencies/Members/Firm
The Joint Venture must fulfil the following condition.
a) Joint Venture is allowed between maximum 02 Agencies/Members/Firm. Agencies/Firm are
means partnership/proprietor/Pvt ltd./ltd/trust/society/JV Firm.
b) The joint venture must collectively satisfy the financial criteria and technical criteria.
c) Joint Venture / Consortium agreement shall clearly and unambiguously specify the roles,
duties and responsibilities of each of the Consortium members including binding of all two
parties for execution of the project during its entire concession period.
d) Experience of Work Carried out by all Joint Venture / Consortium members will be
consider for Evaluation, subject to the fact that, the Bidder should have clearly mentioned
their stake in the Consortium agreement of the executed Work. If not mentioned, then
bidder has to provide certificate showing work done by each Consortium members (Share /
Stake) in said project issued by Competent Authority (Client).
e) Modification / termination of Consortium partner or Dissolving Consortium before the
entire concession period is not at all allowed. However any kind of change in consortium
agreement may be allowed only with prior approval of commissioner Vadodara Municipal
f) Individually each partner should provide accurate information on any litigation or
arbitration resulting from contracts completed or under execution by him over the last seven
years, the consistent history of awards against the applicant or any partner of a Joint
Venture may result in failure of the applicant.
g) Bid shall be signed so as to legally bind all partners, jointly & severally and shall be
submitted with a copy of the joint venture agreement providing the joint & several liabilities with
respect to the contract.
h) Payment shall be made to a JV/SPV firm/Bidder account only.
J. Other Criteria
1. The works for which Bidder have not entered in to contract agreement will not be
2. Experience as sub-contractor shall not be considered. Bidder or its SPV firm must
possess to qualification criteria. However bidder/its SPV must submit relevant documents of
3. The above experience shall be within last seven (7) years ending on date of bid publish
4. The bidder should have similar experience for completed work as well as in case of
ongoing work is for a long-term contract, in both cases the quantity achieved during the
progress of the ongoing contract under execution, should meet the requirement of the
quantity mentioned in qualifying criteria in any one year during last 7 years.
5. The bidder should have successfully supply and running Any Type of Fresh Solid Waste
processing plant/compost processing plant/CNG Plant/C&D Plant/MRF Plant in any one year
during last 7 years.
6. Bidder should submit all the credentials along with all experience certificates of similar
nature of works executed.
7. The experience of works executed for Govt. of any central gov./organization/state govt.
organization/Vadodara Municipal Corporation/Municipal Corporations/Institute or any other
agency of govt. of India or any of the state govt./ULBS/Govt/Municipal authorities shall only
be considered for evaluation. The experience certificate from the client equivalent to not
below the rank of Executive Engineer shall be considered. The experience of sublet works
shall not be considered.
8. If the work is done on any PPP models, then the capital cost of the project shall have to
be certified by a Chartered Engineer along with the purchase invoice and the same shall
have to be submitted with the tender.
9. The bidder must submit online and hard copy documents.
10. Tenderer/Company must be having financial and technical work experience as mentioned
11. Substantially completed works means those works which are at least 80% completed as
on the date of submission (i.e gross value of work done up to the last date of submission is
80% or more of the original contract price) and continuing satisfactorily. However in case of
bidder has substantially completed works as per above than agreement/work order full
capital work Amount will be taken for qualify.
12. In case of work Carried out by all the members of MoU / TA members in Joint Venture,
the experience of work carried out will be consider for Evaluation, subject to the fact that,
the Bidder should have clearly mentioned their stake in the JV Agreement of the executed
Work. If not mentioned, then bidder has to provide certificate showing their percentage
stake and amount of work done by each Joint Venture / Consortium members (Share /
Stake) in said project issued by Competent Authority (Client).
13. The Bidder shall submit the attested copy of partnership deed, power of attorney, etc.
14. Any type of biomining-biodegradable work experience not allowed.
K. Special Notes Disqualification
Disqualification Even though the Applicants meet the above criteria, they are subject to be
disqualified if Applicant or any of its constituent partners have: - Made misleading or false
representation in the forms, statements, and attachments submitted; or - Been debarred or
terminated or blacklisted (and effect is continue on due date of this tender) by Central Govt.
organization / State Govt. organization / VMC / Any Municipal Corporation / ULBs
In case of a proprietary firm, partnership, private ltd, limited firm the following are the
disqualification in case of failure to disclose information by partners or the proprietor:
(i) If, any of Solid Waste Managers, partners or the proprietor is debarred / blacklisted by
Central govt. organization / State Govt. organization / ULB / Any Municipal Corporation /
VMC or any other Agency of Government of India or any of the State Government.
(ii) If, any of Solid Waste Managers, partners or the proprietor has a criminal history or has
been convicted by any court of law for any of the offenses under any Indian laws.
(iii) If any agency has stopped the allotted work/department has cancelled the work due to
poor workmanship during the tenure of contract period then such agency will not be eligible
for tender technical bid & such tenders will be rejected.
(iv) If, any criminal proceeding is pending in any court of law in India against any of Solid
Waste Managers, partners or a proprietor and if any such proceeding culminates into
(v) If, any criminal proceeding is pending in any court of law in India against any of Solid
Waste Managers, partners or a proprietor and if any such proceeding culminates into
However; merits of such actions will be reviewed by Municipal Commissioner; VMC (If need
be) and can take decision accordingly after review, which will be final & binding to all
Note: The experience as sub-contractor shall not be considered.
(SECTION - III) INFORMATION REGARDING TENDER
SUBMISSION, & MEMORANDUM OF WORKS FOR THE
GUIDANCE OF CONTRACTORS
INFORMATION TO TENDERER:
180 days (One hundred and Eighty days) from
Tender validity period the date of opening of price bid
Earnest Money Deposit Rs. 156,01,50,862/-
Initial Security Deposit As per conditions of contract 10, clause
For Commissioning of Plant,
12 months (excluding Monsoon) Construction
& Commissioning of Pre-Sorting Unit for
Presorting of Waste by Trommels having
Primary Treatment facility including Compost
Time of Completion pad, Construction & Commissioning of
Refinement Unit and all other required unit for
processing of waste into Compost & RDF.
For Treatment of Total Quantity of MSW:
Years (120 months) from the date of
commissioning and operation of the Plant.
Rs. 1,00,000 per day after the completion of the
period of Twelve months from the 15th day of the
allotment of land and finalization of design/lay-
Penalty for delay out/detailed drawing by authority. If the delay
exceeds 90 days, VMC may initiate termination
of contract along with forfeiture of Security
Signature of The Contractor Executive Engineer SWM
(SWM) Vadodara Municipal
SUBMISSION OF TENDER:
(Following condition shall supersede relevant condition mentioned elsewhere in the bidding
E.M.D & Tender fee shall be submitted in electronic format only through online (by
scanning) while uploading the bid. This submission shall mean that E.M.D & tender fee are
received for purpose of opening the Bid. Accordingly, offer/tenders of those tenders whose
E.M.D & tenders fee is received electronically, shall be opened. However, for the purpose of
realization of EMD and tender fee, bidder shall send the EMD as well as Tender fee in
required format in original through RPAD/Speed post so as to reach to VMC Solid Waste
Manager office within physical submission period. Punitive action shall be initiated for
non-submission of EMD & Tender fees in original to Account Department (Main Office) by
bidder including abeyance of registration and cancellation of E- tendering code for one
year. All other documents of supporting of Bid shall be submitted in electronic format only
through online (by scanning) during the bidding period & hard copy.
i. All Documents must be colored scanned to be seen as original. Scanning in Black
and White or gray shall not be acceptable.
ii. All the Documents must be notarized with clearly displaying stamp, number
and name of the notary.
iii. Price Bid shall have to be quoted strictly online only. No hard copy of price bid
shall be accepted.
iv. Addenda/corrigenda to these tender documents, if issue must be signed and
submitted online (through scanning) and also in Hard Copy.
“All the Documents shall be submitted in hard copy also, to Vadodara Municipal
Corporation by all bidders”
Technical bid and qualification documents mentioned in the tender shall be submitted in soft
Price bid shall not to be submitted in physical form. Please note that Non – Submission of Hard
Copies of technical Bid as well as price Bid does not absolve the bidders from any liability
created from the bid condition and bidding process. price bid shall have to be quoted strictly
Signing Of Contract Agreement
Tenderer if at the time of award of work, wants to create new SPV firm for Exclusive
execution of this work then he/ they can submit the details to municipal Commissioner,
Vadodara. Municipal commissioner is authorized to approve SPV.
At later stage bidder may form SPV, to enter into agreement and payment will be issued on
The Selected Bidder has since promoted and incorporated the firm as a SPV firm and has
vide its letter dated………………….requested the Authority to accept the firm as the entity
which shall undertake and perform the obligations and exercise the rights of the Selected
Bidder under the bid, including the obligation to enter into this Agreement pursuant to the
LOA for executing the Project (as hereinafter defined); (Optional).
Formation of Special Purpose Vehicle (SPV) for Project Execution
The Selected Bidder may undertake and perform the obligations and exercise the rights
of the Selected Bidder under the Project including the obligation to enter into Agreement
for the entire work of this Project through its Special Purpose Vehicle (“SPV”).
Selected Bidder under the Project including the obligation to enter into Agreement
for the entire work of this Project through its Special Purpose Vehicle (“SPV”).
Formation of SPV is purely optional and if bidder wants to execute the project
through SPV then Bidder has to submit the Name of Proposed SPV along with
Tender document at the time of technical bid submission.
Bidder has to submit the Name of Proposed SPV along with Tender document at the
time of technical bid submission.
The selected bidder & / or its Director/Partner/Member shall hold major equity stake
in the SPV at all times during the term of the operation Period.
The SPV and Bidder, both will be equally liable for all tender conditions and
Performance bank guarantee / security deposit for the entire work shall be submitted
by the SPV firm.
Any change in SPV structure, has to be approved by commissioner / competent
Moreover, all the administrative, legal & financial correspondence with VMC shall be
done by SPV only.
VMC will give work order and payments etc. to SPV.
Memorandum of Works
I / We the undersigned do hereby tender for carrying-out the work described in the
schedule subject to the conditions annexed in Schedules attached herewith in tender
DESIGN, BUILD, ERECTION, COMMISSIONING,
OPERATION AND MAINTENANCE OF 500 TPD
General Description of
1 CAPACITY MUNICIPAL SOLID WASTE TO
COMPOST PLANT AT - VADODARA FOR A
PERIOD OF 10 YEARS.
Security Deposit and
3 Release of Security As per conditions of contract 10, clause
Rs. 1,00,000 per day after the completion of the
Compensation period of Twelve months from the 15th day of the
4 for delayed allotment of land and finalization of design/lay-
out/detailed drawing by authority. If the delay
work exceeds 90 days, VMC may initiate termination of
contract along with forfeiture of Security Deposit.
Signature of The Contractor Executive Engineer SWM
(SWM) Vadodara Municipal
IMPORTANT POINTS TO BE BROUGHT TO TENDERER'S NOTICE THE TENDER
MAY BE REJECTED OUTRIGHT IF THE TENDERER
A. Stipulates the validity period less than what is stated in the form or tender.
B. Stipulates his own conditions.
C. Does not quote his rates exclusive of GST in his rates.
D. Does not disclose the full names and addresses of all his partners in the case of
partnership concern.
E. Does not fill in and sign the tender form as well as the bill of quantities and rates
annexure, specification set.
F. Does not pay the Earnest Money Deposit by Pay Order or demand draft with the bid of
G. Does not submit the tender before the stipulated time on the specified date in the
accounts office as directed.
Signature of The Contractor Executive Engineer SWM
(SWM) Vadodara Municipal
GENERAL RULES AND DIRECTIONS FOR THE GUIDANCE OF
1. All work proposed to be executed under this contract shall be notified in a form of
invitation to tender Posted on a board hung up in the Municipal Office and signed by the
Officer authorized by the VMC.
2. This form will state the work to be carried out, as well as the date for submitting and
opening of the tender, earnest money to be deposited with the tender, and the amount of
security deposit to be deposited by the successful tenderer and the percentage, if any to be
deducted from bills. It will also state whether a refund of quarry fees, royalties, octroi dues,
ground rents and water- charges will be granted. Copies of the specifications, designs,
drawings and estimated rates, schedule rates and any other documents required in
connection with the work which will be signed by the Solid Waste Manager (Solid Waste
Management), for the purpose of identification shall also be opened for inspection by
Contractors at the Office of the Solid Waste Manager (Solid Waste Management) during
3. Where the works are proposed to be executed according to the specification
recommended by a Contractor and approved by a competent authority on behalf of the
Vadodara Municipal Corporation such specification with designs and drawings shall form
part of the accepted tender.
4. In the event of the tender being submitted by a firm, it must be signed by each partner
thereof, and in the event of the absence of any partner, it shall be signed on his behalf by a
person holding a power-of-attorney authorizing him to do so and authority letter to be
uploaded in soft copy.
5. Receipt for payments made on account of any work when executed by a firm, should
also be signed by all the partners, except where the contractors are described in their tender
as a firm in which case the receipts shall be signed in the name of the firm by one of the
partners, or by some other person having authority to give effectual receipt for the firm.
6. Any person who submits a tender shall fill up the usual printed form including the column
total according to specific item, stating at what rate he is willing to undertake each item of
the work. Tenders which propose any alteration in work specified in the said form of
invitation to tender, or in the time allowed for carrying out the work, or which contain any
other conditions of any sort, will be liable to rejection. No single tender shall include more
than one work, but contractors who wish to tender for two or more works shall submit a
separate tender for each. Tenders shall have the name and the number of the works to
which they refer written outside the envelope.
7. The Commissioner or his duly authorized Assistant will open tenders in the presence of
any intending contractors who may be present at the time, and will enter the amounts of the
several tenders in a comparative statement in suitable form. In the event of a tender being
accepted, the contractors shall there upon, for the purpose of identification, sign copies of
the specifications and other documents mentioned in Rule 1. In the event of a tender being
rejected the deposit will be refundable on application.
8. The Vadodara Municipal Corporation shall have the right of rejecting all or any of the
tenders without assigning any reasons.
9. No receipt for any payment alleged to have been made by a Contractor regard to any
matter relating to this tender or the contract shall be valid and binding to the Vadodara
Municipal Corporation unless it is signed by Solid Waste Manager (Solid Waste
10. The memorandum of work to be tendered for and the schedule of materials to be
supplied by the Vadodara Municipal Corporation and their rates shall be filled in and
completed by the office of the VMC before the tender form issued. If a form issued to an
intending tenderer has not been so filled in and completed, he shall request the said office to
have this done before he completes and delivers his tender.
11. All work shall be measured net by standard measure and according to the rules and
custom of the Vadodara Municipal Corporation without reference to any local custom.
12. Under no circumstances shall any Contractor be entitled to claim enhanced rates for any
items in this Contract, unless specified.
13. Every Contractor shall, if so desired by the Commissioner, VMC, produce along with his
tender a banker's certificate of his financial stability. If he fails to produce such a certificate
his tender will not be considered.
14. All corrections and additions or pasted slips should be initialed.
15. The checking and measurements of work will be taken according to the usual method in
use in the VMC and no proposals to adopt alternative methods will be accepted.
16. The Commissioner, VMC's decision as to what is the "usual method in use, in the VMC
17. The successful tenderer shall submit the copy of technical bid duly sealed & signed
within fifteen days of issue of work order.
18. The tenderer shall invariably submit the Certificate of Provident Fund of Employee
without which bill for payment shall not be processed.
19. The successful tenderer shall submit the copy of labor license and all required policies
within fifteen days of issue of work order.
20. All the RCC NP3/NP4 Class pipes shall have ISI mark on it.
21. For the necessary modification / alteration / addition to complete the job, if any civil
breaking or repairing is to be done, shall have to be carried out by contractor at his own
cost, as per standard engineering practice. It shall be sole responsibility of contractor to
clear construction and demolition waste (C&D Waste) by their own risk and cost. The
contractor shall ensure that their site must be clear in all respect by disposing C&D Waste
generated during the work. If it's found that contractor is irregular and showing negligence to
dispose C&D Waste than VMC is empowered to dispose the said C&D waste through VMC
authorized C&D Waste contractor/agency. All the necessary expenditure made towards
disposal of this C&D Waste shall be recovered from the contractor along with the
administrative charges and penalties.
22. Unbalanced offer
In event of bid price being considered unbalanced in case of rates being higher or lower of
the reasonable rates as may be considered by VMC, than VMC may direct the bidder to
deposit separately Security deposit of the amount of unbalanced contract in addition to
regular security deposit. This deposit shall be released only on completion of the Project
work along with the balance of Security deposit being released.
23. Patent Rights
In the event of any claim asserted by a third party of infringement of copyright, patent,
trademark or industrial design rights arising from the use of the Goods or any part thereof in
the Purchaser‟s country, the supplier shall act expeditiously to extinguish such claim. If the
supplier fails to comply and the Purchaser is required to pay compensation to a third party
resulting from such infringement, the supplier shall be responsible for the compensation
including all expenses, court costs and lawyer fees. The Purchaser will give notice to the
supplier of such claim, if it is made, without delay.
Signature of The Contractor Executive Engineer SWM
(SWM) Vadodara Municipal
FOR CONSTRUCTION / ERECTION / COMMISSIONING / INSTALLATION / REPAIRS
MAINTENANCE / RENOVATION / FABRICATION OF STRUCTURE INCLUDING
BUILDING (MEANS ALL WORKS CONTRACT / TURN KEY PROJECT / SUPPLY OF
MATERIAL / GOODS)
1. GST (GOODS & SERVICE TAX) has come in existence from 1st July 2017. Contractor /
Successful Bidder is bound to pay any amount of GST prescribed by the Govt. of India as
per the Terms of Contract agreed upon during the course of execution of this Contract.
However, all the quoted rates must be EXCLUSIVE of GST.
2. During the course of execution of Contract, if there is any change in rate of GST (Goods
& Service Tax) by the Government the same shall be reimbursed / recovered separately by
VMC, subject to the submission of original Receipt / Proof for the amount actually remitted
by the successful Tenderers/ Contractor to the competent Authority along with a certificate
from chartered Accountant of Contractor/ Successful Bidder certifying that the amount of
GST paid to the Government and the same shall be intimated /submitted / claimed within
30 (Thirty) Days from the date of payment Remittance of GST within stipulated period shall
be the sole responsibility of the Successful Bidder /Contractor, failing which, VMC may
recover the amount due, from any other payable dues with VMC and decision of Municipal
commissioner shall be final and binding on the Contractor / Successful Bidder in this
regard. Further the non-payment of the GST to the Government may lead to the termination
of contract and forfeiture of Security Deposit /Performance Guarantee Amount.
3. If any other new taxes / Duties /Levies / Cess or any other incidentals etc. or any
increase in the existing taxes / Duties /Levies / Cess or any other incidentals etc. (Excluding
GST) are imposed during the course of the contract, the same shall be borne by contractor
/ successful Bidder only, in no case VMC shall be liable for the same.
4. The Contractor will submit the invoice to the VMC having GSTIN of VMC mentioned
therein and the taxes shall be shown separately on the face of the invoice so as to claim as
Signature of The Contractor Executive Engineer SWM
(SWM) Vadodara Municipal
(SECTION - IV) DEFINITIONS & INTERPRETATIONS, CONDITIONS
OF CONTRACT,& SPECIAL CONDITIONS OF CONTRACT
DEFINITIONS AND INTERPRETATIONS:
In the contract documents, as herein defined the following words and expression used shall,
unless, repugnant to the subject or context thereof, have the following meanings assigned to
The "Owner/Municipal Corporation, VADODARA represented by Municipal Commissioner / City
Engineer / Director / Executive Engineer, any officer authorized by the Municipal
The "Contractor" shall mean the person or the persons, firm of company whose tender has been
accepted by the owner and includes his legal representative successors and permitted
The "Engineer-in-charge" shall mean the person designated as such by the owner from time to
time and shall include those who are expressly authorized by the Municipal Corporation to act
for and on its behalf for the operation of this contract.
"Engineer - in - charge's Representative" shall mean any Engineer or Asst. to the Engineer-in-
charge designated from time to time by the Engineer-in-charge to perform duties set forth in
the Tender documents whose authority shall be notified in writing to the Contractor by the
Engineer-in-charge.
"Tender" The offer or proposal of the Tenderer submitted in the prescribed form setting forth
the prices for the work to be performed, and the details thereof.
"Contract Price shall mean total money payable to the Contractor under the contract
"Addenda" shall mean the written or graphic notices prior to submission of tender which modify
or interpret the contract documents.
"Contract Time" - The number of consecutive calendar months for the completion of work as
stated in the executed contract agreement.
"Contract" shall mean agreements between the parties for the execution of works including
therein all contract documents.
"Tender document" shall mean Designs, Drawings, specifications, agreed variations, if any,
and such other documents constituting the tender and acceptance thereof.
The Specifications shall mean all directions' the various technical specifications provisions and
requirements attached to the contract which pertain to the method and manner or performing
the work to the quality of the work and the materials to be furnished under the contract for the
work and any order(s) or instruction (a)hereunder.
It shall also mean the latest Indian Standards Institution Specifications for or relative to
the particular work or part thereof, so far as they are not contrary to the Tender
specifications or I.S.I. specifications, and in absence of any tender specifications, the
specifications of any other country applied in India as a matter of Standard
Engineering practice and approved in writing by the Engineer- in-charge with or without
The "Drawing" shall include maps, plans, tracings or prints thereof with any modifications
approved in writing by the Engineer-in-charge and such other drawings, as may, from time to
time, be furnished or approved in writing by the Engineer-in-charge in connection with the
The "Work" shall mean the works to be executed in accordance with the context or the part
thereof as the case may be and shall include extra, additional altered or substituted works as
required for the purpose of the Contract. It shall mean the totally of the work by expression or
implication envisaged in the contract and shall include all material, equipment and labour
required for or relative or incidental to or in connection with the commencement, performance
and completion of any work and/or for incorporation in the work.
The "Permanent work "means works which will be incorporation in and form part of the
work to be handed over to the owner by the contractor on completion of the contract.
The "Temporary Work" shall mean all temporary works of every kind required in or about the
execution, completion and maintenance of the work.
"Site shall mean the land and other place on, under, on or through which the work is to be
carried out and any other lands or places provided by the Municipal Corporation for the purpose
of the Contract together with any other places designated in the Contract as forming part of the
"The Construction Equipment" means all appliance/equipment‟s of whatever nature required in
or for execution, completion or maintenance of work or temporary works (as hereinafter
defined) but does not include materials or other things intended to form or forming part of the
permanent work.
"Notice in Writing or Written Notice" means a notice written, types or printed form delivered
personally or sent by Registered post to the latest know private of business address at
Registered Office of the Contractor.
The "Alteration/Variation order" means an orders given in writing by the Engineer-in-charge
to effect additions to or deletion from and alterations in the work.
"Final Test Certificate" shall mean the final test Certificate issued by the owner within the
provisions of the Contract.
The "Completion Certificate" shall mean a certificate to be issued by the Engineer-in-charge
when the work has been completed to his satisfaction.
The "Final Certificate" shall mean the final certificate issued by the Engineer-in-charge
after the work is finally accepted by the owner.
"Defect Liability Period" shall mean the specified period between the issue of
completion Certificate and the final certificate as specified in the tender.
"Approved" shall mean approved in writing including subsequent modification in writing of
previous verbal approval and "Approval" means approved in writing including as aforesaid.
"Letter of Acceptance" shall mean an intimated by a letter to tenderer that the tender has been
accepted in accordance with provisions contained therein.
"Order" and "Instruction" shall respectively mean any written order or instruction given by the
Engineer-in- charge within the scope of his powers in terms of the Contract.
"Running Account Bill" shall mean a Bill for the payment of "On Account" money to the
contractor during the progress of work on the basis of work done and the non-perishable
materials to be incorporated in the work supplied by the Contractor.
"Security Deposit" shall mean the deposit to be held by the owner as security for the due
performance of contractual obligations.
CONDITIONS OF CONTRACT
Clause 1: Security Deposit
The person/persons whose tender may be accepted [here- in after called the Contractor,
which expression shall unless excluded by or repugnant to the context include his heirs,
executors, administrators and assignees] shall [within 10 days of the receipt by him of
the notification of the acceptance of his tender] deposit with Municipal Commissioner cash or
Government securities endorsed to the Municipal Commissioner sum sufficient which will make
up the full security deposit specified in the tender.
If the amount of the security deposit to be paid in lump sum within the period specified above is
not paid the tender contract already accepted shall be considered as cancelled. The security
deposit lodged by Contractor shall be refunded after the expiry of the Defects Liability period
after deducting dues, if any, which become liable to be recovered from the Contractor under the
terms and conditions of this Agreement.
Sr. No. Security Deposit Description for payment and release.
Contractor shall provide in the form of crossed
demand draft / pay order / BG in favor of the
Municipal Commissioner, Vadodara on any
Nationalized Bank / Schedule bank / Banks
5%of Capital work (Civil mentioned in VMC circular Bank / Schedule
+ Mechanical) amount bank/Banks mentioned in VMC circular,
1 as mentioned in tender payable at Vadodara only.
document as Security
deposit 5% will be released after Completion of
Civil and Mechanical Work and after due
clearance from Audit Department of VMC
without any interest. The amount will be paid
as per the payment terms and condition of
Vadodara Municipal Corporation.
Note: - Release of Any kind of Performance Security will be subjected to that any defect if found
shall have to be rectified /complied as per the direction given by Engineer in Charge, within the
said periods and after due clearance from Audit Department of Vadodara Municipal Corporation.
Operation and Maintenance
For operation and maintenance contract, contractor shall have to sign separate contract.
Sr. No. Security Deposit Description for payment and release.
Contractor shall provide in the form of
crossed demand draft / pay order / BG in
favour of the Municipal Commissioner,
VADODARA on any Nationalized Bank /
Schedule bank / Banks mentioned in VMC
circular Bank / Schedule bank/Banks
mentioned in VMC circular, payable at
5% will be released after Completion of
5% of 1st year of O&M Contract The security deposit for
Operation and operation and maintenance work will be
1 Maintenance contract released after completion of O&M contract,
amount as Security handing over site inclusive of civil,
deposit. mechanical, electrical, and other component
in working condition and after completion of
relevant procedures as per the terms and
conditions of Vadodara Municipal
Corporation. Moreover, clearance from
Vadodara Municipal Corporation, Solid Waste
Management Department and Audit
Department shall be obtained for releasing of
deposit amount.
Deficit amount of SD = (Estimated contract
amount of next year x 5%) – SD of
previous years as per the work order.
The amount will be released after completion
Additional Security
of O&M contract, handing over site inclusive
of civil, mechanical, electrical, and other
2 component in working condition and after
contractor each year
completion of relevant procedures as per the
from 2nd Year to 5th
terms and conditions of Vadodara Municipal
Corporation. Moreover, clearance from
Vadodara Municipal Corporation, Solid Waste
Management Department and Audit
Department shall be obtained for releasing of
security deposit amount.
In addition to above as and when directed additional security deposit as indicated
Unbalanced Offer Clause, also will be required to be deposited in event of VMC demanding
the same because it finds the offer unbalanced. Notwithstanding anything to the contrary
contained in this Agreement, the Parties agree that in the event of failure of the Contractor
to provide the security deposit in accordance with the provisions and within the time
specified therein or such extended period as may be provided by the VMC, in accordance
with the provisions, the VMC may en-cash the EMD and appropriate the proceeds there of
as Damages, and thereupon all rights, privileges, claims and entitlements of the Contractor
under or arising out of this Agreement shall be deemed to have been waived by, and to
have ceased with the concurrence of the Contractor, and this Agreement shall be deemed
to have been terminated by mutual agreement of the Parties.
If contractor fails to remit the security deposit within 15 days from the date of work order,
then penalty at the rate of 0.065% per day of the amount of security deposit will be
charged. If the security deposit is not paid within one month with penalty, necessary actions
as per the conditions of contract will be taken as per the norms of VMC. To levy penalty
charges or not will be under the rights and sole discretion of Vadodara Municipal
The time allowed for carrying out the work as entered in the tender shall be strictly
observed by the Contractor and shall be reckoned from the date on which the order to
commence work is given to the Contractor. The work shall throughout the stipulated period
of the contract be proceeded with, all due diligence [time being deemed to be the essence
of the contract on the part of the Contractor] and the Contractor shall pay as compensation
of the amount [shown in the attached Memorandum] of the tendered cost of the whole work
as shown by the tender for every day that the work remains uncommented or unfinished
after the proper days. And further to ensure good progress during the execution of the work
the Contractor shall be bound, in all cases in which the time allowed for any work exceeds
one month, to complete parts of the work during the period shown in the attached
In the event of the Contractor failing to comply with these conditions he shall be liable to
pay as compensation, the amount mentioned above for every day that the due quantity of
work remained incomplete, provided always that the total amount of compensation to be
work remained incomplete, provided always that the total amount of compensation to be
paid under the provision of this clause shall not exceed 10 percent of the tendered Security
Deposit as shown in the tender.
In any case in which under any clause of or clauses of this contract, the Contractor shall
have tendered himself liable to pay compensation amounting to the whole of this security
deposit [whether paid in one sum or deducted by installments] or in the case of
abandonment of the work owing to serious illness or death of the contractor or any other
cause, the Commissioner on behalf of the Corporation shall have power to adopt any of the
following courses, as he may deem best suited to the interest of the Municipal Corporation.
a. To rescind the contract [of which rescission notice in writing to the Contractor under
the hand of the Commissioner shall be conclusive evidence] and in that case that security
deposit of the Contractor shall stand forfeited and be absolutely at the disposal of the
Municipal Corporation.
b. To employ labour paid by the Solid Waste Management Department and to supply
material to carry out the works, or any part of the work debiting the Contractor with
correctness of which cost and price the certificate of the Solid Waste Manager (SWM
Department) shall be final and conclusive against the Contractor and crediting him with the
value of the work done, in all respects in the same manner and at the same rates as if it
had been carried out by the Contractor under the terms of his contract, and in that case the
certificate of the Solid Waste Manager (SWM Department)as to the value of the work done
shall be final and conclusive against the Contractor.
c. To order that the work of the Contractor be in measured up and to take such part
thereof as shall be executed out of his hands, and to give it to another Contractor to
complete, in which case any expenses which may be incurred in excess of the sum which
would have been paid to the original Contractor, if the whole work had been executed by
him [as to the amount of which excess expenses the certificate in writing of the Solid Waste
Manager (SWM Department) shall be final and conclusive] be borne and paid by the
original Contractor and shall be deducted from any money due to him by the Municipal
Corporation under the contract or otherwise from his security deposit or the proceeds of
sale thereof, or a sufficient part thereof.
d. In the event of any of the above courses be adopted by the Commissioner the
Contractor shall have no claim to compensation for any loss sustained by him by reason of
his having purchases or procured any materials or entered into any engagements or made
any advances on account of or with a view to the execution of the work or the performance
of the contract. Andin case the contract shall be rescinded under provision aforesaid, the
Contractor shall not be entitled to recover, or be paid any sum for any work thereto actually
performed by him under this contract unless and until the Solid Waste Manager (SWM
Department) shall have certified in writing the performance of such work and the amount
payable to him in respect thereof, and he shall only be entitled to be paid the amount so
certified. For any work there to actually performed by him under this contract unless and
until the Solid Waste Manager (SWM Department) shall have certified in writing the
performance of such work and the amount payable to him in respect thereof, and he shall
only be entitled to be paid the amount so certified.
In the event of any of the above courses be adopted by the Commissioner the Contractor
shall have no claim to compensation for any loss sustained by him by reason of his
having purchases or procured any materials or entered into any engagements or made any
advances on account of or with a view to the execution of the work or the performance of
the contract. Andin case the contract shall be rescinded under provision aforesaid, the
Contractor shall not be entitled to recover, or be paid any sum for any work thereto actually
performed by him under this contract unless and until the Solid Waste Manager (SWM
Department) shall have certified in writing the performance of such work and the amount
payable to him in respect thereof, and he shall only be entitled to be paid the amount so
certified. For any work there to actually performed by him under this contract unless and
until the Solid Waste Manager (SWM Department) shall have certified in writing the
performance of such work and the amount payable to him in respect thereof, and he
shall only be entitled to be paid the amount so certified.
If the progress of any particular portion of the work is unsatisfactory the Commissioner shall
notwithstanding that the general progress of the work is satisfactory in accordance with
Clause 2, be entitled to take action under Clause 3 [b] after giving the Contractor 10 days
notice in writing and the Contractor will have no claim for compensation for any loss
sustained by him owing to such action.
In any case in which any of the powers conferred upon the Commissioner by clause 3 and
4 hereof shall have become exercisable and the same shall not have been exercised the
non- exercise thereof shall not constitute a waiver of any of the conditions hereof such
powers shall not withstanding be exercisable in any future case default by the Contractor
for which by any clause or clauses hereof he is declared liable to pay compensation
amounting to the whole of his security deposit and the liability of the Contractor for
past and future compensation shall remain unaffected.
In the event of the Commissioner taking action under the sub-clause (a) or (c) of clause
3, he may, be he so desires to take possession of all or any tools; plant materials and
stores in or upon the works, or the site thereof or belonging to the Contractor, or procured
by him and intended to be used for the execution of the work of any part thereof, paying
or allowing for the same in account at the contract rates, or in the case of contract rates
not being applicable at current market rates, to be certified by the Solid Waste Manager
(SWM Department) whose certificate thereof shall be final. In the alternative the
Commissioner may, by notice in writing to the Contractor or his clerk of the works, foremen
or other authorized agent require him to remove such tools, plant, materials, or stores
from the premises within a time to be specified in such notice; and in the event of the
Contractor failing to comply with any such requisition, the Commissioner may remove
them at the Contractor's expense or sell them by auction or private sale at the risk and
account of the Contractor in all respects and certificate of the Solid Waste Manager (SWM
Department)as to the expense of any such removal, and the amount of the proceeds and
expense of any sale shall be final and conclusive against the Contractor.
If the Contractor shall desire an extension of the time for completion of the work on the
ground of his having been unavoidably hindered in its execution or on any other ground,
he shall apply in writing to the Commissioner within 30 days from the date on which
he was hindered as aforesaid or on which the cause for asking for extension occurred
and the Commissioner may, if in his opinion, there are reasonable grounds for granting an
extension, grant such extension as he thinks necessary or proper. The decision of the
Commissioner in this matter shall be final.
On the completion of the work the Contractor shall be furnished with a certificate by the
Solid Waste Manager (SWM Department)of such completion, but no such certificate shall
be given nor shall the work be considered to complete until the Contractor shall have
removed from the premises on which the work shall have been executed all
scaffolding, surplus materials and rubbish, and shall have cleaned of the dirt from all
woodwork, doors, windows, walls, floors or other parts of any building, in or upon which the
work has been executed, or of which he may have had possession for the purpose of
executing the work, nor until the work shall have been measured by the Engineer-in-
charge or where the measurement have been taken by his subordinates until they have
received the approval of the Engineer-in-charge, the said measurement being binding and
conclusive against the Contractor. If the Contractor shall fail to comply with the
requirements of this clause as to the removal of scaffolding, surplus materials and
rubbish, and cleaning off dirt on or before the date fixed for the completion of the work,
the Engineer-in- charge may, at the expense of the Contractor remove such scaffolding
surplus materials and rubbish, and dispose off the same as he thinks fit and clean off
such dirt as aforesaid; and the Contractor shall forthwith pay the amount of all expenses
so incurred, but shall have no claim in respect of any such scaffolding or surplus materials
as aforesaid except for any sum actually realized by the sale there of.
No payment shall be made for any work, estimated to cost less than Rupees one
thousand, till after the whole of the said work shall have been completed and a certificate of
completion given. But in the case of works estimated to cost more than rupees one
thousand, the Contractor shall, on submitting a monthly bill therefore be entitled to receive
payment proportionate to the percentage shown in the attached Memorandum of the part of
the work than approved and passed by the Engineer-in-charge, whose certificate of such
approval and passing of the sum so payable shall be final and conclusive against the
All such intermediate payments shall be regarded as payments by way or advance against
the final payments only and not as payments for work actually done and completed and
shall not preclude the Engineer-in-charge from requiring bad, unsound imperfect or
unskillful work to be removed and taken away and reconstructed, or re- erected, nor shall
any such payments be considered as an admission of the due performance of the contract
or any part thereof in such respect of the accruing of and claim; nor shall it
conclude, determine or affect in any way the Powers of the Engineer-in-charge as to the
final settlement and adjustment of the accounts or otherwise, or in any other way vary or
affect the contract. The final bill shall be submitted by the Contractor within one month of
the date fixed for the completion of the work, otherwise the Engineer-in- charge's
certificate to the measurement and of the total amount payable for the work shall be final
certificate to the measurement and of the total amount payable for the work shall be final
and binding on all parties.
The rates for several items of the work agreed to within, shall be valid only when the item
concerned is accepted as having been completed fully in accordance with the sanctioned
specifications. In cases where the items of works are not accepted and so completed the
Engineer-in-charge may make payment on account of such items at such reduced rates
as he may consider reasonable in the preparation of final or on account bills.
A bill may be submitted by the Contractor once in each month on or before the date fixed
by the Engineer-in-charge for all works executed in the previous months, and the Engineer-
in- charge shall take or cause to be taken the requisite measurement for the purpose of
having the same verified, and the claim, so far as it is admissible shall be adjusted if possible
within fifteen days from the presentation of the bill. If the Contractor does not submit the bill
within the time fixed as aforesaid, the Engineer-in- charge may depute a subordinate to
measure up the said work in the presence of the Contractor or his duly authorized agent
whose counter signature to the measurement list shall be sufficient warrant, and the
Engineer-in-charge may prepare a bill from such list which shall be binding on the
Contractor in all respects.
The Contractor shall submit all bills on the printed forms to be hand on application at the
office of the Engineer-in-charge. The charges to be made in the bills shall always be
entered at the rates specified in the tender or in the case of any extra work ordered in
pursuance of these conditions, and not mentioned or provided for in the tender at the rates
hereinafter provided for such work.
If the specification or estimate of the work provides for the use of any special description of
materials to be supplied from the VMC Store or if it is required that the Contractor shall
use certain stores to be provided by the Engineer-in-charge (such materials and stores
and the prices to be charged thereof as hereinafter mentioned being so fair as practicable
for the convenience of the Contractor but not so as in any way to control the meaning or
effect of the contract specified in the schedule or memorandum hereto annexed) the
Contractor shall be supplied with such materials and stores as may be required from time to
time to be used by him for the purpose of the Contract only and the value of the full
quantity of materials and stores so supplied shall be set off deducted from any sums
then due, or thereafter to become due to the Contractor under the contract, or otherwise
from the security deposit or the proceeds of sale thereof shall be held in Government
securities; the same or a sufficient portion thereof shall in that case be sold for the purpose.
All material supplied to the Contractor shall remain the absolute property of the Municipal
Corporation and shall on no account be removed from the site of the work and shall always
be opened to inspection by the Engineer-in- charge. Any such materials unused and in
perfectly good condition at the time of completion or determination of the contract shall be
returned to the Vadodara Municipal Corporation store, if the Engineer-in-charge so requires
by a notice in writing given under his hand, but the Contractor shall not be entitled to return
any such materials except with such consent and he shall have no claim for compensation
on account of any such materials supplied to him as aforesaid but remaining unused by him
or for any wastage in or damage thereto.
The Contractor shall execute the whole and every part of the work in the most substantial
and workman like manner, and both as regards materials and in every other respect in
strict accordance with the specifications. The Contractor shall also conform exactly, fully
and faithfully to designs, drawings and instructions in writing relating to the work
signed by the Engineer-in-charge and lodged in his office and to which the Contractor
shall be entitled to have access for the purpose of inspection at such office, or on the
site of the work during office hours, and the Contractor shall, if he so requires, be entitled
at his own expenses to make or cause to be made copies of the specifications and of all
such designs, drawings and instructions on aforesaid.
The Engineer-in-charge shall have power to make any alterations in, or additions to the
original specifications, drawings, designs and instructions that may appear to him to be
necessary or advisable during the progress of the work, and the Contractor shall be bound
to carry out the work in accordance with any instructions in this connection which may be
given to him in writing signed by the Engineer-in-charge and such alteration shall not
invalidate the contract, and any additional work which the Contractor may be directed to do
in the manner above specified as part of the work shall be carried out by the Contractor on
the same conditions in all respect on which he agreed to do the main work and at the
same rates as are specified in the tender for the main work. And if the additional and altered
work includes any class of work for which on rates is specified in this contract, then such
class of work shall be carried out at therates entered in the schedule of rates of the
Municipal Corporation or at the rates mutually agreed upon between the Engineer- in-
charge and the Contractor whichever are lower if the additional or altered work for which
no rate is entered in the schedule of rates of the Municipal Corporation is ordered to be
carried out before the rates are agreed upon then the Contractor shall, within seven days of
the date of the receipt by him of the order to carry out the work, inform the Engineer-in-
charge of the rate which it is his intention to charge for such class of work and if the
Engineer-in- charge does not agree to this rate he shall be notice in writing be at liberty to
cancel his order to carry out such class of work, and arrange to carry it out in such
manner as he may consider advisable provided always that if the Contractor shall
commence the work or incur any expenditure in regards thereto before the rates shall have
been determined as lastly herein before mentioned, then in such a case he shall only be
entitled to be paid in respect of the work carried out or expenditure incurred by him prior to
the date of the determination of the rate as aforesaid according to such rate or rates as shall
be fixed by the Engineer-in-charge. In the event of a dispute, the decision of the
Commissioner will be final.
However, the work shall have to be executed according to the designs,
drawings and specifications recommended by the Contractor and accepted by the
competent authority the alteration above referred to shall within the scope of such
designs drawings and specification appended to the tender.
The time limit for the completion of work shall be extended in the proportion that the
increase in its cost occasioned by alterations or additions the cost of the original
contract work, and the certificate of the Engineer-in-charge as to such proportion shall be
A. If at any time after the execution of the contract documents, the Engineer-in- charge
shall for any reason whatsoever, require the whole or any part of the work as
specified in the tender, to be stopped for any period or shall not require the whole or part
of the work to be carried out at all or to be carried out by the Contractor, he shall give notice
in writing of the fact to the Contractor who shall thereupon suspend or stop, the work totally
or partially, as the case may be. In any such case, except as provided herein under, the
Contractor shall have no claim to any payment or compensation whatsoever on account of
any profit or advantage which he might have derived from the execution of the work in full
but which he did not so derive in consequence of the full amount of the work nor having
been carried out, or on account of any loss that he may be put to on account of materials
purchased or agreed to be purchased, or for unemployment of labour recruited by him. He
shall not also have any claim for compensation by reason of any alteration having been
made in the original specifications, drawings, designs and instructions may involve any
curtailment of the work as originals contemplated. Where which however, materials have
already been purchased or agreed to be purchased by the Contractor, before receipt by
him of the said notice, the Contractor shall be paid for such materials at the rate
determined by the Engineer-in- charge, whose decision shall be final. If the Contractor
suffers any loss on account of his having to pay labour charges during the period during
which to stoppage of work has been ordered under this clause the Contractor shall on
application be entitled to such compensation on account of labour charges as the Engineer-
in-charge, the labour could have been employed by the Contractor elsewhere for the
whole or part of the period during which the stoppage of the work has been ordered as
The Contractor shall not be entitled to claim any compensation from the Municipal
Corporation for the loss suffered by him on account of delay by the Municipal
Corporation in the supply of materials entered in schedule A where such delay is caused by-
I. Difficulties relating to the supply of railway wagons and availability of Government
controlled materials.
II. Force majeure
III. Act of God.
IV. Act of the Nation's enemies or any other reasonable cause beyond the control of the
Municipal Corporation.
In the cause of such delay in the supply of materials the Municipal Corporation shall
grant such extension of time for the completion of the work as shall appear to the
Commissioner to be reasonable in accordance with the circumstances of the case. The
decision of the Commissioner as to the extension of time shall be accepted as final by the
The Contractor is to cover up and to protect the works from the weather and is to suspend
all wet operations during such weather which, in the Solid Waste Manager (SWM
Department) opinion, will be detrimental to the work.
Samples of each class of material and workmanship shall be submitted by the Contractor
for the approval of the Solid Waste Manager (SWM Department) and after such approval
these samples shall be deposited at any place the Solid Waste Manager (SWM
Department) may appoint and the Contractor shall be required to perform all the works of
this contract accordance with the samples.
On completion, all work must be cleaned down; rubbish removed, and the works
and land cleaned of rubbish; surplus materials and other accumulations, and everything
left in a clean and ordinary condition. The contractor, even during execution work, has to
comply with all norms of safety, waste collection, disposal, cleaning process as per SWM
Rule 2016 and CPHEEO Manual.
The Contractor shall provide, erect and maintain proper sheds and temporary buildings
for the storage and protection of materials and goods and for the execution of work
which may be fabricated or brought on the site.
The Contractor is to set out and level the works and will be responsible for the accuracy of
the same. He is to provide and maintain measuring and surveying instruments including
steel tapes, the odolite and dumpy level at all times for proper carrying of the work and
for the use of the Solid Waste Manager (SWM Department) and his representatives
including skilled attendance. He shall also be responsible for the correctness of the
positions, levels, dimensions and alignment of all parts of the structure as shown in the
drawings supplied to him. If at any time any error shall appear during the progress of
any part of the work, the Contractor shall at his own expense rectify such error if called
upon to the satisfaction of the Solid Waste Manager (SWM Department).
The Contractor shall permit the execution of the work not provided for in the tender by
artists; tradesman, or others engaged by the Municipal Corporation. The Contractor shall
allow all reasonable facilities and the use of his scaffolding and water for the execution of
such work but is not required to provide any special scaffolding for the execution of such
work except by special arrangement with the Municipal Corporation.
Under no circumstances whatsoever shall the Contractor be entitled to any compensation
from the Municipal Corporation on any account unless the Contractor shall have submitted a
claim in writing to the Engineer-in-charge within one month of cause of such claim
If at any time before the security deposit is refunded to the Contractor, it shall appear to the
Engineer-in-charge or his subordinate in charge of the work that any work has been
executed with unsound imperfect, or unskillful workmanship or with materials of inferior
quality; or that any materials or articles provided by him for the execution of the work are
unsound, or of a quality inferior to that contracted for, or otherwise not in accordance with
the contract, it shall be lawful for the Engineer-in- charge to intimate this fact in writing to
the Contractor and then notwithstanding the fact that the work, materials or articles
complained of may have been inadvertently passed, certified and paid for, the Contractor
shall be bound forthwith to rectify, or remove and reconstruct the work so specified
in whole or in part as the case may require, or if so required, shall remove the materials
or articles so specified and provide other proper and suitable materials or
articles at his own charge and cost; and in the event of his failing to do so within a
period to be specified by the Engineer-in-charge in the written intimation aforesaid,
the Contractor shall be liable to pay compensation at the rate of one percent on the
amount of the estimate for every day not exceeding ten days, during which the failure
so continues and in the event of any such failure as aforesaid the Engineer-in-charge
may rectify or remove and re- execute the work or remove and replace the materials
or articles complained or as the case may be at the risk and expense in all
respects of the contractor, should the Engineer-in-charge consider that any such
inferior work or materials as described above may be accepted or made use of it; shall be
within his discretion to accept the same at such reduced rates along with the appropriate
penalty as the Commissioner may deem fit. The period to be counted from that date
of final completion and handing over of the work to the Municipal Corporation during which
the Contractor is so liable for any defects in the work shall be the Defects Liability Period
shown in the attached Memorandum.
All works under in cause of execution or executed in pursuance of the contract shall at
all time be open to the inspection and supervision of the Engineer-in- charge and his
subordinates, and the Contractor shall at all times during the usual working hours, and at
all other times at which reasonable notice of the intention of the Engineer - in - charge or his
subordinate to visit the work shall have been given to the Contractor, either himself be
present to receive orders and instructions, or have a responsible agent duly accredited in
writing present for that purpose, Orders given to the Contractor's duly authorized agent
shall be considered to have the same force and effect as if they had been given to the
Contractor himself.
The Contractor shall give not less than five day's notice in writing to the Engineer-in-charge
or his subordinate in charge of the work before covering up or otherwise placing beyond
the reach of measurement any work in order that the same may be measured; and correct
dimensions thereof taken before the same is so covered up or placed beyond the reach
of measurement any work without the consent in writing of the Engineer-in-charge or his
subordinate in charge of the work, and if any work shall be covered up or placed beyond the
reach of measurement without such notice having been given or consent obtained, the
same shall be uncovered at the contractor's expense, and in default thereof no payment
or allowance shall be made for such work or for the materials with which the same was
If the Contractor or his workmen; or servants shall break, deface injure or destroy
any part of a building in which they may be working, or any building, road, fence
enclosure or grass land or cultivated ground continuous to the premises on which the work
of any part thereof is being executed, or if any damage shall be done to the work for any
cause whatever while it is in progress of if any imperfection becomes apparent in it
within the Defect liability period mentioned above by the Engineer-in- charge the Contractor
shall make good the same at his own expense, or in default the Engineer-in- charge may
cause the same to be made good by other workmen and deduct the expenses [of
which certificate of the Engineer-in-charge shall be final] from any sum that may be due
or thereafter become due to the Contractor, or from his security deposit or the proceeds of
sale thereof or of a sufficient portion thereof.
The Contractor shall supply at his own cost all materials [except such special materials,
if any, as may be supplied from the VMC Stores in accordance with the contract]. Plant tools,
appliance implements, ladders, cordage, tackle, scaffolding and any temporary works
which may be required for the proper execution of the work, in the original; altered or
substituted from, and whether included in these specifications or, other documents forming
part of the contract or referred to in these conditions he is entitled to be satisfied, or which
he is entitled to require together with carriage there for, to and from the work, the
Contractor shall also supply without charge the requisite number of persons with the
means and materials necessary for the purpose of setting out works and counting,
weighing, and assisting in the measurement of examination at any time and from time to
time of the work or materials, failing this the same may be provided by the Engineer-in-
charge at the expense of the Contractor and the expense may be deducted from any
money due to the Contractor under the contract, or from his security deposit or the
proceeds of sale there for of sufficient portion thereof. The Contractor shall provide all
necessary fencing and lights required to protect the public from accident; and shall also
be bound to bear the expenses of every suit, action or other legal proceedings, at law, that
may be brought by any person for injury sustained owing to negligence of the above
precautions, and to pay damages and costs which may be awarded in any such suit, action
or proceedings, to any such person, or which may with the consent of the Contractor be
paid in compromising any claim by any such person.
The Contractor shall make his own arrangements for drinking water for the labour employed
Compensation for all damage done intentionally or unintentionally or by the contractor‟s
laborers whether in or beyond the limits of the Municipal property shall be estimated by
the Engineer-in-charge or such other office as he may appoint and estimates of the
Engineer- in-charge subject to the decision of the Commissioner on appeal be final and
the Contractor shall be bound to pay the amount of the assessed compensation on
demand failing which the same will be recovered from the Contractor as damage from
the security deposit or deducted by the Engineer-in-charge from any sum that may be due
or become due from the Municipal Corporation to the Contractor under this contract or
The Contractor shall bear the expenses of defending any action or other legal proceedings
that may be brought by any person from injury sustained by him owing to negligence of
precautions to prevent the spread of fire and he shall also pay any damages and cost that
may be awarded by the court inconsequence.
Since this work comes under essential service, the work shall be carried out / executed /
done on Sunday/Holidays.
The contract shall not be assigned or sublet without the written approval of the Engineer-in-
charge, and if the Contractor shall assign or sublet his contract or attempt to do so or
become insolvent or commence any proceedings to be adjudicated an insolvent or make
any composition with his creditors or attempts or attempt to do the Engineer-in- charge
may, by notice in writing rescind the contract. Also if any bribe, gratuity gift, load, perquisite,
reward or advantage, pecuniary or otherwise, shall either directly or indirectly be given,
promised, or offered by the Contractor, or any of his servants or agents to any public officer
or person in the employment of the Municipal Corporation in any way relating to his office
or employment, or if any such officer or person shall become in any way directly or indirectly
interested in the contract the Engineer-in-charge may by notice in writing rescind the
contract. In the event of contract being rescinded, the security deposit of the Contractor
shall thereupon stand forfeited and be absolutely at the deposit of the Municipal
Corporation and the same consequences shall ensue as if the contract had been
rescinded under clause3 hereof and in addition the Contractor shall not be entitled to
recover or be paid for any work thereto for, actually performed under the contract.
All sums payable by a Contractor by way of compensation under any of these conditions
shall be considered as reasonable compensation to be applied to the use of the Municipal
Corporation without reference to the actual loss or damage sustained and whether any
damage has or has not been sustained.
In the case of a tender by partners any change in the constitution of a firm shall be forthwith
notified by the Contractor to the Engineer-in-charge for his information.
All works to be executed under the contract shall be executed under the directions and
subject to the approval in all respects of the Solid Waste Manager (SWM Department) who
shall be entitled to direct at what point or points and in what manner they are to be
commenced, and from time to time carried on.
Except where otherwise specified in the contract the decision of the Commissioner shall
be final, conclusive and binding on all parties to the contract upon all questions relating
to the meaning of the specifications, drawings, designs and instructions hereinbefore
mentioned and as to the quality of workmanship, or materials used on the work, or as to
any other question, claim, right, matter, or thing whatsoever in any way arising of, or relating
to the contract, designs, drawings, specifications, estimates, instructions, orders or these
conditions, or otherwise concerning the works or the execution or failure to execute the
same, whether arising, during the progress of the work or after the completion or
abandonment thereof.
When the estimate on which a tender is made includes lump sums in respect of parts of
the work the Contractor shall be entitled to payment in respect of the items of work involved
or the part of the work in question at the same rates as are payable under this contract or
such items or if the part of the work in question is not in the opinion of the Engineer-in-
charge capable of measurement the Engineer-in-charge may at his discretion pay the
lump sum amount entered in the estimate, and the certificate in writing of the
Engineer-in-charge shall be final and conclusive under the provisions of the clause.
In the case of any class of work for which there are no such specifications as are mentioned
in Rule 1 such work shall be carried out in accordance with the Municipal or Gujarat
P.W.D. specifications, and in the event of there being no Municipal or Government P.W.D.
specifications, then in such a case the work shall be carried out in all respects in
accordance with the instructions and requirements of the Engineer-in-charge.
The expression "works" or "work' where used in these conditions shall, unless there be
something in the subject or context repugnant to such construction be construed to mean
the work or works the contracted to be executed under or in virtue of the contract, whether
temporary or permanent, and whether original, altered, substituted or additional.
All quarry fees and royalties shall be paid by the Contractor. All octroi, taxes shall also
be paid by the Contractor according to the Municipal rules in force at the time and no refund
shall be given. Nothing shall be paid by VMC.
The Contractor shall be responsible for and shall pay any compensation to his workmen
payable under the Workmen's Compensation Act 1923 [VIII of 1923] or any statutory
modification thereof for injuries caused to workmen. The Workmen Compensation policy
and all the insurances pertaining to Plant and Equipment, fire, burglary shall be in the
Contractors scope. However, the events such as earthquake and flood shall be considered
as a Force Majeure and relevant clauses of the tender shall apply for the same. Contractor
shall be responsible to all statutory compliances under PF, ESIC Act and other labour
and wages laws applicable from time to time.
Quantities shown in the tender are approximate and no claim shall be entertained for
unverified quantities of work executed being either more or less than those entered in the
tender of estimate.
No compensation shall be allowed for any delay caused in the starting of the work on
account of any acquisition of land in the case of clearance work, for any delay in accordance
No compensation shall be allowed for any delay in execution of the work on account of
water standing in borrow pits or compartments. The rates are inclusive for hard or cracked
soil, excavation in mud, sub-soil water or water standing in borrow pits, and no claim for
an extra rate shall be entertained, unless otherwise expressly specified.
The Contractor shall not enter upon or commence any portion of work except with the
written authority and instructions of the Engineer-in-charge or of his subordinate in charge of
the work failing such authority the Contractor shall have no claim to ask for measurements
of or payment for work.
No Contractor shall employ any person who is under the age of 18 years. If any contractor
found employing person or persons under the age of 18 years, during course of the
construction at any stage, legal actions shall be taken against him as stipulated in Child
Labour (Prohibition & Regulation) Act 1986 and also, a penalty of Rs.20,000/- (Rupees
Twenty thousand) shall be imposed which shall be deposited with District Collector in Child
Labour Rehabilitation cum Welfare Fund.
No Contractor shall employ donkeys or other animals with breeching of string or thin
rope. The breeching must be at least three inches wide and should be of tape [Nawar].
No animals suffering from sores, lameness or emaciation or which is immature shall be
employed on the work. The Engineer-in-charge or his agent is authorized to remove
from work any person or animal found working which does not satisfy these conditions
and no responsibility shall be accepted by the Municipal Corporation for any delay caused in
the completion of the work by such removal.
The Contractor shall pay fair and reasonable wages to the workmen employed by him in the
contract undertaken by him in the event of any dispute arising between the Contractor and
his workmen on the grounds that the wages paid are not fair and reasonable, the dispute
shall be referred without delay to the Solid Waste Manager (SWM Department) who shall
decide the same. The decision of the Solid Waste Manager (SWM Department) shall be
conclusive and binding on the Contractor but such decisions shall not in any way affect the
condition in the contract regarding the payment to be made by the Municipal Corporation at
the sanctioned tender rates.
Payment to the Contractors shall be made by cheque drawn on any bank in Vadodara,
provided the amount exceeds Rs. 10. Amounts not exceeding Rs. 10 will be paid in cash.
Any Contractor who does not accept these conditions shall not be allowed to tender for
The work contract tax shall not be paid to the contractor.
Disputes if any, shall be discussed and mutually settled and in case of disagreement the
same shall be referred to Commissioner. After referring to Commissioner if the said dispute
is not solved, the same shall be referred to the court subject to Vadodara Jurisdiction only.
The following condition are being included in this tender and shall be considered as a part
of tender document.
In case the total amount of work done is 5% less than the contract value, prorate S.D. to
In case the total amount of work done is 5% less than the contract value, prorate S.D. to
that extent may be refunded to the contractor while releasing the payment of final bill. In
short, the S.D. to be retained by the Corporation after payment of final bill shall be equal to
2% of the amount of final bill as per the prevailing norms or as per the norms decided from
If there is increase in amount of work more than 5% of the Contract value. The Additional
S.D. shall be recovered from the running bill. When the total of any of work done by the
Contractor up to running bills under consideration is more than 5% of the contract value.
However, such S.D. shall be recovered in the round figure.
In many cases, the contractors are stopping the work half-way due to number of reason and
when the department has to take actions in accordance to clause 3(a) or (b) or (c) of the
contract the remaining work has to be carried out by advertising the tender for the
remaining work and the whole administrative process right from inviting tenders to
finalizing the tender etc.
In such cases a fixed amount of Rs. 1000/- should be recovered from the original contract
towards the cost of advertisement and other administrative charges incurred by the
department in finalizing the contract for the remaining work.
In case a separate advertisement is issued for a single work actual cost of advertisement
shall be recovered such recovery shall be in addition to the recovery to be made under
clause-3 or such other relevant clauses.
The tender is sent to you with one set of conditions of contract, technical specification and
one set of Price Bid, please return the same duly filled in along with all the set in a sealed
cover. The mode of submission of tender shall be as indicated in tender notice. The Tender
submission shall be by Registered Post A.D./Speed post/online and need to signed every
pages of tender and submit.
A sum of EMD Amount of Rs.3,12,00,000/- amount shall be in form of crossed Demand Draft
/ Pay Order / Bank Guarantee from any Nationalized Bank payable at Vadodara as
mentioned in Gujarat Govt. Finance Department, GR. No.: EMD/4/2022/0002/DMO Date:
The contractor will quote item rate, both in words and figures. The final total as per the
item-rates quoted above shall also be given both in words and figures.
No alteration in the form of quotation and in schedule of quantities and no additions in the
shape of special stipulation will be permitted. Quotation which do not fulfill all or any of the
above conditions or are incomplete in any respect are liable to be rejected.
The tenderer must obtain for himself on his own responsibility and at his own
expense all the information which may be necessary for the purpose of filling this
tender and for entering into a contract for the execution of the same from the office of the
Solid Waste Manager (SWM Department), Vadodara Municipal Corporation, VADODARA,
during the office hours between 11:00 A.M. to 6:00 P.M. on weekdays except
Sunday & Holidays and must examine the primary/tentative drawings and inspect site
of the work and acquaint himself with all local conditions and matters pertaining thereto
before submitting the tender.
Each of the pages (having reference for signature of the contractor) of the tender
documents is required to be signed by the person or persons submitting the tender in token
of his/their having acquainted himself/themselves with General Conditions etc., as laid
down. Any tender with any of the documents not so signed which will be rejected.
The rates quoted by the contractor shall include all eventualities such as heavy rain, sudden
floods, all kind of natural / manmade disaster, lockdown etc. which may cause damage to
the executed work or which may totally wash out the work. Until the completion certificate is
to the contractors, VMC shall not be responsible for such damage or wash out to the
construction work.
Time is the essence of the contract. The Contractor has to complete the construction and
Commissioning of the Plant in Phase wise manner.
The work should be completed within Twelve months from the 15th day of the allotment of land and
finalization of design/lay-out/detailed drawing by authority. If the delay exceeds 90 days, VMC may
initiate termination of contract along with forfeiture of Security Deposit. The successful contractor
will have to give a schedule of the various items of work to be done so that the work is
completed within the stipulated time.
Rate for extra items, as far as possible will be derived from the quoted tender items where it
is not possible to do so, the same shall be carried out in following sequence.
(i) From VADODARA R&B S.O.R.2021-22.
(ii) If rates are not available, as described under (i), then from GWSSB SOR 2020-21.
(iii) If rates are not available in either of (i) or (ii), then it shall be arrived at by adding 15%
towards overhead and profits on the actual cost of labour, material and plant and machinery
input as approved by the Engineer-in-charge.
In case of delay in execution of work the penalty at the rate of 0.065% of contract Security
Deposit per day subject to the maximum of 10% of the Security Deposit value, shall be
payable by the contractor to the Corporation towards compensation.
No claim for any extra or compensation for damage will be entertained on account of such
variation, except where the quantity is increased by more than 30%. No claim for any extra
or compensation for damages will be entertained on account of such variation where the
quantity is decreased to any percentage or where the item is totally deleted.
It should be noted that the contractor shall have to complete the work in stipulated time of
(Twelve) months (excluding monsoon) as per the terms of the contract. The Contractor shall
submit complete CPM/ PERT/ GANTT chart and get it approved within 30 days of the award of
The Contractor shall also arrange to obtain the license from the competent Authority under
the contract labour (regulation and abolition) Act 1970 and also pay minimum wages
decided by government under said act and comply with other provisions of said act.
Before payment of final bill on completion of the work, total amount of that work done at
Before payment of final bill on completion of the work, total amount of that work done at
sanctioned rate shall be considered with the total amount of work done, had it been
sanctioned rate shall be considered with the total amount of work done, had it been
executed at the rate of second tenderer. While comparing total amount, quantity to be taken
executed at the rate of second tenderer. While comparing total amount, quantity to be taken
into consideration will be the quantity executed and not the quantity put to tender and will
also include variation of quantity within the limits of quantity executed i.e. 30% of the
estimated quantity. In case the latter is less than the total amount of work done at
estimated quantity. In case the latter is less than the total amount of work done at
sanctioned rate; than the amount of difference the two shall be deducted from the final
bill before making payment. In other words, the work when executed shall not exceed as
compared to the rate of second lowest tenderer. It may be noted that extra items shall not
be included in comparing the rates with the second lowest tenderer.
The following additional information shall be forwarded by the tenderer along with the
submission of the tender:
a. A list of works of comparable nature executed, along with their value and time of
b. A list of works in hand showing the cost of the work to be completed against each with
the certificate from the Head of the office concerned.
c. A list of machinery in their possession and which they will bring for the proposed work.
d. Solvency certificate without which such tenders are liable to be rejected. The Solvency
certificate should be for the amount as mentioned in financial criteria.
e. Every contractor shall furnish along with the tender, information regarding income- tax
the circle of the district in which he is assessed for income-tax the reference No. and year
Acceptance of tenders will rest with the competent authority who does not bind himself to
accept the lowest and reserves the right to reject any or all quotations/tenders and no
reasons will be given for acceptance or rejection thereof. The tenderers whose quotation is
accepted will have to enter into a regular contract and abide by all rules and regulations
embodied in the tender.
The tender will be liable to be rejected outright, if while submitting it ---
i. The tenderer proposes any alteration in the work specified in the tender or in the time limit
allowed for carrying out the work or any other condition.
ii. Any of the pages of the tender are removed or replaced.
iii. The Contractor shall fill price bid online only.
iv. Any errors are made by him in the tender.
v. All corrections and additions or pasted slips are not initiated by tenderers.
vi. The tenderer or in the case of a firm each partner thereof does not sign or the
signature/signatures is/are not attested by a witness on page of the tender in the space
provided for the purpose.
vii. The tenderers which do not fulfill any of the conditions of those in the printed form and those
tenders which are incomplete.
The contractor has to make all arrangements for procuring the materials required on his
In case of any discrepancy with tender document the contractor may contact the Solid
Waste Manager (SWM Department), Vadodara Municipal Corporation, Vadodara.
In view of the difficult position regarding the availability of foreign exchange, no foreign
exchange would be released by the VMC for the purchase of plant and machinery
required for the execution of the work contracted
The contractor will have to construct shed for storing valuable materials at works site having
locking arrangement. The material will be taken for use in the presence of the VMC person.
No materials will be allowed to be removed from the site of works. Security Arrangement for
the same has to be made by contractor at his own cost.
Tender once accepted shall be binding on the contractor even if the formal agreement is not
Tender once offered cannot be withdrawn except with the express permission of the
Municipal Corporation.
The successful tenderer may be required to furnish surety of 10% of the contract value on
stamp paper if so desired by the Commissioner.
For all R.C.C. works such as Footings, Columns, Beams, Slabs, Chhajjas, Purlins, Lintels,
etc., a 15 cm x 15 cm x 15cm sizes test cube as per the P.W.D. Standard will have to be
taken by the contractor and as per instructions and directions of the Engineer-in-charge.
These test cubes will be for 7 days and 28 days respectively. After 7 days, 28 days these
test cubes will be tested in the Government approved laboratory by the contractor at his own
expense and results will be submitted directly to the respective head of the VMC.
This tender document (Technical Bid), which should be furnished along with earnest money
deposit, duly filled in and signed. No pages can be removed from the conditions of contract,
specifications of drawings, otherwise it will be considered as an intentional fault and the
tender will be liable for rejection and the amount of earnest money deposit forfeited.
If the work executed is found to be of inferior quality OR of any substandard quality not
conforming to the specifications at any point of time during the inspection of by Engineer-in-
charge or any Higher Authority, the contract shall be terminated without assigning any
reasons there off and no payment shall be made towards the probable damages or loss
caused to the contractor and materials purchased by him for this work and no compensation
whatsoever either shall be paid to contract by Municipal Corporation.
The Successful contractor shall take “all contract risk insurance policy” for the tendered cost
of the work. "Workman compensation policy” for all workers and labour of contractor and
clients working at site and "Third party insurance policy" to fully cover all third-party type risk
for the whole contract i.e. Municipal Solid Waste processing of average daily minimum
MT for 10 (Ten) years.
Out of the amount payable/creditable to contractor's account, the Central Government /
State Government tax/taxes shall be deducted at source in accordance with the relevant
laws/rules from time to time prevailing.
Now no octroi is to be paid as the same is exempted and therefore the question of
reimbursement does not arise. The contractors shall quote their rates considering this
aspect of exemption of octroi.
Vadodara Municipal Corporation shall not provide „C‟ or 'D' Form for tax purposes.
Unless stated in the Price Bid, Price variation or escalation shall not be paid to the
Special Clause regarding EPF act 1952 and payroll and muster roll.
All the applicant contractors are required to have their own employer code number under
EPF Act, 1952 and are required to comply the applicable provisions of said statute regularly
and totally. Further the contractors for services are required to produce the certified
copies of paid challans in respect of employees/workers employed by said contractor in
respect of work allotted by Vadodara Municipal Corporation, along with copies of Pay Roll
and Muster Roll. If the same are not produced, the bills will not be release.
Liaison with any Government- Semi Government Body Etc. public / private sector should be
in the scope of Supplier/ Tenderer for related tender material.
The Contractor shall be solely responsible for any loss or damage caused monetary or by
any means otherwise at site to property, machinery or violence caused by labours, agitation
of workers or work stopped due to any kind of hindrance. The contractor may face legal
consequences for such action thereof and shall have to pay all the charges incurred due to
Signature of The Contractor
SPECIAL CONDITIONS OF CONTRACT
Proposed Municipal Solid Waste processing plant is on Design, Build, and Operate basis
for processing on per metric ton basis is asked for the proposed plant. The bidder is
required to go through the details of the technical specification in the Chapter on
“Description of the Project” and shall get waste characterization/study on the waste
generated from Vadodara city done at its own expense.
It should be clearly noted here that the process/design proposed by the bidders should be
related to minimum processing of 500 TPD of Municipal Solid waste on daily basis, with the
object of getting optimum treatment of MSW in line with CPHEEO Manual & SWM Rule
The place of the proposed project is situated at As directed by VMC.
The general scope of work for the proposed Municipal Solid waste processing Plant under
present tender includes Engineering, Procurement, Construction, Erection, Testing and
Commissioning including the cost of all the labour, materials, chemicals, equipment‟s,
instruments, tools required for civil, electrical, mechanical, instrumentation, piping etc. &
all other types of works for the total completion of the project on Design, Build and
Operate basis. The detailed scope of work, specifications etc. are described in this tender
Cost of all types of materials/ equipment‟s/ machineries/ tools/ items including cement,
steel (reinforcement as well as structural) all types of pipes etc. & all types of labor
required for the completion of the project will be in the contractor's scope.
ii. Transfer and hand back of project site:
• After completion of civil + mechanical (capital works), the bidder shall handover / transfer
the site to VMC and security deposit for capital works shall be released.
• VMC shall hand back plant to contractor. VMC shall have to sign separate contract for
Operation and maintenance work with contractor for 10 years.
• The selected bidder shall transfer the plant and machineries in working condition to VMC
at the time of expiry of contract Period. VMC‟s Workshop department shall verify the
condition of machineries. The contract period may be extended another 5 Years with
mutual understanding of both the parties.
• The bidder has to supply the vehicles along with the plant machineries.
• It is the responsibility of the Bidder to run and maintain the Vehicle as per RTO norms.
The bidder has to ensure that new vehicle is to be replaced by him after the validity
completion of RTO for particular vehicle or if it comes to knowledge of VMC that the
vehicles used by the bidder is not in good condition, the bidder is bound to replace the
vehicle till contract period.
• The bidder has to get RTO passing on the name of Vadodara Municipal Corporation for
each vehicle as it is the ownership of VMC.
All the safety and factory rules shall be strictly followed. The contractor is fully responsible
for the safety of his staff and workmen and must equip them with safety appliances
The Contractor shall be responsible for provision of safety arrangements & protective
clothing for all persons/employees on the site whether or not engaged in actual
operation or supervision. The Contractor shall also be responsible for safety
arrangements of all equipment used for construction and shall employ trained workmen
conversant with safety regulation. The contractor shall use only tested equipment and
tools and shall periodically renew tests to the satisfaction of the Engineer. All test
certificates shall be made available to the Engineer at the site of the work. If at any time, in
the opinion of the Engineer, this provision is not complied with, the contractor shall
forthwith replace such equipment and tools.
The contractor shall display notices and arrange proper fencing at such places where
hazardous work is being carried out. The contractor shall provide at his own expense
on the works to the satisfaction of the Engineer at such places, proper and sufficient
firefighting, first aid appliances etc. which shall at all times be available for use.
The entire job/project has to be completed within a period of 12 months including
Engineering, Procurement, approval, execution, testing, trial run and commissioning
[Excluding monsoon] from the 15 day of date of placement of order. The time limit includes
the time required for testing, rectification, if any, retesting and completion in all respect to
the entire satisfaction of the Engineer-in- charge. The timely completion of this project is
very important for the citizen of Vadodara City, and hence Weightage will be given on strict
compliance of work as per the sanctioned schedule of work/bar chart. The testing, trial run
and commissioning shall be for one month. The time period of completion shall be
reckoned from the date of notification of award of work. The bidder shall have to submit a
detailed PERT/BAR/GANT chart network, with the time frame consisting adequate
number of contractual activities covering key phases of the works such as design, drawing,
approval procurement, manufacturing, testing, construction and field erection activities.
iv. Penalty for delay:
The Contractor is bound to do the work as per the sanctioned schedule of work/bar chart.
The contractor shall have to submit the progress report with physical and financial
achievement at every first of calendar month.
If the contractor fails to complete the work within the stipulated completion date for the
work, he shall pay penalty for delay at 0.065% of contract Security Deposit value per day
and max 10%, of the Security Deposit value. If the delay exceed 60 days VMC may
initiate termination of contract along with forfeiture of Security Deposit.
v. Scope of Supply of Material:
a) Supply of Material :
All materials, testing appliances, tools, tackles & spares etc. necessary for the successful
execution & completion and till plant handing over of plant to VMC shall be procured and
provided by the tenderer. No material will be supplied by the VMC, either free of cost or at
issue rate by the Vadodara Municipal Corporation, for this complete work.
Power required for the construction, erection and other allied job shall be arranged by the
contractor at his own cost.
The Contractor shall have to make his own arrangement for getting electric power. The
VMC will issue only recommendation letter to the contractor, if required. No compensation
shall be paid for delay in getting power supply. All the rest formalities for getting the power
supply, connection charges, deposits, monthly energy bills etc. shall be done and borne
by the contractor.
In case of power distribution company (MGVCL) denies providing electrical connection
(power) to contractor, VMC shall secure electric connection in the name of VMC and pay
necessary connection charges, deposits, monthly energy bills. However, the same shall be
deducted from contractor‟s running bill.
c) Water: The Contractor shall have to make his own arrangement for water required
during Construction Period and O&M period.
vi. Construction of Stores and Site Office:
Contractor has to build his own office space on his all responsibilities. Suitable areas will
be allocated or may not be allocated by the VMC to the Contractor to build storages for
storing his equipment, plant, materials etc. and also to build his site offices. He will be
solely responsible for watching and guarding of his stores, offices etc.
The contractor shall cover all his equipment and materials at site with requisite insurance
against theft, larceny, dacoit, fire tempest, flood, earthquake etc.
On completion of the works undertaken by the contractor, he shall remove all temporary
works erected by him and have the site cleaned as directed by the Engineer. The VMC
reserves the right to ask the contractor any time during the pendency of the Contract to
vacate the land by giving 7 days‟ notice on security reasons or on national interest or
vii. Labour and Supervisory Camps:
Land will be or not provided by the VMC to the Contractor for constructing his labour and
supervisory camps and other service facility. It will be all contractor‟s responsibility.
Contractor shall make his own arrangements outside the plant boundary.
Land for labour camps, storage yards temporary site sheds etc., will be arranged by the
contractor at his own cost. Land for batching plant, casting yard shall be arranged by the
contractor at his own cost. VMC may render all possible assistance to the contractor to
enable him to obtain such lands as may be required for purposes of completion of this
work but no guarantee can be given. Non-availability of Land for labour camps, storage
yards, temporary site sheds etc. will not be considered as a reason for delay in progress.
On written request from contractor, the VMC may allocate any land belonging to VMC and
which is presently not required for concerned department and in that case, token rent at Rs.
10/Sq.mt per month + GST will be recovered from the contractor. The contractor shall
haveto return/ evacuate such land/ plot in original condition as and when needed by VMC
withina week from intimation given by VMC. Further contractor shall have to return/
evacuate/ handover such land/ plot within 15 days after completion of the physical project
on site or inauguration of the project. If the said land is not returned by the contractor within
15 days after the completion of the project as above then rent at the rate of
Rs.15/sq.mts. per month + GST instead of Rs.10/sq.mts. per month +GST shall be
charged/ levied. The contractor shall have to pay all the taxes levied by government/ VMC.
No extra payment shall be made for same.
viii. Construction Equipment:
The Contractor shall make his own arrangement to procure all constructional plant and
equipment for his own. He shall also state the type and number of different equipment with
their capacities in good working conditions which he will use on the site to ensure
completion of the work in the specified time.
All materials, construction plants and equipment once brought by the contractor to the site
are not to be removed from there without the written permission of the Engineer- in-charge.
Also, the Contractor shall have adequate stock of spare parts for the equipment on the site
and work shall not be delayed on this account. Similarly, all temporary works built by the
Contractor for the main construction undertaken by him, are not to be dismantled and
removed without the written authority of the Engineer- in-charge.
ix. Signing of The Contract
The successful tenderer shall be required to execute an agreement in the proforma
provided by VMC of the notification of acceptance of tender. In the event of failure on the
part of the successful tenderer to sign the agreement, the acceptance of the tender shall be
considered as cancelled and Earnest Money Deposit amount will be forfeited.
x. Interpretation of Contract Documents
Except if and to the extent otherwise provided by the contract, the provisions of the General
Conditions of Contract and special conditions shall prevail over those of any other
documents forming part of the contract. Several documents forming the contract are to be
taken as mutually explanatory, should there be any discrepancies, inconsistencies, errors
or commissions in the contracts or any of them, the matter may be referred to the Engineer-
in- charge who shall give his decisions and issue to the contractor instructions directing in
what manner the work is to be carried out. The decision of the Engineer-in-charge shall be
final and conclusive and the contractor shall carry out the work in accordance with this
Works shown upon the drawings but not mentioned in the specifications or described in the
specifications without being shown on the drawings shall nevertheless be held to be
included in the same manner as if they had been specifically shown upon the drawings and
described in the specifications.
The various documents forming the contract are the essential parts of the contracts and a
requirement occurring in one is as binding as though occurring in all, they are intended to
be mutually explanatory and complementary and to describe and provide for a complete
In the event of any discrepancies, the various documents forming the contract or in any one
document, the following order of precedence should apply
a] Dimensions &quantities ---
ii. Schedule `B' of the tender form.
On drawings, figures, dimensions, unless obviously incorrect will be followed in preference
to shown dimensions
b] Description ---
i. Schedule `B' of the tender form
iii. Specifications
In case of defective description or ambiguity, the Engineer-in-charge should issue further
instructions/ directions in what manner the work is to be carried out, it being
understood that the best modern practice is to be followed. The contractor should forthwith
comply with such instructions
The contractor should take no advantage of any apparent error or commission in drawings
or specifications and the Engineer-in-charge shall make such corrections and
interpretations as necessary to fulfill the intent of the plans and specifications.
xi. Force Majeure
Any delays in or failure of the performance of either part hereto shall not constitute default
hereunder or give rise to claims for damages, if any, to the extent such delays or failure of
performance is caused by occurrences such as Acts of God or the public enemy;
expropriation or confiscation of facilities by Government authorities, compliance with any
order or request of any Governmental authorities, acts of war, rebelling or sabotage or
fires, floods, explosions, riots or illegal strikes. The contractor shall keep records of the
circumstances referred to above and bring these to the notice of the Engineer-in-charge in
writing immediately on such occurrences.
xii. No Compensation for Alteration in Or Restriction of Work
If at any time after the commencement of the work, the Vadodara Municipal
Corporation shall for any reason whatsoever not require the whole or part thereof as
specified in the tender to be carried out, the Engineer-in-charge shall give notice in writing
of the fact to the contractor, who shall have no claim to any payment or
compensation whatsoever on account of any profit or advantage which he might have
derived from the execution of the work in full, but which he did not derive in consequence of
the full amount of the work not having been by reason of any alterations having been made
in the original specifications, drawings, designs and instruction which shall not involve any
curtailment of the works as originally contemplated.
xiii. Right of The Vadodara Municipal Corporation to Determine/Terminate Contract
i. The Vadodara Municipal Corporation shall, at any time, be entitled to determine and
terminate the contract, if in the opinion of the Vadodara Municipal Corporation the cessation
of the work becomes necessary owing to paucity of funds or for any other cause
whatsoever, in which case the cost of approved materials at the site as verified and
approved by the Engineer-in-charge and of the value of the work done to date by the
contractor shall be paid for in full at the rate specified in the contract. A notice in writing
from the Vadodara Municipal Corporation to the Contractor of such determination and the
reason, thereof shall be the conclusive proof of the fact that the contract has been so
determined and terminated by the Vadodara Municipal Corporation.
ii. Should the contract be determined under sub-clause (i) of this clause and the contractor
claims payments to compensate expenditure incurred by him in the expectation of
completing the whole of the work, the Vadodara Municipal Corporation shall consider and
admit such claims as are deemed fair and reasonable and are supported by vouchers to
the satisfaction of the Engineer-in- charge. The decision of the Municipal Commissioner,
Vadodara Municipal Corporation on the necessity and propriety of any such expenditure
shall be final and conclusive and binding on the contractor.
xiv. Co-operation with other Contractors:
The contractor shall execute his work in phased manner as directed by the Engineer from
time to time so as not to obstruct or retard the work being executed simultaneously by
other agencies.
xv. Coverage of Contract:
The Contract for the work is a complete one for labour, material and workmanship with
contractor's overhead and profit including all temporary works and the provision and use of
all construction equipment, tools, tackles, etc. The contractor shall make his own
arrangements for all the materials and equipment required for the due performance of the
Except where it is explicitly provided that the cost will be borne by VMC, the various
obligations of the contractor under contract shall be at the cost of the contractor.
The tipping fee quoted by the contractor for the proposed Municipal Solid waste processing
plant shall be deemed exclusive of GST imposed by Local body and/or State/ Central
Government during the project period for the all the goods, items, raw materials, finished
goods, machineries, equipment, valves, pipes, instruments, cables or any other materials to
be used for the proposed work.
All the expenses pertaining to the operation & maintenance of proposed Municipal Solid
waste processing plant as described in detail in Chapter on Operation and Maintenance in
this tender, as per the given specifications & required quantity and cost of all the
major/minor spares and chemicals required for any type of repairing or replacement during
the period of three years shall be borne by the contractor.
xvi. Collection of Data Tenderers' Responsibility
The tenderer shall visit the site and acquaint himself fully of the site and no claims
whatsoever will be entertained on the plea of ignorance or difficulties involved in execution
of work or carriage of materials.
xvii. Setting Out Works
The Engineer-in-charge shall furnish the contractor with only the four corners of the work
site and a level bench mark and the contractor shall set out the works and shall provide an
efficient staff for the purpose and shall be solely responsible for the accuracy of such
xviii. Responsibility for Level & Alignment
The contractor shall be entirely and exclusively responsible for the horizontal and vertical
alignment, the level and correctness of every part of the work and shall rectify any
errors or imperfections therein. Such rectifications shall be carried out by the contractor at
his own cost, when instructions are issued to that effect by the Engineer-in- charge.
xix. Discrepancies Between Instructions
Should any discrepancy occur between the various instructions furnished to the contractor,
his agents or staff, or any doubt arises as to the meaning of any such instruction or, should
there be an misunderstanding between the contractor's staff and the Engineer-in-charge's
staff, the Contractor shall immediately report the matter in writing to the Engineer- in-
charge whose decision thereon shall be final and conclusive and no claim for losses
alleged to have been caused by such discrepancies between instructions, doubts or
misunderstanding shall in any event be admissible.
xx. Testing and Commissioning:
a) The tenderer shall carry out testing, commission and trial run of the plant for one month
period. Any defects found in design. workmanship or in any of the equipment supplied by
the tenderer shall be rectified by the tenderer at his own cost within a reasonable time to
be decided by the Engineer-in-charge. Beyond this period suitable penalty shall be levied
and the plant shall be tested again for faultless running of three months to the entire
satisfaction of the Engineer-in-charge. All the skilled/ unskilled labour, oil, grease, spares
and all other consumable items and other arrangement shall have to arranged by the
Contractor at his cost during the testing, commissioning and till handing over the system to
b) During the period of testing and commissioning the tenderer shall make available at site
experienced personnel for operating the treatment facility. Two copies of operation manual
detailing the function of all the civil, mechanical, electrical, units and instruments,
operation, routine maintenance, and preventative maintenance shall be supplied before trial
run of the proposed Municipal Solid Waste Treatment plant.
xxi. Royalties:
Royalties for the construction materials i.e. Sand, Stone, aggregates, Rubble, murdrum,
gravel as specified from time to time by the State Government shall be paid by the
contractor. All ruling regulations have to be strictly adhered to.
xxii. Instruction Manual for Operation & Maintenance:
After the total completion and before the commissioning of the plant, the contractor shall
submit the 02 (two) copies of the operation & maintenance manual for the proposed
Municipal Solid Waste Treatment plant.
The contractor shall submit in duplicate (soft copy and hard copy each in duplicate)
operational and maintenance manual for all the process units including for equipment
and instruments. The manual shall include details such as objectives, pre- commissioning
instructions as well as detailed operational aspects and instructions on startup, normal
operation and shut down procedure for treatment plant units including analytical methods to
be adopted at various stages of monitoring treatment plant to achieve desired results. The
detailed characteristics of various supplied equipment shall be part of manual. The
necessary detailed drawings such as plant layout, mass flow diagram and P & I diagram
shall be also enclosed.
xxiii. All the reinforcement steel to be used for the RCC work for the proposed Municipal
Solid waste Processing plant at all levels, shall be CRS type of Fe 500 Grade confirming to
IS:1786 and from the specified vendors/manufacturers only. Test certificates indicating
steel confirming to required IS, must accompany before delivery of each & every lot
of reinforcement steel to be supplied & used for the proposed work. After delivery of such
reinforcement steel at site, testing of steel shall be carried out as per the relevant IS codes,
as per the sampling procedure given in the same.
xxiv. All the cement to be used for the proposed work for any civil engineering activity
like- PCC, RCC, inside & outside plastering, IPS & flooring etc., shall be Ordinary Portland
Cement, confirming to IS:12269/87(Latest Edition) and of the specified
vendors/manufacturers only.
xxv. All the concreting work for the proposed Municipal Solid waste processing plant
shall be carried out by automatic digital type weigh-batching plant & concrete mixer
installed at the site for the proposed work, as per the specifications given in this tender.
Volumetric batching of concrete ingredients shall not be allowed in any case.
xxvi. The Contractor shall have to get approval from factory inspector as per factory act
and should submit the certificate of approval to VMC The required drawings to be submitted
to factory inspector shall be supplied by the Contractor and approved drawings shall be
handed over to VMC All necessary drawings/liaisons work etc. will be done by the contractor.
VMC will assist only in submission of the application forms.
xxvii. The contractor shall be required to give test report and submit the same to Electrical
Inspector for complete Electrical works done by the Contractor. The approved drawing / test
reports shall be handed over to VMC
xxviii. Insurance / responsibility of all the materials / equipment‟s / plants shall be the
Contractor‟s responsibility till handing over the plant to VMC, even if part payment is
xxix. Guidelines to be followed at work site:
i. All the items occurring in the work and as found necessary during actual execution shall
be carried out in the best engineering manner/practice as per specifications and as
directed by the Engineer-in-charge.
ii. The Contractor shall engage qualified Engineer for the execution of work who will remain
present for all the times on site and will receive instructions and orders from the Engineer-
in-charge or his authorized representatives. The instructions and orders given to the
contractor‟s representative on site shall be considered as if given to the contract or himself.
iii. A work order book as prescribed shall be maintained on the site of the work by the
contractor and the contractor shall sign the orders given by the inspecting officers and shall
carry them out promptly.
iv. Figured dimensions of drawings shall supersede measurements by scale. Special
dimensions or directions in the specifications shall supersede all other dimensions.
v. All levels on drawings are for general guidance and the contractor shall be responsible
to take regularly levels at the site before actually starting the work. The level shall be
connected to the G.T.S. levels and shall be got approved from the Engineer-in-charge.
vi. If the arrangement for any temporary work is required to be made during any work of this
contract, this shall be made by the contractor without claiming any extra cost.
vii. As the proposed work is to be carried out within city limit, the cleanliness should be
preserved in & surrounding the workspace.
xxx. Following must be specifically noted;
[a] No advance payment terms are accepted.
[b] No `D' or `C' Form or Octroi exemption certificate will be furnished by the Vadodara
Municipal Corporation.
[c] The plant is located within the VMC Limit.
[d] Rates quoted must be exclusive of GST, as applicable as on date of bidding and no
dispute at later date will be entertained. However, if any new taxes levied by government
during the period of contract (Capital and O & M), the same shall be reimbursed on
submission of documentary proof of its payment. GST shall be payable for Capital Works.
For O&M works, GST shall be payable if applicable
However, for getting the benefit of the exemption in the custom duty or any other tax
benefits as per the prevailing policy of the Central Government for the construction of new
Municipal Solid Waste Treatment plant and transferring the same benefit of reduced costs
to Vadodara Municipal Corporation, the bidders should quote their lump-sump price in price
bid after taking in to consideration for benefits of custom duty or any other tax for the
items/equipment suggested as per that policy. Vadodara Municipal Corporation will give a
supporting letter to the contractor to obtain the necessary certificate/letter for exemption of
custom duty etc. for those items / equipment required for the proposed work from the
respective authority after sanctioning & award of work.
[a] Applicable TDS as per prevailing Rules, will be deducted from all the payments made to
the contractor.
[b] Construction period will remain 12 (Twelve) months including testing, trial run and
commissioning [Including monsoon] as mentioned in the tender.
[c] EMD & SD shall be furnished as per tender terms and conditions only.
[d] It is to note that, it is the responsibility of contractor to watch and ward and make keep
security arrangement during capital as well as entire O & M period.
xxxi. All the applicable taxes as per the Government Rules and Regulations shall have to
borne by the Contractor only, no compensation shall be paid on this account.
xxxii. Interest of any kind what so ever shall never be paid/entertained in any case
including delayed payment of Running bills or final bill or any such or all dues with
Vadodara Municipal Corporation.
xxxiii. The Vadodara Municipal Corporation May Do Part of The Work
Upon failure of the Contractor to comply with any instructions given in accordance with the
provisions of this contract, the Vadodara Municipal Corporation has the alternative right,
instead of assuming charge of entire work, to place additional labour force, tools,
equipment and materials on such parts of the works, as the Vadodara Municipal
Corporation may designate or also engage another Contractor to carry out the work. In
such cases, the Vadodara Municipal Corporation shall deduct from the amount which
otherwise becomes due to the Contractor, the cost of such work and materials with 10%
added to overall departmental charges and should the total amount thereof exceed the
added to overall departmental charges and should the total amount thereof exceed the
amount due to the Contractor, the Contractor shall pay the difference to the Vadodara
Municipal Corporation.
xxxiv. Contractor to note that VMC may appoint Project Management Agency /Third Party
Agency for the supervision / inspection of the work and contractors are obliged to work
under them. However, decision of VMC shall be final.
xxxv. VMC has conceived this project duly considering the benefits that can be availed
through CDM (Clean Development Mechanism). The contractor shall have to provide all
necessary technical support in this regard and shall not be paid any extra cost towards the
technical support to avail CDM benefits.
xxxvi. Unless otherwise specified anywhere in the tender, no arbitration regarding any or
all the issues in this tender shall be allowed whatsoever.
xxxvii. All the matter pertaining to this tender shall be subjected to Vadodara Jurisdiction
Signature of The Contractor
(SECTION-V) PROJECT DESCRIPTION, SCOPE OF WORK AND
PROPOSED IMPLEMENTATION METHODOLOGY
DESCRIPTION OF THE PROJECT:
NAME OF WORK: DESIGN, BUILD, ERECTION, COMMISSIONING, OPERATION AND
MAINTENANCE OF 500 TPD CAPACITY MUNICIPAL SOLID WASTE TO COMPOST
PLANT AT - VADODARA FOR A PERIOD OF 10 YEARS
1. Brief Description of Task:
Vadodara Municipal Corporation wishes to engage private operators for processing of
Municipal Solid Waste (wet waste & dry waste) and disposal of end products as per Solid
Waste Management Rules 2016 and best Engineering practices within Municipality/
Municipal Corporation limits. It will be constructed & developed subsequently after allotment
of suitable land by Vadodara Municipal Corporation. The income derived from sale of
compost/bio gas, RDF, recyclable material etc. shall belong to agency. The agency will be
responsible for providing services under the scope of work.
Solid Waste Management is one of the most essential services for maintaining the quality
of life in the urban areas and for ensuring better standards of health and sanitation.
Vadodara Municipal Corporation have overall responsibility for Solid Waste Management
(SWM) in VADODARA City. Improper disposal of waste in uncontrolled dumpsites or
burning of waste can aggravates environment though impacts on water and air and can
result in serious health problems and environmental degradation. Due to merger of nearby
villages in VADODARA city and likely increased in generation of Solid waste due to rapid
urbanization and increase in population, Vadodara Municipal Corporation intends to initiate
action to ensure environmentally sound and sustainable ways of dealing with waste
generation, treatment and disposal.
Municipal Solid waste processing plant shall be installed for treatment & disposal MSW
generated from the VADODARA city as per the latest guidelines of Central Pollution
Control Board (CPCB), Gujarat Pollution Control Board (GPCB), SWM Rules
CPHEEO Manual, NGT Order and Guidelines and other applicable Norms, Act, Rules etc.
This Tender document is for Setting up Plant for Municipal Solid waste processing at
Jambuva Dump Site / As directed by VMC, VADODARA along with Operation and
Maintenance for the Period of 10 YEARS on Design, Built, Operate and Transfer Basis.
A “Single Stage” bidding process has been planned for determining the Successful Bidder.
The Bidders would be required to meet the minimum threshold Technical Qualification
Conditions and qualify for undertaking the Project as set out in this Tender document. This
qualification assessment would be carried out as part of the current bidding and evaluation
process. The Financial Proposals of only those Bidders that possess the minimum
Technical Qualification Conditions as laid down in this Tender and other relevant
documents (as per the formats and Annexure mentioned in Volume – I: Technical Bid)
would be opened and evaluated.
Proposals from bidders will be evaluated on the basis of the criteria set out in this Tender
document in order to identify the successful bidder for the Project (hereinafter referred to as
“Successful Bidder”). The Successful Bidder would then have to enter into a Concession
Agreement with the Vadodara Municipal Corporation and perform the obligations as
stipulated therein, in respect of the Project.
The overall objective of this project is to create an efficient and effective Solid
Waste Management system in Vadodara Municipal Corporation. The sub objectives
are as follows:
1. To comply with Solid Waste Management Rules, 2016 and applicable laws,
rules, guidelines in India and best Engineering practices through Public Private
2. To improve the existing standards of public health and environmental quality by
establishing technically suitable MSW processing plant for conversion of MSW to
useful products- Compost
/Bio gas/ Energy / RDF Incl. Recycling of recoverable material and safe disposal
of residue inert waste as generated during waste processing at the ear marked
position to be shown.
3. Improve productivity of manpower, materials and equipment and promote
economic operations of services.
4. Promote and protect the quality and sustainability of overall urban environment
in the service area.
5. Set up Municipal Solid Waste to compost facility.
Location of the Facilities:
The location of the Site, wherein the proposed Municipal Solid waste processing plant
shall be setup is, at Jambuva Dump Site / As directed by VMC.
The land area, which shall be given to the Successful Bidder for the setup of Municipal
Solid waste processing plant, shall be individually termed as “Facility”.
Vadodara Municipal Corporation proposes to select a Successful Bidder for taking up the
development of the aforesaid Project in the form of a Concession.
The Contract Period for the Project shall be for a period of 10 (Ten) years.
This Contract Period is to be considered from the date on the satisfaction of the
Conditions Precedent i.e. Compliance Date (i.e. from the date of commencement of
Site Particulars
The intending tenderer shall be deemed to have visited the site and familiarized themselves
thoroughly with the site conditions before submitting the tender. Non- familiarity with the site
conditions will not be considered a reason either for extra claims or for not carrying out the
work in strict conformity with the specifications of the Tender.
For site visit, the intending tenderer may contact Executive Engineer SWM Vadodara
Municipal Corporation.
Maximum 15 acres (approx.60702 SQ M) of the land shall be provided at Jambuva Dump
Site / As directed by VMC within Vadodara City limits for setting up the plant and
machineries. Details of Land required for setting up Municipal Solid waste processing plant
with the proposed technology has to be provided by the Bidder in their technical proposal.
Site Development and Facilities:
Design & Infrastructure Proposed - Compost Plant & RDF Plant
A. Inspection Area
The municipal Solid Waste will be received at the entry gate to the Site and shall be
weighed at site before taking up for processing. An area for inspection will be
constructed with the following specifications for the inspection of the incoming
loads suspected of containing Mixed waste.
Parameter Specifications
Open platform constructed using non-suspended reinforced
Platform cement concrete slabs
Minimum area: 1 acre
Levelling of the ground shall be done with Approved earth
having permeability coefficient (to leachate) and measured
in field not greater than 1.0 X 10-7 cm/sec and
subsequently compacted at 90% modified Proctor Density
Construction 50 mm thick PCC to be provided
150 mm thick RCC flooring on top of the PC
2% slope shall be provided for platform
Lined drains shall be provided for collection of Leachate
and surface run-off
B. Specifications of Windrow Platform
Parameter Specifications
• Open Platform constructed using non-suspended
reinforced cement concrete slabs
Platform • Minimum area: - 3 Acres
• The area of the Windrow shall be adequate for
Processing the quantity of Municipal Solid Waste as set
out in this tender and concession agreement
• Leveling (after filling) of the ground shall be done
with approved earth having permeability coefficient
(to leachate) and measured in field not greater than
1.0 x 10-7 cm/sec and subsequently compacted at
90% modified Proctor Density
• 50 mm thick PCC to be provided
Construction • 150 mm thick RCC flooring on top of the PCC
• Platform slabs shall be laid with adequate
expansion and contraction joints to prevent leachate
percolation to the ground
• 2% slope shall be provided for platform
• Lined drains shall be provided for collection of
leachate and surface run-off.
C. Paver Blocks
The entire plant area (excluding Windrow platform, Presort and Refinement section)
shall have to be laid /provided with Cement concrete interlocking paver block of M -
grade made by block making machine with strong vibratory compaction, of approved size,
design & shape, laid in required color and pattern over and including 50mm thick
compacted bed of coarse sand, filling the joints with line sand etc. all complete as per entire
satisfaction and direction of Engineer in charge.
D. Sheds:- To ensure uninterrupted processing of MSW during Monsoon season,
the entire plant should be enclosed with Industrial Sheds/Roofing.
E. Process Machinery
All tentative machinery and infrastructure required for the compost plant operations
are given below in the following table.
F. Flow Chart Showing Process of Municipal Solid Waste Processing Facility
The flowchart for processing of 500 TPD municipal solid waste for waste to compost is
shown below. The flowchart shown is indicative and for better understanding of tentative
scope of work which is to be executed by bidders.
The bidders may alter or modify the same but the proposal submitted by bidder shall be in
similar lines or above the scope of work mentioned in tender document.
Anything below the scope of work shall not be accepted by Vadodara Municipal
Corporation and shall be rejected outrightly.
Corporation and shall be rejected outrightly.
MIXED MSW RECEIVED AT FACILITY
WEIGH BRIDGE FOR QUANTITY ASSESMENT
WASTE DUMPED AT PITS USING
CRANE FACILITY FED TO
MANUAL SORTING OF LARGE REJECTS
REJECT > 175 SORTING
TROMELL 175 mm MM ADS
TROMELL 75 REJECT > 75 ADS
WASTE TRANSFERRED TO
32 DAYS STAY OF MATERIAL ON WINDROWS INERT
BIO DE-GRADATION WITH WEEKLY TURNING &
SHIFTING TO NEXT PAD
TROMMEL 35 REJECT ADS
TROMMEL 16 REJECT ADS
SCREENED MATERIAL (-16 MM) TO CURING
SECTION. RESIDENCE TIME 14 DAYS
ADDITION OF ADDITIVES FOR IMPROVING
QUALITY OF FINISHED PRODUCT
MAGNETIC SAPE RANToOR
GOOD QUALITY CO M3POST
PACKING & STORAGE
3. Important Note: Number of processing units required in section shall be as
per table. Tentative list of minimum equipment for 500 TPD.
No Description Qty
A. Presorting Section (175 mm Screen & 75 mm Screen) -30 TPH Two Line (Only
Space to be provided for Extension Line)
A.1 Moving bed Conveyor with Hopper
A.2 Feeding Conveyor
A.3 Rotary Trommel with 175 mm sieve with 4 mt screen length
A.4 Reject Conveyor > 175 mm (Provision for manual segregation)
A.5 Process Conveyor < 175
A.6 Rotary Trommel with 75mm sieve with 6 mt screen length
A.7 Reject Conveyor to carry > 75mm
A.8 Air Density Separator (ADS) with proper chutes to avoid spillage
A.9 RDF Process Conveyor for Baling section
A.10 Reject Conveyor for Inert Storage Section
A.11 Process Conveyor to carry < 75mm
A.12 Cross/Extension/Reversible Conveyor to carry <75 mm
A.13 Hydraulic Power Pack Dual (30 Hp + 30 HP)
A.14 Control Panel Board (Presorting & ADS)
A.15 Magnetic Separator
A.16 Electrical Cables & Hydraulic Line
B. Preparatory Section ( 35 mm Screen & 16 mm Screen)- 15 TPH Two Line
B.1 Hopper Suitable Size
B.2 Feeding Conveyor
B.3 Trommel 35 mm Screen with 6 mts screen length
B.4 Reject Conveyor >35 mm
B.5 Air Density Separator (ADS) with proper chutes to avoid spillage
B.6 RDF Process Conveyor for Baling section
B.7 Reject Conveyor for Inert Storage Section
B.8 Process Conveyor < 35mm
B.9 Trommel 16 mm Screen with 4.5 mts screen length
B.10 Reject Conveyor >16 mm mass
B.11 Air Density Separator (ADS) with proper chutes to avoid spillage
B.12 RDF Process Conveyor for Baling section
B.13 Reject Conveyor for Inert Storage Section
B.14 Process Conveyor to carry < 16mm mass to Curing Shed
B.15 Multi port distributor Conveyor
B.17 Hydraulic Power pack 30 Hp + Hydraulic Line
B.18 Control panel Board (ADS ) 20 HP + Electrical Cables
B.19 Magnetic Separator
C - Refinement Section (Final Compost) -Two Line 10 TPH Single line
C.1 Hopper suitable size
C.2 Feeding Conveyor
C.3 Trommel screen with 3 mt screen length
C.4 Reject Conveyor to carry > 6mm (Inert Storage)
C.5 Process Conveyor < 6 mm
C.7 Reject Conveyor for Inert Storage Section
No Description Qty
C.8 Compost Conveyor
C.9 Compost packing Conveyor – Multiport
C.10 Hydraulic Power pack 20 HP + Hydraulic Line
C.11 Mini Power pack for Multiport Conveyor & other storage conveyors
C.12 Control panel (Electrical Panel) with electric cable
D. RDF Section (20 TPH)
D.1 Inclined Conveyor with suitable size Hopper
D.2 Shredder for> 175 mm reject (25 TPD)
D.3 Process Conveyor to Baling Section
D.4 Hopper suitable size
D.5 Process Conveyor
D.4 Bailing Unit
D.6 Control Panel with Electrical Cables etc.
D.7 Dryer (Optional)
Lengths for the conveyor belt and the number of cross conveyors provided in the
specifications are only indicative. The same will change based on plants layout
4. MATERIAL SPECIFICATION USED IN MANUFACTURING :
A. Pre Sorting Section : 30 TPH
1. Moving Bed Conveyor with Hopper :
This is the first equipment of Pre-sorting section. Fresh Receipt of MSW is fed on to hopper
chute of this moving bed conveyor , which carries the fresh MSW in to the feeder
conveyor. This is the robust chain belt type conveyor specially designed to handle
homogeneous materials in MSW.
Technical data for Moving bed Conveyor with Hopper :
Various rolled steel sections As per IS2062 GR 2A , ISMC
125, ISMC 75 etc.
Hopper Chute & Side
Guards, M S Sheet 12 & 14 SWG
Fabrication As Per IS-801
Gear Box Type WGR ;Type: -Worm Shaft, Helical, geared motor.
Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
Motor speed, motor plus hydraulic power into work which is
expressed in the direct relation between flow rate, speed,
pressure and torque.
Specially made Heavy duty ; 3” pitch ;
a. Bushed & Roller Chain
b. Power Transmit - 98% efficiency for all working loads
under lubricated condition
c. parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
1500mm width ; 5000mm length, 3 ply to resist abrasion &
cutting,12mm thick , with top covering 2mm Resistant to
Belt oil , heat & fires, with bottom covering 1.5mm & Chemical
grade 1&2 , Brand : ISI ; Grade –M 24 ; and Belt
tension as per IS
a. Material: - EN8 x 22 mm Thick.
b. Heat treatment after Fabrication & Machining.
c. No. of Teeth :
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed
to weather will be mechanically cleaned to remove all
rust and scale & then 2 coats of anti corrosive Zinc
Chromate Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
make i.e. Asian, Berger etc. the colour will be of the
customer‟s choice.
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std.
Return Line Filter: - Standard Make.
Power & Speed 7.5 HP & 3 +/- 1 rpm
Note Length & Discharge Height may be varied as per site
2. Feeder Conveyor to Trommel (175 mm) – Coarse segregation:
This is the second equipment of Pre-sorting section. The mass received from Moving Bed
Conveyor is uniformly fed in to the first Trommel (175mm Trommel) for segregation of
heavy materials.
This is the robust chain belt type conveyor specially designed to handle homogeneous
materials in MSW
Technical data for Feeder Conveyor to Trommel:
Structure Various rolled steel sections As per IS2062 GR 2A
Hopper Chute M S Sheet 12 & 14 SWG ( Side Guards, Covers etc)
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at
low speed, motor plus hydraulic power into work
which is expressed in the direct
relation between flow rate, speed, pressure and torque.
Chain ( Z Type Chain belt Specially made Heavy duty ; 3” pitch ;
Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working
loads under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 1000mm width ; 15000mm length 3 ply to resist
abrasion & cutting , 12mm thick , with top covering
2mm Resistant to oil , heat & fires, with bottom
covering 1.5mm & Chemical grade 1&2
Brand : ISI ; Grade –M 24 ; and Belt tension as per IS
Sprockets 3 “ Pitch ;
a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces
exposed to weather will be mechanically cleaned to
remove all rust and scale & then 2 coats of anti
corrosive Zinc Chromate Red Oxide each 20 micron
Then 2 coats of Industrial grade Enamel paint of
reputed make i.e.
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std.
Return Line Filter: - Standard Make
Power & Speed Hydraulic & 3 + - rpm
CHAIN LINER (UHMW) Special anti friction synthetic liner to reduce friction,
(Or ) 8 mm thick bright steel EN8 flat as a liner which
has better result & less maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
condition & Height of the Trommel.
Walkway & provision for Manual segregation to be
provided where ever necessary with chutes provision
to drop the manual segregation items.
3. 175mm Trommel Screen ( Rotary Trommel)
This is the Rotary Screen which separates material on the basis of over size (>175mm)
rejects (>175mm size ) materials will be carried to RDF Section Shredder and undersized
materials forwarded to next Trommel of 75mm size.
Technical data for 175mm Trommel Screen:
Structure Various rolled steel sections As per IS2062 GR 2A
Covers M. S Sheet , 10 , 12 & 14 Guage
Drive Friction drive with Solid Rubber, rubber special grade
90, in Both system Electric & Hydraulic.
Hydraulic Motor Hydraulic working on constant displacement and
achieve high torque at low speed, motor plus hydraulic
power into work which is expressed in the direct relation
between flow rate, speed, pressure
Tyres Specially made , Heavy duty , Solid Rubber Tyres
Screen 175 mm size holes in Diagonal
Ring Fabricated heavy duty
Surface Blasting & Pickling
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std.
Length 4 mts screen Length & 0.5 mts length on both end (
5mts in total length)
Diameter 2500mm Dia
Height Around .5 mts
Speed 8 +- 1 rpm
Drum Cleaning Wire Brushes and , bag cutting blades for bag tearing
Fully covered heavy duty dust covers & easily
replaceable screens.
4. Reject Conveyor >175mm for Manual segregation & RDF Section :
To carry >175mm over sized material in to RDF Section , Manual segregation mechanism for
2 manpower along with drop chutes for segregated materials has to be provided. This is
straight inclined Chain belt conveyor.
Technical data for Straight Inclined Conveyor to RDF section (>200mm) :3
Structure Various rolled steel sections As per IS2062 GR 2A
ISMC 125, ISMC 75 etc.
Speed 12 + - rpm
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
speed, motor plus hydraulic power into work which is
expressed in the direct relation between flow rate,
speed, pressure and torque.
Chain ( Inclined Chain Specially made Heavy duty ; 3” pitch ;
belt Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working
loads under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 1000mm width ; 10000mm length 3 ply to resist
abrasion & cutting , 10mm thick , with top covering 2mm
Resistant to oil , heat & fires, with bottom covering
1.5mm & Chemical grade 1&2 , Brand : ISI ; Grade –M
24 ; and Belt tension as per IS
Sprockets 3 “ Pitch ;
a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed
to weather will be mechanically cleaned to remove all
rust and scale & then 2 coats of anti corrosive Zinc
Chromate Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std.
Return Line Filter: - Standard Make .
Power Hydraulic
CHAIN LINER (UHMW) Special anti friction synthetic liner to reduce friction,
(OR ) 8 mm thick bright steel EN8 flat as a liner which
has better result & less maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
condition & Height of the Discharge point and for
Manual segregation Provisions.
Walkway & provision for Manual segregation to be
provided where ever necessary with chutes provision to
drop the manual segregation items.
5. Process Conveyor < 175 ; Carries <175 mm materials in to second Trommel of
mm screen size.
This Conveyor carries Undersized materials from first trammel to second trammel . this is Z
type Chain belt Conveyor.
Technical data for Processing Conveyor to 2nd Trommel of 75 mm Screen :
Structure Various rolled steel sections As per IS2062 GR 2A
ISMC 125, ISMC 75 etc.
Hopper Chute M S Sheet 10 & 12 SWG ( Side Guards, Covers etc)
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
speed, motor plus hydraulic power into work which is
expressed in the direct relation between flow rate, speed,
pressure and torque.
Chain ( Z Type Chain belt Specially made Heavy duty ; 3” pitch ;
Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working loads
under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 1000mm width ; 15000mm length 3 ply to resist abrasion &
cutting , 12mm thick , with top covering 2mm Resistant to
oil , heat & fires, with bottom covering 1.5mm & Chemical
grade 1&2 , Brand : ISI ; Grade –M 24 ; and Belt tension
Sprockets 3 “ Pitch ;
a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed to
weather will be mechanically cleaned to remove all rust
and scale & then 2 coats of anti corrosive Zinc Chromate
Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Return Line Filter: - Standard Make .
Power & Speed Hydraulic & 3 + - rpm
Chain Liner (UHMW) Special anti friction synthetic liner to reduce friction, (OR )
8 mm thick bright steel EN8 flat as a liner which has better
result & less maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
condition & Height of the Trommel.
Walkway & provision for Manual segregation to be
provided where ever necessary with chutes provision to
drop the manual segregation items.
6. 75mm Trommel Screen ( Rotary Trommel)
This is the Rotary Screen which separates material on the basis of over size (>75mm)
rejects (>75mm size ) materials will be carried to RDF Section Shredder and undersized
materials forwarded to Windrow Platform through belt conveyor system.
Technical data for 75mm Trommel Screen:
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 , 12 & 14 Gauge
Drive Friction drive with Solid Rubber, rubber special grade shore
hardness 90, in Both system Electric & Hydraulic.
Hydraulic Motor Hydraulic working on constant displacement and achieve high
torque at low speed, motor plus hydraulic power into work which
is expressed in the direct relation between flow rate, speed,
pressure and torque.
Tyres Specially made , Heavy duty , Solid Rubber Tyres
Screen 75 mm size holes in Diagonal
Ring Fabricated heavy duty
Surface Blasting & Pickling
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Primer & Paint Epoxy Primer , Epoxy Paint.
Length 6 mts screen Length & 1 mts length on both end ( 8mts in total
Diameter 2500mm Dia
Height Around 4.5 mts
Speed 8 +- 1 rpm
Drum Cleaning Wire Brushes and , bag cutting blades for bag tearing provision
Fully covered heavy duty dust covers & easily replaceable
7. Rejection Conveyor of >75mm:
This conveyor carries all the materials which are >75 mm size to RDF section .
Technical data for Straight Inclined Conveyor to RDF section (>75mm) :
Structure Various rolled steel sections As per IS2062 GR 2A
ISMC 125, ISMC 75 etc.
Speed 12 + - rpm
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
speed, motor plus hydraulic power into work which is
expressed in the direct relation between flow rate, speed,
pressure and torque.
Chain ( Inclined Chain belt Specially made Heavy duty ; 3” pitch ;
Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working loads
under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 1000mm width ; 10000mm length 3 ply to resist abrasion &
cutting , 10mm thick , with top covering 2mm Resistant to
oil , heat & fires,
with bottom covering 1.5mm & Chemical grade 1&2
Brand : ISI ; Grade –M 24 ; and Belt tension as per IS
Sprockets 3 “ Pitch ;
a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed to
weather will be mechanically cleaned to remove all rust
and scale & then 2 coats of anti corrosive Zinc Chromate
Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Return Line Filter: - Standard Make .
Power Hydraulic
CHAIN LINER (UHMW) Special anti friction synthetic liner to reduce friction, (OR )
8 mm thick bright steel EN8 flat as a liner which has better
result & less maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
condition & Height of the Discharge point .
8. Process Conveyor to Carry <75 mm to windrow area
The material received from 75mm screen (undersigned Materials) will be transported to
Technical data for Inclined Conveyor to carry <100mm to windrow area. :
Structure Various rolled steel sections As per IS2062 GR 2A
Hopper Chute M S Sheet 12 & 14 SWG ( Side Guards, Covers etc)
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
speed, motor plus hydraulic power into work which is
expressed in the direct relation between flow rate, speed,
pressure and torque.
Chain ( Z Type Chain belt Specially made Heavy duty ; 3” pitch ;
Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working loads
under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 1000mm width ; 15000mm length , 3 ply to resist
abrasion & cutting , 12mm thick , with top covering 2mm
Resistant to oil , heat & fires, with bottom covering 1.5mm
& Chemical grade 1&2 , Brand : ISI ; Grade –M 24 ; and
Belt tension as per IS
Sprockets 3 “ Pitch ;
a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed to
weather will be mechanically cleaned to remove all rust
and scale & then 2 coats of anti corrosive Zinc Chromate
Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Return Line Filter: - Standard Make .
Power & Speed Hydraulic & 3 + - rpm
CHAIN LINER (UHMW) Special anti friction synthetic liner to reduce friction, (OR )
8 mm thick bright steel EN8 flat as a liner which has better
result & less maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
condition & Height of the Trommel.
9. Cross / Extension Conveyor to carry <75 mass to windrow area:
This Conveyor ( flat/ Inclined conveyor ) is planned to carry the <75 materials in to windrow
Technical data for Cross / Extension Conveyor :
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 , 12 & 14 Gauge
Gear Box Shaft Mounted ( SGR )
Motor Electrical
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 800mm width& 15000mm , 2 ply , with 10mm thick , rubberized
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
& Height of the Discharge..
10. Air Density separator (ADS) with proper chute to avoid Spillage:
This is an unique equipment which segregates material on the basis of difference of weight.
In this process all pebbles and density materials will be separated and will be sent to
Landfill. The light weight materials will be sent to RDF section for baling.
Technical data for Air Density Separator:
Structure Casted base plate & Links, Various rolled Steel sections
Covers M. S Sheet , 12 & 14 SWG
Drive Mode Electrical Motor
Screen Blower Duct
Fan M.S. fabricated
Surface Blasting & Pickling
Capacity 10 TPH
Note Easy maintainability , Balanced fans to give Minimum Vibrations
and all steel equipment‟s confirms IS :
11. RDF Process Conveyor ( >75mm mass)
This conveyor is to carry the light weight mass from ADS to Baling unit. This is placed after
the >75 Process conveyor to remove sand & dust in the >75 mass material to make use of
Technical data for RDF process Conveyor (>75 mass)
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
125, ISMC 75 etc.
Covers M. S Sheet , 10 , 12 & 14 Gauge
Gear Box Shaft Mounted ( SGR )
Motor Electrical / Hydraulic
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 1000mm width & 10000mm length, 2ply , with 12mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site
condition & Height of the discharge
12. Reject Conveyor to Inert Storage :
This conveyor is placed along with ADS to carry heavy / Density materials in to rejects area.
This rejects passed through this conveyor will be sent directly in to Landfill site.
Technical data for Rejects Conveyor ( ADS Rejects of >75 mass):
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
125, ISMC 75 etc.
Covers M. S Sheet , 10 &12 Gauge
Gear Box Shaft Mounted ( SGR )
Motor & Drive Hydraulic Drive
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 800mm width & 8000mm length , 2 ply , with 10mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site
condition & Height of the drop.
13. Magnetic Separator :
Magnetic drum will be positioned along with 75mm Conveyors to remove ferrous materials if
14. Hydraulic Power pack Dual ( 30 HP + 30 HP):
Hydraulic system meant to run all Hydraulic Motor driven equipment‟s. It consists of Power
pack with Convert Electrical energy in to Hydraulic energy, which in turn is connected to all
Technical data for Hydraulic Power pack :
Power Pack Closed circuit manifold type
Tank Capacity 400 – 600 Lts
Drive Electrical
Manifold Specially designed
Pump Twin Stage , Heavy duty
Motors Radial Piston & Orbit
Cooling Forced water Circulation in cooling tank through
Controls Push Button type Control panel for each unit
Working fluid Standard make
15. Control Panel Board :
Control system consists of different Electrical panels to give easy control. All control Panels
should have push button type control
Technical data for Electrical Control System :
Body All MS as per : IS 2062 sheet 12 & 14 swg.
Control elements & Electrical accessories Standard Make ; MVB Electrical Unit
Enclosure As per IPSS & as per std IP
Display Temp , Voltage , On , Off display
Indicator 3 Phase indicator with protector
Note : Electrical Cables and other Hydraulic lines should be standard make only.
B. Preparatory section ( 35mm & 16mm Screen) – 15 TPH
1. Feeding Conveyor with Hopper
Decomposed / Digested mass of <100 mm is fed in to this conveyor for further screens
Technical data for Z Type Conveyor to 35 mm Trommel (35 mm Screen) :
Structure Various rolled steel sections As per IS2062 GR 2A
ISMC 125, ISMC 75 etc.
Speed 12 + - rpm
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
speed, motor plus hydraulic power into work which is
expressed in the direct relation between flow rate, speed,
pressure and torque.
Chain ( Inclined Chain belt Specially made Heavy duty ; 3” pitch ;
Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working loads
under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 1000mm width ; 12000mm length , 3 ply to resist
abrasion & cutting , 10mm thick , with top covering 2mm
Resistant to oil , heat & fires, with bottom covering 1.5mm
& Chemical grade 1&2 , Brand : ISI ; Grade –M 24 ; and
Belt tension as per IS
Sprockets 3 “ Pitch ;
a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed to
weather will be mechanically cleaned to remove all rust
and scale & then 2 coats of anti corrosive Zinc Chromate
Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Return Line Filter: - Standard Make .
Power Hydraulic
CHAIN LINER (UHMW) Special anti friction synthetic liner to reduce friction, (OR )
8 mm thick bright steel EN8 flat as a liner which has better
result & less maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
condition & Height of the Discharge point and for Manual
segregation Provisions.
2. Trommel with 35mm Screen
Technical data for 35 mm Trommel Screen:
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 , 12 & 14 Gauge
Drive Friction drive with Solid Rubber, rubber special grade shore
hardness 90, in Both system Electric & Hydraulic.
Hydraulic Motor Hydraulic working on constant displacement and achieve high
torque at low speed, motor plus hydraulic power into work which
is expressed in the
direct relation between flow rate, speed, pressure and torque.
Tyres Specially made , Heavy duty , Solid Rubber Tyres
Screen 35 mm size holes in Diagonal
Ring Fabricated heavy duty
Surface Blasting & Pickling
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Primer & Paint Epoxy Primer , Epoxy Paint.
Length 6 mts screen Length & 1 mt length on both end ( 8 mts in total
Diameter 2000mm Dia
Height Around 4.5 mts
Speed 8 +- 1 rpm
Drum Cleaning Wire Brushes and , bag cutting blades for bag tearing provision
Fully covered heavy duty dust covers & easily replaceable
3. Reject Conveyor ( > 35mm to rejects)
Technical data for Rejects Conveyor ( >35 mm mass):
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &12 Gauge
Gear Box Shaft Mounted ( SGR )
Motor & Drive Hydraulic Drive
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 650mm width & 6000mm length , 2 ply , with 8 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
4. Air Density Separator with chute to avoid Spillage : Technical data for Air Density
Structure Casted base plate & Links, Various rolled Steel sections
Covers M. S Sheet , 12 & 14 SWG
Drive Mode Electrical Motor
Screen Blower Duct
Fan M.S. fabricated
Surface Blasting & Pickling
Capacity 10 TPH
Note Easy maintainability , Balanced fans to give Minimum Vibrations
steel equipment‟s confirms IS :
5. RDF Process Conveyor for Baling Section : Technical data for RDF process
Conveyor (> 35 mass)
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &, 12 SWG
Gear Box Shaft Mounted ( SGR )
Motor Electrical / Hydraulic
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 800mm width & 8000mm length , 2 ply , with 8 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
& Height of the discharge
6. Reject Conveyor to Inert Storage :
Technical data for Rejects Conveyor ( ADS Rejects of > 35 mass):
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &12 Gauge
Gear Box Shaft Mounted ( SGR )
Motor & Drive Hydraulic Drive
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 800 mm width & 8000mm length , 2 ply , with 8 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
& Height of the Trommel..
7. Process Conveyor < 35mm to 16mm Trommel
Technical data for Inclined Conveyor to carry <35mm to 16mm Trommel. :
Structure Various rolled steel sections As per IS2062 GR 2A
Hopper Chute M S Sheet 12 & 14 SWG ( Side Guards, Covers etc)
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
speed, motor plus hydraulic power into work which is
expressed in the direct
relation between flow rate, speed, pressure and torque.
Chain ( Z Type Chain belt Specially made Heavy duty ; 3” pitch ;
Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working loads
under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 1000mm width ; 15000mm length , 3 ply to resist
abrasion & cutting , 10 mm thick , with top covering 2mm
Resistant to oil , heat & fires, with bottom covering 1.5mm
& Chemical grade 1&2 , Brand : ISI ; Grade –M 24 ; and
Belt tension as per IS
Sprockets 3 “ Pitch ;
a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed to
weather will be mechanically cleaned to remove all rust
and scale & then 2 coats of anti corrosive Zinc Chromate
Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Return Line Filter: - Standard Make .
Power & Speed Hydraulic & 3 + - rpm
CHAIN LINER (UHMW) Special anti friction synthetic liner to reduce friction, (OR )
8 mm thick bright steel EN8 flat as a liner which has better
result & less maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
condition & Height of the Trommel..
8. Trommel with 16mm Screen ( 4.5 mt screen Length): Technical data for 16 mm
Trommel Screen:
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 , 12 & 14 Gauge
Drive Friction drive with Solid Rubber, rubber special grade shore
hardness 90, in Both system Electric & Hydraulic.
Hydraulic Motor Hydraulic working on constant displacement and achieve high
torque at low speed, motor plus hydraulic power into work which
is expressed in the direct relation between flow rate, speed,
pressure and torque.
Tiers Specially made , Heavy duty , Solid Rubber Tiers
Screen 16 mm size holes in Diagonal
Ring Fabricated heavy duty
Surface Blasting & Pickling
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Primer & Paint Epoxy Primer , Epoxy Paint.
Length 4.5 mts screen Length & 0.5 mt length on both end ( 6.5 mts in
Diameter 2000mm Dia
Height Around 4.5 mts
Speed 8 +- 1 rpm
Drum Cleaning Wire Brushes and , bag cutting blades for bag tearing provision
Fully covered heavy duty dust covers & easily replaceable
9. Reject Conveyor ( > 16mm to rejects)
Technical data for Rejects Conveyor ( >35 mm mass):
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &12 Gauge
Gear Box Shaft Mounted ( SGR )
Motor & Drive Hydraulic Drive
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 650mm width & 6000mm length , 2 ply , with 8 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
10. Air Density Separator with chute to avoid Spillage :
Technical data for Air Density Separator:
Structure Casted base plate & Links, Various rolled Steel sections
Covers M. S Sheet , 12 & 14 SWG
Drive Mode Electrical Motor
Screen Blower Duct
Fan M.S. fabricated
Surface Blasting & Pickling
Capacity 10 TPH
Note Easy maintainability , Balanced fans to give Minimum Vibrations
steel equipment‟s confirms IS :
11. RDF Process Conveyor for Baling Section :
Technical data for RDF process Conveyor (> 16 mass)
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &, 12 SWG
Gear Box Shaft Mounted ( SGR )
Motor Electrical / Hydraulic
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 600mm width & 8000mm length , 2 ply , with 8 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
12. Reject Conveyor to Inert Storage :
This conveyor is placed along with ADS to carry heavy / Density materials in to rejects area.
This rejects passed through this conveyor will be sent directly in to Landfill site.
Technical data for Rejects Conveyor ( ADS Rejects of > 16 mass):
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &12 Gauge
Gear Box Shaft Mounted ( SGR )
Motor & Drive Hydraulic Drive
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 650 mm width & 8000mm length , 2 ply , with 8 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
13. Process Conveyor to carry <16mm mass to Curing shed : Technical data for
Inclined Conveyor to carry <16mm to curing shed :
Structure Various rolled steel sections As per IS2062 GR 2A
Hopper Chute M S Sheet 12 & 14 SWG ( Side Guards, Covers etc)
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
speed, motor plus hydraulic power into work which is
expressed in the direct
relation between flow rate, speed, pressure and torque.
Chain ( Z Type Chain belt Specially made Heavy duty ; 3” pitch ;
Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working loads
under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 800 mm width ; 15000mm length , 3 ply to resist abrasion
, 10 mm thick , with top covering 2mm Resistant to oil
heat & fires, with bottom covering 1.5mm & Chemical
grade 1&2 , Brand : ISI ; Grade –M 24 ; and Belt tension
Sprockets 3 “ Pitch ;
a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed to
weather will be mechanically cleaned to remove all rust
and scale & then 2 coats of anti corrosive Zinc Chromate
Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Return Line Filter: - Standard Make .
Power & Speed Hydraulic & 3 + - rpm
CHAIN LINER (UHMW) Special anti friction synthetic liner to reduce friction, (OR )
thick bright steel EN8 flat as a liner which has better result
& less maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
condition & Height of dropping Position.
14. Multiport Distributor Conveyor :
Technical data for Cross / Extension Conveyor / Multi port Distributor Conveyor
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 & 12 MSG
Gear Box Shaft Mounted ( SGR )
Motor Electrical
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 800mm width & 15000mm length , 2 ply , with 10mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
15. Magnetic Separator :
Magnetic drum will be positioned along with 100mm Conveyors to remove ferrous materials if
16. Hydraulic Power pack Dual ( 30 HP + 30 HP):
Hydraulic system meant to run all Hydraulic Motor driven equipment‟s. It consists of Power
pack with Convert Electrical energy in to Hydraulic energy, which in turn is connected to all
Technical data for Hydraulic Power pack :
Power Pack Closed circuit manifold type
Tank Capacity 400 – 600 Lts
Drive Electrical
Manifold Specially designed
Pump Twin Stage , Heavy duty
Motors Radial Piston & Orbit
Cooling Forced water Circulation in cooling tank through
Controls Push Button type Control panel for each unit
Working fluid Standard make
17. Control Panel Board :
Control system consists of different Electrical panels to give easy control. All control Panels
should have push button type control
Technical data for Electrical Control System :
Body All MS as per : IS 2062 sheet 12 & 14 swg.
Control elements & Electrical accessories Standard Make ; MVB Electrical Unit
Enclosure As per IPSS & as per std IP
Display Temp , Voltage , On , Off display
Indicator 3 Phase indicator with protector
C. Refinement Section : ( Final Compost Section 10 TPH ) :
1. Feeding Conveyor with Hopper
Decomposed / Digested mass of <16 mm is fed in to this conveyor for Final Compost
Technical data for Conveyor to 6 mm Trommel (6 mm Screen) :
Structure Various rolled steel sections As per IS2062 GR 2A
Speed 12 + - rpm
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
speed, motor plus hydraulic power into work which is
expressed in the direct
relation between flow rate, speed, pressure and torque.
Chain ( Inclined Chain belt Specially made Heavy duty ; 3” pitch ;
Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working loads
under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 800 mm width ; 12000mm length , 3 ply to resist abrasion
& cutting, 8 mm thick , with top covering 2mm Resistant to
oil , heat & fires,
with bottom covering 1.5mm & Chemical grade 1&2
Brand : ISI ; Grade –M 24 ; and Belt tension as per IS
Sprockets 3 “ Pitch ;
a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed to
weather will be mechanically cleaned to remove all rust
and scale & then 2 coats of anti corrosive Zinc Chromate
Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Return Line Filter: - Standard Make .
Power Hydraulic
CHAIN LINER (UHMW) Special anti friction synthetic liner to reduce friction, (OR )
thick bright steel EN8 flat as a liner which has better result
& less maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
condition & Height of the Discharge point and for Manual
2. Trommel with 6 mm Screen
Technical data for 6 mm Trommel Screen:
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 , 12 & 14 Gauge
Drive Friction drive with Solid Rubber, rubber special grade shore
in Both system Electric & Hydraulic.
Hydraulic Motor Hydraulic working on constant displacement and achieve high
torque at low speed, motor plus hydraulic power into work which
is expressed in the
direct relation between flow rate, speed, pressure and torque.
Tyres Specially made , Heavy duty , Solid Rubber Tyres
Screen 6 mm size holes in Diagonal
Ring Fabricated heavy duty
Surface Blasting & Pickling
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Primer & Paint Epoxy Primer , Epoxy Paint.
Length 3 mts screen Length & 1 mt length on both end ( 5 mts in total
Diameter 1650mm Dia
Height Around 3.5 mts
Speed 8 +- 1 rpm
Drum Cleaning Wire Brushes and , bag cutting blades for bag tearing provision
Fully covered heavy duty dust covers & easily replaceable
3. Reject Conveyor ( > 6 mm to rejects)
Technical data for Rejects Conveyor ( >6 mm mass):
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &12 Gauge
Gear Box Shaft Mounted ( SGR )
Motor & Drive Hydraulic Drive
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 650mm width & 6000mm length , 2 ply , with 8 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
& Height of the drop..
4. Process Conveyor for Gravity Separator :
Technical data for Gravity Separator ( < 6mm mass)
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &, 12 SWG
Gear Box Shaft Mounted ( SGR )
Motor Electrical / Hydraulic
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 650 mm width & 10000mm length , 2 ply , with 8 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
5. Gravity Separator ( De-stoner ) Technical data for Gravity Separator:
Structure Casted base plate & Links, Various rolled Steel sections
Covers M. S Sheet , 12 & 14 SWG
Drive Mode Electrical Motor
Screen Blower Duct , Spring Steel , Woven wire
Fan M.S. fabricated
Surface Blasting & Pickling
Capacity 10 TPH
Note Easy maintainability , Balanced fans to give Minimum Vibrations
steel equipment‟s confirms IS :
6. Reject Conveyor to Inert Storage :
This conveyor is placed along with Gravity Separator to carry heavy / Density materials in to
rejects area. This rejects passed through this conveyor will be sent directly in to Landfill site.
Technical data for Rejects Conveyor ( ADS Rejects of > 6mm mass):
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &12 Gauge
Gear Box Shaft Mounted ( SGR )
Motor & Drive Hydraulic Drive
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 650 mm width & 8000mm length , 2 ply , with 8 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
7. Process Conveyor < 6 mm ( Compost Conveyor)
Technical data for Inclined Conveyor to carry <6 mm to stock yard. :
Structure Various rolled steel sections As per IS2062 GR 2A
Hopper Chute M S Sheet 12 & 14 SWG ( Side Guards, Covers etc)
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
speed, motor plus hydraulic power into work which is
expressed in the direct
relation between flow rate, speed, pressure and torque.
Chain (Chain belt Specially made Heavy duty ; 3” pitch ;
Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working loads
under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 650mm width ; 15000mm length , 2 ply to resist abrasion &
, 8 mm thick , with top covering 2mm Resistant to oil , heat
& fires, with bottom covering 1.5mm & Chemical grade
1&2 , Brand : ISI ;
Grade –M 24 ; and Belt tension as per IS
Sprockets 3 “ Pitch ;
a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed to
weather will be mechanically cleaned to remove all rust
and scale & then 2 coats of anti corrosive Zinc Chromate
Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Return Line Filter: - Standard Make .
Power & Speed Hydraulic & 3 + - rpm
CHAIN LINER (UHMW) Special anti friction synthetic liner to reduce friction, (OR )
8 mm thick bright steel EN8 flat as a liner which has better
maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
Height of the drop.
8. Multiport Distributor Conveyor :
Technical data for Cross / Extension Conveyor / Multi port Distributor Conveyor
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 & 12 MSG
Gear Box Shaft Mounted ( SGR )
Motor Electrical
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 650mm width & 15000mm length , 2 ply , with 8 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
9. Hydraulic Power pack ( 20 HP):
Hydraulic system meant to run all Hydraulic Motor driven equipment‟s. It consists of Power
pack with Convert Electrical energy in to Hydraulic energy, which in turn is connected to all
Technical data for Hydraulic Power pack :
Power Pack Closed circuit manifold type
Tank Capacity 400 – 600 Lts
Drive Electrical
Manifold Specially designed
Pump Twin Stage , Heavy duty
Motors Radial Piston & Orbit
Cooling Forced water Circulation in cooling tank through
Controls Push Button type Control panel for each unit
Working fluid Standard make
10. Control Panel Board :
Control system consists of different Electrical panels to give easy control. All control Panels
should have push button type control
Technical data for Electrical Control System :
Body All MS as per : IS 2062 sheet 12 & 14 swg.
Control elements & Electrical accessories Standard Make ; MVB Electrical Unit
Enclosure As per IPSS & as per std IP
Display Temp , Voltage , On , Off display
Indicator 3 Phase indicator with protector
D. RDF Section ( 10 TPH ) :
1. Feeder Conveyor
RDF mass of >75 mm is fed in to this conveyor for further screens
Technical data for Z Type/ Inclined Conveyor to Shredder :
Structure Various rolled steel sections As per IS2062 GR 2A
Speed 12 + - rpm
Fabrication As Per IS-801
Gear Box Type WGR ; Type: -Worm Shaft, Helical, geared motor.
Motor Hydraulic Radial Piston type ; Hydraulic working on
constant displacement and achieve high torque at low
speed, motor plus hydraulic power into work which is
expressed in the direct
relation between flow rate, speed, pressure and torque.
Chain ( Inclined Chain belt Specially made Heavy duty ; 3” pitch ;
Conveyor) a). Bushed & Roller Chain
b). Power Transmit - 98% efficiency for all working loads
under lubricated condition
c). parts : light weight & Compact pins & bushing
Carburized & case hardened for wear.
Belt 1000mm width ; 10000mm length , 3 ply to resist
abrasion & cutting , 10 mm thick , with top covering 2mm
Resistant to oil , heat & fires, with bottom covering 1.5mm
& Chemical grade 1&2
Brand : ISI ; Grade –M 24 ; and Belt tension as per IS
Sprockets 3 “ Pitch ; a) Material: - EN8 x 22 mm Thick.
b) Heat treatment after Fabrication & Machining.
c) No. of Teeth :-
Surface Blasting & Pickling
Primary & Paint Epoxy Primer & Epoxy Paint. All steel surfaces exposed to
weather will be mechanically cleaned to remove all rust
and scale & then 2 coats of anti corrosive Zinc Chromate
Red Oxide each 20 micron layer.
Then 2 coats of Industrial grade Enamel paint of reputed
Asian, Berger etc. the colour will be of the customer‟s
Hydraulic Line Hydraulic Piping & Fittings: - Seamless Pipes & Std. Make
Return Line Filter: - Standard Make .
Power Hydraulic
CHAIN LINER (UHMW) Special anti friction synthetic liner to reduce friction, (OR )
8 mm thick bright steel EN8 flat as a liner which has better
maintenance & easy to replace.
Note Length & Discharge Height may be varied as per site
condition & Height of the Discharge point and for Manual
2. Primary Shredder 10TPH capacity shredder machine
Motor & Gear Box a) Twin shafts wet MSW shredding machine of 10 TPH
consist of Main Drive Motor Crompton make, Reduction Gear
Box Elecon/Greaves make,
Advanced Starter panel Schneider make and the construction
machine to the specifications as per the requirement with civil
Type Horizontal twin shafts shredder machine
Cutting Chamber: Knives cleaning Bar made of alloy steel
: Cutting assembly left and right cutting motion
: Reinforced Sub-base Frame.
Cutter spacers Shredder spacers also shock proof
: Main shaft steel description should be provide
Bulk Density of MSW 0.3 to 0.5 t/m3
Expected Grain size 50mm to 70mm
Material Charge Through Conveyor
Material Discharge Through Conveyor
3. Process Conveyor
Technical data for Process Conveyor Shredder to Drier /Baling Unit
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &, 12 SWG
Gear Box Shaft Mounted ( SGR )
Motor Electrical / Hydraulic
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 1000mm width & 10000mm length , 3 ply , with 10 mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
4. Reject Conveyor
Technical data for RDF Material from Drier to Baling Unit
Structure Various rolled steel sections As per IS2062 GR 2A , ISMC
Covers M. S Sheet , 10 &, 12 SWG
Gear Box Shaft Mounted ( SGR )
Motor Electrical / Hydraulic
Chain Specially made Heavy duty ; 3” pitch ; a). Bushed & Roller
Belt 1000mm width & 10000mm length , 3 ply , with 10mm thick
Sprockets 3 “ pitch
Speed 12 + - rpm
Note Length & Discharge Height may be varied as per site condition
5. Baling Unit.
Technical specifications of baling unit
Baling Chamber 18” x 24” x 54 " (w x h x l)
Bale size 9” x 9” x v (w x h x l) 10" x 10"
Weight of Bale 25 – 40 kgs
operation of the machine auto cycle thru push button
Cycle time 15 -20 seconds
Drive Electrical
6. Control Panel Board :
Control system consists of different Electrical panels to give easy control. All control Panels
should have push button type control
Technical data for Electrical Control System :
Body All MS as per : IS 2062 sheet 12 & 14 swg.
Control elements & Electrical accessories Standard Make ; MVB Electrical Unit
Enclosure As per IPSS & as per Std IP
Display Temp , Voltage , On , Off display
Indicator 3 Phase indicator with protector
Schedule of Project Execution
No Brief Description Timeline from date of work order
1 Civil Works 9 months
Supply, erection of Plant,
Equipment and Machinery
3 Electrical Works 10 months
Testing and commissioning of
Plant, Equipment and Machinery
5 Supply of Vehicles Bidder shall deploy suitable and required
number of vehicle for smooth operation of plant
6 Compound Development 12 months
This is minimum tentative list of equipment’s/machineries required for the proposed
plant. The contractor has to deploy equipment’s/machineries according to his
technology and scheme for Operation and Maintenance.
Electric Control Room: An Electric control panel room will be made at one corner,
keeping in mind the requirement of electricity for running of machines auxiliary as well
as for lighting purposes of office and residential quarters. All the electrification work of
the plant shall be approved by licensed electric engineer / electric inspector. The
certificate for the same shall be submitted to VMC for approval before commissioning of
Diesel Generator set: - To ensure uninterrupted processing of MSW received from
Secondary Transfer Station, in case of interruption in the power supply, to ensure
continuous operation of the plant, the contractor has to arrange D.G. set at his own cost. It
is to be noted that no charges towards the D.G. set arranged during Concession period,
shall be not paid by VMC.
Landscaping & Lighting: The Complex/site shall be equipped with the LED lights and
the Complex shall be suitably landscaped.
Quarters: Quarters/Pre - fabricated containers for workers/staff and watchman shall be
constructed at the site. Site development and necessary fencing /barricading around the
boundary of the plant shall have to be done by the Contractor.
Concrete Roads: Concrete roads for both incoming and outgoing waste tracks/vehicles
shall be made to avoid traffic congestion. Also Concrete roads shall be made for all
internal transits within the plant connecting Presort, Windrow, Refinement section and
other units, etc.
Certification: All the equipment / machines of adequate sizes and capacity and
manufactures shall be ISO & CE certified.
Recovery of plastics and Refuse Derived Fuel: - The bidder has to install a RDF
processing unit for converting the hard to digest but combustible fraction of the Municipal
Waste into Fluff form. The RDF will be baled. The RDF is a useful material and is being
increasingly used in cement plants as part replacement for local deriving cost advantage as
well as in boilers in some process industries. Air Density Separators, Shredder and bailers
are the key equipment for the RDF stream.
All kind of plumber work, sewer and drainage work, electrification work in all
buildings, toilet blocks, open space, parking, sheds etc. shall be as per NBCC and
applicable relevant industrial codes.
Signature of The Contractor
12. SCOPE OF WORK:
Vadodara Municipal Corporation is desirous of implementing an „Integrated Municipal Solid
Waste Management Project‟ covering various components of waste. So, part of the services
(Processing of Waste) is being contracted in this contract. The selected bidder/agency
would be required to take up following components under this contract assignment at their
1. The Contractor/ Bidder shall be responsible for designing, drawing, fabrication,
supplying, providing, erecting constructing, testing & commissioning of the SOLID WASTE
presorting, processing Plant at the Project site o Built Operate & Transfer basis.
2. To carry out soil bearing capacity tests before commencement of construction / civil
works to obtain data t develop foundation designs and relevant activities.
3. Preparation of design, drawing and specifications of required civil works and plant &
machinery of capacity for processing of waste likely to generate till next 10 years.
4. Bidder should install MSW to composting plant which includes minimum of, but not
limited to compost, RD and recyclable sections.
5. All the design, drawing & specification should be vetted from any Govt. institute/
authorities preferably within the state boundary. The amount needed for vetting to be borne
by the concerned agency.
6. The Contractor/ Bidder shall operate and maintain the Plant for a period of 10 (Ten)
years (“Contract Period” for processing of 500 MT / Day of waste.
7. To conduct primary site investigation such as topographic, total station survey, physio-
chemical analysis of waste etc.
8. The Contractor/ Bidder shall be provided weighed SOLID WASTE at the Project site
and they shall maintain daily records of the same and submit to VMC. Similarly, Contractor/
Bidder shall discharge the inert to VMC owned Sanitary Landfill Facility after weighing the
same at the weigh bridge of VMC. Inert generated from the plant is recommended to
keep below 20% of the total waste given for processing, while penalty @1.1 times of
quoted rate shall be recovered for additional quantum of inert/ reject. The existing SLF is in
operation which is situated at Jambuva Dump Site.
9. Moreover, the Contractor/Bidder shall have to ensure a designated place for temporary
storage of inert a site along with necessary arrangements for lifting of inert from the site.
Contractor has to make provision for required machineries/vehicles for lifting of inert at site
along with scientific disposal of inert at existing Sanitary Landfill Cell.
10. The Contractor/ Bidder shall be responsible for setting up of all the units as required to
operate this facility a per its own design and VMC shall not be obligated to provide any
financial or other such support. However VMC shall give all other support, including grant of
necessary permissions, approval etc.
11. Prior to establishment of the Plant, the Contractor/ Bidder shall carry out a detailed study
and analysis o the SOLID WASTE generated/created within the VMC Limits and shall
ensure that the Plant will be operated as per the features and characteristics of the SOLID
WASTE so generated/created within the VMC Limits.
12. The Contractor/ Bidder shall submit necessary plans/drawings to the relevant
department of Vadodara Municipal Corporation and shall be responsible to execute the
Project as per the submitted plans/drawing and as approved by the relevant department of,
Vadodara Municipal Corporation.
13. Any variation/changes in the drawing/plans proposed by the Contractor/ Bidder shall be
carried out from time to time and submitted to the relevant / Solid Waste Management,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Press Note.pdf
Tender Document.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .