Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H-1₹39.3 LAccepted-Finance | H-1 | Accepted-Finance Being H-1 | |
| 2 | H-2₹41.0 L+₹1.8 L (4.48%)Accepted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD GURGAON 122005 | GURGAON | GURGAON | HARYANA | 122005 | H-2 | Accepted-Finance Being H-2 | |
| 3 | H-3₹38.3 L−₹96,600 (2.46%)Accepted-Finance 115 116 GANESH NAGAR HOSHANGABAD ROAD BHOPAL M P 462026 IN | BHOPAL | BHOPAL | MADHYA PRADESH | 462026 | H-3 | Accepted-Finance Being H-3 | |
| 4 | H-4₹1.5 Cr+₹1.1 Cr (281.8%)Accepted-Finance | H-4 | Accepted-Finance Being H-4 | |
| 5 | H-5₹2.2 Cr+₹1.8 Cr (465.9%)Accepted-Finance | H-5 | Accepted-Finance Being H-5 |
Tender Value
Refer Docs
Closing Date
23 May 2024, 3:00 pmClosed
Regional Officer MoRTH Chandigarh
Regional Office MoRTH Kendriya Sadan Sector 9A Chandigarh 160009
Consultancy Services for Preparation of Detailed Project Report for 4 Lane Bypasses to Villages (i) Lahli (ii) Singhani (iii) Kharak (iv) Bamla on NH-709E in Bhiwani Distt and Bypass to Tohana Town on NH-148B in Fatehabad District in the Haryana
2024_MoRTH_803368_1
RW/CH/HR/DPR/2023-24/02
Open Tender
Consultancy
EPC Contract
300 days
Haryana
As per tender documents.
3 documents required · 3 mandatory
₹5,000
RPAO
Exempted
Regional Office MoRTH Chandigarh
5 Jul 2024
8 Apr 2024
24 May 2024
8 Apr 2024
23 May 2024
7 May 2024
8 Apr 2024 - 3 May 2024
3 May 2024
Amount
I. Remuneration for Local Staff (Including per diem allowance) Professional Staff:
Team Leader cum Highway Engineer
Bridge Engineer
Highway Engineer
Meterial Engineer cum Geotechnical Engineer
Survey Engineer
Traffic/Road Signage/Marking and Safety Expert
Environmental Specialist
Quantity Surveyor
Land Acquistion Expert
Utility Expert
SUB-TOTAL-1
SUB-PROFESSIONAL STAFF :
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Professional-7
SUB-TOTAL-2
Total (Sub Total 1 + Sub Total 2):
Note: For proper assessment of utility estimates and proper drainage system provisions, DPR consultant shall also engage an utility expert and drainage expert at sub-professional level, with relevant technical expertise in respective fields.
II. SUPPORT STAFF
Office Manager
Typist
Office Boy
Night Watchmen
Total:
III. Transportation (Fixed Costs) Rate/Month
The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Total:
IV. Duty Travel to Site (Fixed Costs): Note: Rate quoted includes Hotel charges, travel cost etc. complete.
Duty Travel to Site (LS)
Total:
V. Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month)
Office Rent (Fixed Costs)
Total:
VI. OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) Rate/Month
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Total:
VII. OFFICE FURNITURE AND EQUIPMENT (Rental)
Office Furniture and Ecquipment (LS)
Total:
VIII. REPORTS & DOCUMENTS PRINTING (Rate per Copy)
Monthly report (3 copies per Month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with LA Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment Report & RAP
Final Environmental Assessment Report and RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP.
Final Bidding Documents
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
LA & Clearances II Report
Total:
Note: In case of splitting of the project in packages after alignment is finalized, the additional payment in respect of reports and document printing shall be made on prorate basis of accepted financial proposal according to additional number of documents submitted, as mentioned above
IX.Survey and Investigation: A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile / aerial LiDAR or better Technology
B. Investigation (Fixed Cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffice Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other Investigations/Surveys
*Sub-Soil Investigation (Boring)
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Total:
Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities.
C. Network Survey and GPR
Network Survey of the existing Highways as a repository for civil works as per directions from Authority.
GPR Survey for detection of under ground utilities
Total:
X. Cost of Supply and Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Total:
XI. Land Acquisition Team including support staff and logistics/ transportation. [A.] Land Acquisition Team including support staff :
Ex-Land Revenue Inspector/ Officer or equivalent (1x8)
Ex-Kanoogo/Girdwar or equivalent (1x8)
Ex-Patwari or Equivalent (1x8)
Typist (2x8)
Peon (1x8)
Number of Land acquisition Teams (One Only)
Sub-Total [A]:
B. Logistics for Land Acquisition Team
Computer including necessary peripherals (2x8)
Printers (2x8)
Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km (1x8)
Number of Land acquisition Teams (One Only)
Sub-Total [B]:
Total (Sub Total [A] + Sub Total [B]):
Note: (i) The consultant shall provide one land acquisition expert along with allied team and supporting logistic as envisaged in clause 5.1.5.1 of TOR for each 100 km stretches proposed for DPR preparation or part thereof subject to the condition that such 100 km length shall not stretch beyond two adjoining districts (For example total length of package is 343 km, there will be four team).
Estimate of costs for Expatriate consultants (in Indian Rupees) I. REMUNERATION OF EXPATRIATE STAFF including per diem allowances.
Staff
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Total-I:
II. Mobiliation and Demobilization
A. International Airfares (Fixed costs)
B. Inland Travel in Home Country (Fixed costs)
C. Other Missc expenses (like DA, internal travel expenses other incidentals)
SUB-Total-II:
Total(Sub Total-I + Sub Total-II):
Total Cost Net of Goods and Service Tax: **Total cost net of Goods and Service Tax shall be considered for Financial Evaluation. Note: Payment will be made as per stipulations of the conditions of conntract.
Goods and service Tax
TOTAL COSTS (Including GST)
PIONEER INRA CONSULTANTS PVT. LTD.
MSV INTERNATIONAL INC
Theme Engineering Services Pvt Ltd
Holtec Consulting Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .