Tender Value
₹23.3 L
EMD Value
₹23,300
Closing Date
23 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
The Chief Officer, Balasinor Municipality, Balasinor
BID DOCUMENTS FOR CONSTRUCTION WORK OF C.C. ROAD, PAVER BLOCK ROAD, DRAINAGE LINE (SEWER LINE) IN VARIOUS AREA AT BALASINOR.,DIST. MAHISAGAR.UNDER SWARNIM JAYNTI MUKHYA MANTRI SAHERI VIKAS YOJANA (UDP88)(YEAR: 2025-26) GRANT.SECOND ATTEMPT
283555
2025-26
Open
Civil - All
Mahisagar
13 documents required · 13 mandatory
₹1,062
The Chief Officer, Balasinor Municipality, Balasinor
₹23,300
6 Mar 2026
6 Mar 2026
6 Mar 2026
23 Mar 2026
6 Mar 2026
NAME OF WORK :- CONSTRUCTION WORK OF C.C.ROAD, PAVER BLOCK ROAD, DRAINAGE LINE(SEWER LINE)IN VARIOUS
AREA AT BALASINOR.,DIST.: MAHISAGAR.SECOND ATTEMPT
GRANT: SWARNIM JAYNTI MUKHYA MANTRI SAHERI VIKAS YOJANA (UDP-88)(YEAR: 2025-26)
RECEPITULATION SHEET
Schedule- Name of Work AMOUNT in Rate In Words
1 CONSTRUCTION WORK OF PAVER BLOCK PAVING AT 1331300.00 Rupees Thirteen Lakh(s) Thirty One
KEDARESHWAR MAHADEV DHAL ROAD NEAR JALARAM MANDIR Thousand Three Hundred Only
CHOWK AT BALASINOR.
2 CONSTRUCTION WORK OF C.C. ROAD AT JOINT ROAD OF 496000.00 Rupees Four Lakh(s) Ninety Six
AMBEDKAR BHAVAN ROAD TO BHARATBHAI RAMUBHAI HOUSE Thousand Only
(NAVA PLOT VISTAR) AT BALASINOR.
3 CONSTRUCTION WORK OF C.C. ROAD AND DRAINAGE LINE(SEWER 504400.00 Rupees Five Lakh(s) Four Thousand
LINE)FROM JOINT ROAD OF PARSHOTTAM BHUVAN HOUSE TO Four Hundred Only
ARVINDBHAI MUDJIBHAI TALATI HOUSE (NAVA PLOT VISTAR) AT
Total Rs, 2331700.00 Rupees Twenty Three Lakh(s) Thirty One
Thousand Seven Hundred Only
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in figure and in words) of the estimated rates
mentioned above. Amount of my/our tender works out as under.
( In words ) _________________________ percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender Rs.
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
*( Please strike out whichever is not applicable)
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of Division or as directed.
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and hold good for work under.
Note : 3 I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Chief Officer
Balasinor Nagarpalika
SBD SECTION-7 BILL OF QUANTITIES-
BALASINOR MUNICIPALITY, BALASINOR
ESTIMATE FOR CONSTRUCTION WORK OF PAVER BLOCK PAVING AT KEDARESHWAR MAHADEV DHAL
ROAD NEAR JALARAM MANDIR CHOWK AT BALASINOR.
Qty. Description Total Rate Unit Amount
1 226.00 Box cutting the road surface to proper slope and camber for
Cu.m making a base for road work including removing the excavated
stuff and depositing on the road side slope as deirected up to
m.lead. 109.41 Cu.m
2 1506.50 Providing and fixing pre-cast Rubber Dye/steel Dye inter locking
Sqm. concrete block 60mm thick with grade of concrete M30
pneumatic compressed/vibrated mechanically and as per
approved design Confirming to IS 15658 : 2006 including 35 mm
Sand layer for levelling and filling the joint with sand in proper
line and level as per guidlines of IRC : SP 63-2018 etc.
Complete. 706.77 Sqm.
3 242.00 Providing cement vata (10cm x 10cm size) quarter round in
Rmt. cement mortar 1:1 including neat cement finishing watering etc.
complete. 24.28 Rmt.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-160
BALASINOR MUNICIPALITY, BALASINOR
ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD AT JOINT ROAD OF AMBEDKAR BHAVAN ROAD TO
BHARATBHAI RAMUBHAI HOUSE (NAVA PLOT VISTAR) AT BALASINOR.
Qty. Description Total Rate Unit Amount
1 178.50 Box cutting the road surface to proper slope and camber for
Cu.m making a base for road work including removing the excavated
stuff and depositing on the road side slope as deirected up to
m. lead. 109.41 Cu.m
2 61.50 Providing and laying compacted B.T. Metalling (45 to 63 mm size)
Cu.m using Stone screening 13.2 mm of 0.16 Cmt./10 Smt. and
Cmt./10 Smt., Stone Dust including spreading in uniform layer,
watering and consolidation by vibratory roller achived the desired
density, as per clause. 404 of M.O.R.T. & H. specification etc.
3 61.50 Providing and laying cement concrete work M-200 1:1.5:3 (1
Cu.m Cement : 1.5 coarse sand : 3 graded stone aggregates 20mm
nominal size) and curing complete exculding cost of form work and
reinforcement for reinforced concrete work in. (A) Foundations,
footings, base or columns and mass concrete.
4 510.00 Labour charges for concreting with vacume dewatering Technique
Sqm. (Trimix or equivalent type) including loading, unloading, carting,
companing complete with "C" channelas as per requirement and
labour charges on directed by Engineer-in-charge.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-161
BALASINOR MUNICIPALITY, BALASINOR
ESTIMATE FOR CONSTRUCTION WORK OF C.C. ROAD AND DRAINAGE LINE(SEWER LINE)FROM JOINT ROAD
OF PARSHOTTAM BHUVAN HOUSE TO ARVINDBHAI MUDJIBHAI TALATI HOUSE (NAVA PLOT VISTAR) AT
Qty. Description Total Rate Unit Amount
1 135.00 Box cutting the road surface to proper slope and camber for
Cu.m making a base for road work including removing the excavated
stuff and depositing on the road side slope as deirected up to 50 m.
lead. 109.41 Cu.m
2 36.00 Providing and laying compacted B.T. Metalling (45 to 63 mm size)
Cu.m using Stone screening 13.2 mm of 0.16 Cmt./10 Smt. and
Cmt./10 Smt., Stone Dust including spreading in uniform layer,
watering and consolidation by vibratory roller achived the desired
density, as per clause. 404 of M.O.R.T. & H. specification etc.
complete. 1305.09 Cu.m
3 36.00 Providing and laying cement concrete work M-200 1:1.5:3 (1
Cu.m Cement : 1.5 coarse sand : 3 graded stone aggregates 20mm
nominal size) and curing complete exculding cost of form work and
reinforcement for reinforced concrete work in. (A) Foundations,
footings, base or columns and mass concrete.
4 300.00 Labour charges for concreting with vacume dewatering Technique
Sqm. (Trimix or equivalent type) including loading, unloading, carting,
companing complete with "C" channelas as per requirement and
labour charges on directed by Engineer-in-charge.
5 117.00 Excavation for foundation upto 1.5 m depth including sorting out
Cu.m and stacking of useful materials and disposing off the excavated
stuff upto 50 Meter lead.(A) Loose or soft soil
6 114.50 Filling available excavated earth (excluding rock) in trenches.
Cu.m plinth, sides of foundations etc. in layers not exceeding 20 cm. in
depth consolidating each disposited layer by ramming and
SBD SECTION-7 BILL OF QUANTITIES-162
7 80.00 Providing and supplying ISI Standard R.C.C. pipes(of Sulphate
Rmt. Resisting Cement) in standard lengths of following class and
diameter suitable for either collar joints or rubber ring joints
including all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. Note : One collar should be
supplied with each full length plain ended RCC pipe, cost included
in rates below. One rubber ring should be supplied with each full
length socketed pipe, cost included in rates below.
Class NP3 Test Pressure 0.7 Kg/sq.cm 421.17 Rmt.
200 mm Dia Pipe
8 80.00 Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2
Rmt. of following diameters in proper position, grade and alignment
at all level as directed by Engineer-in-charge including
conveyance from stores to site of work, labour, giving hydraulic
testing as per ISI code. 88.88 Rmt.
9 2.00 Constructing Manhole with R.C.C. top slab in 1:2:4 mix (1-cement
Each. :2-coarse sand : 4-graded stone aggregate 20mm nominal size)
foundation concrete 1:3:6 mix (1-cement : 3- coarse sand :6-Brick
bats 40 + 50mm size) inside plastering 15mm thick with Cement
Mortar 1:3 (1-Cement : 3-coarse sand) finished with a floating coat
of neat cement and making channels in cement concrete 1:2:4 mix
(1-Cement :2-Coarse sand :4-stone aggregate 20mm nominal size)
finished smooth complete including curing and festing (i) Inside
size 900mm x 1200mm and 1.5M. deep including C.I. cover with
frame size 560mm diameter total weight of cover and frame to be
not less than 128 kgs. (Wt. of cover 64 Kg. and Wt. of frame
Kg.)(A) With 230mm thick walls of brick msonry using brick having
crushing strength not less than 35Kg./ Sq.cm. in Cement Mortar 1:5
(1- Cement: 5-Coarse sand) (2) B type depth 1.50 Metre for
200mm diameter sewer.
10 RCC precast M.H. Frame & Cover : RCC precast M.H. Frame &
cover Manufacture, supply & Delivery at store or at site of work
precast RCC M.200 Frame & cover suitable to drainage M.H. and
as per type design & Drawing including cost of rainforcement M.S.
angles or Flat, cutting mold work etc.
House connection chamber Light Duty
5.00 Frame 813.00 Each.
5.00 Cover 920.00 Each.
SBD SECTION-7 BILL OF QUANTITIES-163
11 5.00 Chamber for House Connection : providing and constructing
Each. rectangular brick masonry chamber for house connection as per
type design in brick masonry in C.M. 1:3 including M-100 in
foundation M-150 in benching inside plastering in C. M. 1:3 coping
in M200 and fixing RCC precast manhole frame and covers, but
Excl, supply of manhole and cover etc. complete excl. excavation.
Add :- 2% of Contingency Charges Rs.
Add :- 1% of Qaulity Controll Rs.
SBD SECTION-7 BILL OF QUANTITIES-164
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
SBD.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Download all tender documents and submit your bid