EE UJS NTL
Office of Executive Engineer Uttarakhand Jal Sansthan Nagar Palika Building, 2nd Floor, Mallital, Nainital.
Strengthening of Deeni Talli (Malli) Water Supply Scheme in Dhari.
2026_UKJS_93543_1
751/E-Tender/03 Date 24-03-2026
Open Tender
Civil Works
Item Rate
90 days
Office of Executive Engineer Uttarakhand Jal Sanst
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
EE UJS NTL
₹2.6 L
EE UJS NTL
25 Mar 2026
25 Mar 2026
10 Apr 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
28 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately (Considering 30%) | 5.95 | Cum | - | - |
| - | Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepeared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383,maximum size ofcoarse aggregate notexceeding 25 mm,mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork and laying and fixing of 125 micron thick polythene film, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specifications. | 5.95 | Cum | - | - |
| - | Excavation in Pipe Line Trenches:
Excavation in ordinary soil (loam, clay, sand) for foundation including lift up to 1.5M and lead up to 30M filling waterring and ramming of Excavated the earth in to the trenches or into the sides between foundation trenches or in to the plinth (75% of Total Quantity) | 1,939.38 | Cum | - | - |
| - | Excavation in soil mixed with shingle bouldres etc. requireing the use of specials T&P, if any, for pipe line trenches including lift up to 1.5M and lead up to 30M with back filling,waterring and ramming of Excavated earth in the trenches.(25% of Total Quantity) | 9.22 | Cum | - | - |
| - | SCC cum Roughening Filter:Supply of all materials,labour T&P etc. for construction of Boulder Filled Gallery complete in all respects | 4 | No | - | - |
| - | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately (Considering 5%) | 10.69 | Cum | - | - |
| - | Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383,maximum size of coarse aggregate not exceding 25 mm,mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork and laying and fixing of 125 micron thick polythene film, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specifications. | 10.69 | Cum | - | - |
| - | Excavation in Pipe Line Trenches
Excavation in ordinary soil (loam, clay, sand) for foundation including lift up to 1.5M and lead up to 30M filling waterring and ramming of Excavated the earth in to the trenches or into the sides between foundation trenches or in to the plinth (75% of Total Quantity) @ 80% of overall length. | 6,463.37 | Cum | - | - |
| - | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 16.64 | Cum | - | - |
| - | Providing of all materials, Carting from site store to site of work, Laying & Jointing of G.I screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete.G.I. PIPE CONFORMING TO IS : 1239(PART-1) Medium Duty (Class 'B') | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_110725.xls
BOQ • 0.25 MB
01.pdf
Tender Documents • 7.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .