| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹786.90Accepted-AOC | ₹786.90 | L1 | Accepted-AOC Bid is responsive |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹9.7 Cr
EMD Value
₹19.4 L
Closing Date
24 Jul 2020, 1:00 pmClosed
CE URRDA
Ist floor in Directorate of panchayati raj opposite IT Park, Shastradahra Road Dehradun, Uttarakhand
UT-05-10 Maldevta-Serki-Silla to Bheswar MR Stage-II
2020_CCUK_95493_1
UT0510
National Competitive Bid
Civil Works - Roads
Item Rate
365 days
DEHRADUN
Please refer Technical bid
4 documents required · 4 mandatory
₹5,000
URRDA
₹19.4 L
MUSSOORIE
10 Nov 2020
26 Jun 2020
24 Jul 2020
26 Jun 2020
24 Jul 2020
29 Jun 2020
29 Jun 2020
Amount
EARTH WORK
Earth work in hill road (hill side cutting/filling):- Excavation in hilly area for construction of road in all types of soils & rocks with E&B and BLB as met at site true to lines as per plan, X section, L section camber, super elevation as required also including uprooting & cutting of bushes dressing of road surface to the required level and slopes with all lead, lifts and safe disposal of surplus excavated material at suitable dumping places by mechanical means/ manual means indicated in the drawing with out damaging forest and forest land including slip clearance during hill side cutting as directed by Engineer-in-charge.
Excavation in soil in Hilly Area by mechanical means without using dozer, including cutting and trimming of side slopes and disposing of excavated earth witha lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1
Excavation in hilly area in ordinary rock not requiring blasting by mechanical means without using dozer, including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.
Excavation in hilly areas in hard rock requiring blasting, by mechanical means (not cu.musing dozer) , including lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2
Excavation in Cutting in all type of Soil and rock by manual means with lead up to 50 M for carrying of cut earth to embankment ( Half cut and half fill ) as directed by Engineer-in-charge and MORD specifications for Rural Roads 2014. (For Superelevation)
Construction of Embankment with material obtained from Roadway Cutting/with approved materials deposited at site from roadway as directed by Engineer-in-charge and MORD specifications for Rural Roads 2014 (Filling/Patri Filling)
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90
Providing edge stones RCC grade M 15 (500 mm x 120 mm x 100 mm) on valley side of formation as per drawing .
Prepration of Subgrade loosening of the ground upto a level of 300 mm below the subgrade level, watered,graded and compected in layers to meet requirement of tabels 300.1 and 300.2 for subgrade construction as per technical specification clause 303.5.2
PROTECTION WORK
Excavation in foundation for structures in all types of soils and rocks including all lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
Construction of R.R. stone masonary laid dry , supply of all materials, labour,T&P & Royalty etc.required for proper completion of work as directed by Engineer-in-charge MORD Specification for Rural Roads 2014.
Construction of R.R. stone masonary in cement mortar 1:5 including supply of all materials,labour, T&P,Royalty etc required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
HP stone filling in back of structures including supply of all material, labour, T&P, royalty etc. required for proper completion as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
Parapet as per standard drawing attached including supply of all material, labour, T&P etc. required for proper completion of work as per direction of Er I/C.With C.C.Base
i) E/W in excavation in foundation
ii) Cement plum masonry with 40% plum & 60% 1:3:7 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. (As per PWD Uttarakhand specifications)
iii) White washing
Construction Of Pucca Drain
i) E/W in excavation in foundation
RR 1:5 Per Cum
Plaster 1:4
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally)including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each (crate size 3.00m * 1.50m* 1.25m) as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
By mix in place method Constuction of granular sub base by providing Local available material, spreading in uniform layers with motor grader on preraired surface , mixing by mix in place method with rotavator at OMC and compacting with smooth wheel rolar to achieve the desire density, complete as per Technical specification Clause 401.
WBM Grading 2Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.
WBM Grading-3…. Providing, laying, spreading and compacting stone aggregates of specific sizes(53mm to 22.4 mm) to water bound macadam including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screenings to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 of MORD Specification for Rural Roads 2014
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90-1.20 kg/sqm using mechanical means as per Technical Specification Clause 502 of MORD Specification for Rural Roads 2014
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MORD Specification for rural roads 2014
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2
Providing and laying seal coat by Bitumen /Bituminious Emulsion (Tailor made binder) as binder for sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using as per Technical Specification Clause 508 of MORD Specification for Rural Roads 2014. (TYPE-B)
CROSS DRAINAGE WORKS
CAUSEWAY
Excavation in foundation for structures in all types of soils and rocks including all lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Stone/Boulder
Construction of R.R. stone masonary in cement mortar 1:5 including supply of all materials,labour, T&P,Royalty etc required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
Providing and laying of concrete for plain concrete in open foundations for structures including supply of all materials, labour, T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014. P.C.C grade M 10. (Causeway)
Providing and laying of concrete for reinforced concrete for structures including supply of all materials, labour, t&p, shuttering, centering , royalty etc. required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.R.C.C.grade M 25 for cross drainage structures such as Culverts , Bridges etc.(Causeway)
Supplying, cutting , and placing of HYSD bar reinforcement in substructure/superstructure complete (IS1786:2008 clause no. 1.6) Steel shall not be from rerolling plants and shall conform to relevent IS Code including supply of all materials, labour,T&P, royalty etc. required for proper completion of work as directed by Engineer-in-charge as per MORD Specification for Rural Roads 2014
Construction Of Scupper
Excavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203P.C.C grade M 10
Random Rubble Stone Masonry laid in 1:5 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications)
HP stone filling in back of walls including supply of all material, labour, T&P etc. required for proper completion of the work.
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5R.C.C M 25
Supplying, fitting and placing HYSD bar reinforcement in Superstructure complete as per drawing and technical specifications clause 1002, 1010,1202 .(The reinforcment steel shall be procured from original (primary) steel producer as per clause no. 2011.3.1 of MORD specification (Frist Revision 2014) and IS 1786 : 2008 Clause no. 1.6
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M25
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through thefull width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
For Catchpit
Excavation in foundation for structures in all types of soils and rocks including all lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
Construction of R.R. stone masonary in cement mortar 1:5 , supply of all materials, labour,T&P & Royalty etc.required for proper completion of work as directed by Engineer-in-charge MORD Specification for Rural Roads 2014.
Construction of R.R. stone masonary Laid Dry including supply of all materials,labour, T&P,Royalty etc required for proper completion of work as directed by Engineer-in-charge and MORD Specification for Rural Roads 2014.
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
ROAD FURNITURE
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per standard drawing duly painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
Providing & fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per IRC/ MORD Specification for Rural Roads 2014.
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per standard drawing dully painted and written as directed by Engineer in charge/ as per MORD Specification for Rural Roads 2014.
Emergency Maintenance
Major Slip Clearance in all Type of Soil ,rock and boulders including cost of all material , machine,T&p etc required for proper compeletion of work as per mord specification of work 1611
Ist Year
Iind Year
IIIrd Year
Ivth Year
Vth Year
Deploying Hydraulic excavator of 0.90cum bucket for clearence of Major slip in all type of soil rock and boulders including its operator ,pol, and all other charges required for proper compeletion of work
Ist Year
Iind Year
IIIrd Year
Ivth Year
Vth Year
Providing and laying of boulder apron laid in wire crate with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and techniacal specification 1301
Ist Year
Iind Year
IIIrd Year
Ivth Year
Vth Year
Coolie Walling including supply of all material, labour, T&P,royalty etc. required for proper completion of the work,as directed by Engineer-in-charge and as per PWD specifications 8.90 (For opening communication only)
Ist Year
Iind Year
IIIrd Year
Ivth Year
Vth Year
Maintainance Activities:
Maintenance under PBMC for 1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907. 3]Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 . 4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. 5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910. 7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912. 8} Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year). 9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.
Ist Year
Iind Year
IIIrd Year
Ivth Year
Vth Year
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .