Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.7 L+₹3.2 L (22.5%)Rejected-AOC 1 ST FLOOR KUBERA CHAMBERS J M ROAD SHIVAJINAGAR PUNE PUNE MAHARASHTRA 411005 | PUNE | MAHARASHTRA | 411005 | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical FOURTH FLOOR CAPITAL LEGEND BUILDING KORAPPATH LANE ROUND NORTH THRISSUR THRISSUR KERALA 680020 | THRISSUR | KERALA | 680020 | - | Rejected-Technical Submitted certificate for proving the experiance does not meet the prequalification criteria. |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
4 Nov 2022, 12:00 pmClosed
Chief Executive Officer
Park Centre, Technopark Phase-1 Campus, Karyavattom P.O. - 695581
Selecting an Agency/Contractor for Conducting the Annual Energy Audit and Quarterly Energy Accounting of Technopark Campuses.
2022_ETPK_515967_1
ETPK/PH-1/2022-23/E-11
Open Tender
Electrical Works
Item Rate
730 days
Technopark Campuses
Refer Tender Document.
3 documents required · 3 mandatory
₹2,950
₹50,000
Park Centre, Technopark Phase-1 Campus
4 Jan 2023
13 Oct 2022
7 Nov 2022
13 Oct 2022
4 Nov 2022
18 Oct 2022
18 Oct 2022
Amount
For Ganga-Yamuna Building in Phase-3, Phase-V campus SEZ Areas - (Excluding GST)
Conducting and Submission of annual report as per BEE Regulation (Manner and Intervals for Conduct of Energy Audit in electricity distribution companies) Regulations, 2021 and Testing of Energy Metering system installed in Technopark Campuses as per the provision of KSERC supply code 2014 and as per the terms and conditions mentioned in the tender document ETPK/PH-3/2022-23/E-11
First year
Second year
Conducting and Submission of Quarterly report as per BEE Regulation (Manner and Intervals for Conduct of Energy Audit in electricity distribution companies) Regulations, 2021 and as per the terms and conditions mentioned in the tender document ETPK/PH-3/2022-23/E-11
First year
Second year
For Phase1 campus, 110kV Substation in Phase3 campus, Kabani Building and 110kV substation in Phase4 campus Non-SEZ Areas - (Including GST)
Conducting and Submission of annual report as per BEE Regulation (Manner and Intervals for Conduct of Energy Audit in electricity distribution companies) Regulations, 2021 and Testing of Energy Metering system installed in Technopark Campuses as per the provision of KSERC supply code 2014 and as per the terms and conditions mentioned in the tender document ETPK/PH-3/2022-23/E-11
First year
Second year
Conducting and Submission of Quarterly report as per BEE Regulation (Manner and Intervals for Conduct of Energy Audit in electricity distribution companies) Regulations, 2021 and as per the terms and conditions mentioned in the tender document ETPK/PH-3/2022-23/E-11
First year
Second year
MITCON Consultancy and Engi8neering Services Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .