Superintending Engineer and Project Director PIU-I
Office of the Superintending Engineer and Project Director Project Implementation Unit - I,P.W. (Roads) Directorate, 3No. Commissariat Road Hastings Kolkata-700022.
Sagardighi Monigram Gankar Raghunathganj Rd from 0.00 to 20.00 Km, Widening and Strengthening work and from 20.00 to 25.00 km, Strengthening work including Const. of 25 nos. of CD Structures under Murshidabad Hwy Div No. I in the dist of Murshidabad.
2026_WBPWD_5019221_1
WBPWD/PW(R)/SEPD/PIU-I/NIT-06 OF 2026-2027
Open Tender
CIVIL WORKS
Percentage
480 days
Sagardighi, WB
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.8 Cr
Yes
Project Implementation Unit - I, P.W.(Roads) Direc
19 Aug 2026
19 Aug 2026
14 Sept 2026
20 Aug 2026
12 Sept 2026
28 Aug 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PAVEMENT WORKS:- | |||||
| 1.01 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Reference to MoRT&H's specification clause 201)
By Mechanical Means
In area of light jungle | - | Hec. | 49,712.71 | - |
| 1.02 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed.
By mechanical means (without milling machine) :
From 50 mm to 100 mm thick. | 1,36,345 | Sq.m | 7.58 | ₹10,33,495.1 |
| 1.03 | Labour for picking up existing metalled road surface to a specified average depth, including screening and stacking the pavement materials.
For average depth above 75 mm but not exceeding 150 mm by manual means:
For Stone-metal surface. | 4,950 | Sq.m | 25.76 | ₹1,27,512 |
| 1.04 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
Depth upto 150 mm | 81,540 | Sq.m | 14.54 | ₹11,85,591.6 |
| 1.05 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
For each additional depth of 150 mm and part thereof. | 1,67,260 | Sq.m | 19.19 | ₹32,09,719.4 |
| 1.06 | Supplying, spreading and consolidating an uniform and homogeneous mixture of Stone Dust and Medium Sand (mixed in proportion of 3 : 1 by volume and by any approved method as per direction of Engineer-in- Charge) to the required thickness in layers at 97% Proctor Density (not less than 1.7 gm/cc) with power roller to proper gradient and camber, including watering as necessary, lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary complete as per Specification including all incidental charges of roller, cost of fuel & lubricants.
(The payment is to be made on the basis of the
finished compacted volume of mixture of stone dust and sand.) | 4,473.89 | Cu.m | 1,629.19 | ₹72,88,816.85 |
| 1.07 | Granular Sub-Base with Graded Material
Plant Mix Method
Construction of granular sub-base byproviding graded material such as natural sand/crushed gravel/crushedstone/combination depending uponthe required grading spreading inuniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller toachieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8),complete as per clause 401
Granular Sub-base (Grading - II) with Rampurhat variety stone material.
(Payment will be made on the basis of finished compacted volume) | 4,274.74 | Cu.m | 2,198.45 | ₹93,97,802.15 |
| 1.08 | Construction of Embankment with Material Deposited from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation
of other structures graded and compacted to meet requirement of table 300-2 & 300-1.The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
Earth cutting is done by dozer and pushed for filling in the embankment. | 27,431.2 | Cu.m | 56.12 | ₹15,39,438.94 |
| 1.09 | Granular Sub-Base with Graded Material
Plant Mix Method
Construction of granular sub-base byproviding graded material such as natural sand/crushed gravel/crushedstone/combination depending uponthe required grading spreading inuniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller toachieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8),complete as per clause 401
Granular Sub-base (Grading - III) with Rampurhat variety stone material.
(Payment will be made on the basis of finished compacted volume) | 4,952.99 | Cu.m | 2,512.09 | ₹1,24,42,356.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.02 MB
BOQ_5091228.xls
BOQ • 0.44 MB
FORM2911ii_Supervision_Consultant.pdf
Tender Documents • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].