| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Finance | -27.61% | ₹4.1 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 L+₹10,745.67 (2.60%)Admitted-Finance | -25.73% | ₹4.2 L+₹10,745.67 (2.60%) | L2 | Admitted-Finance |
| 3 | L3₹4.3 L+₹11,431.57 (2.76%)Admitted-Finance | -25.61% | ₹4.3 L+₹11,431.57 (2.76%) | L3 | Admitted-Finance |
| 4 | L4₹4.7 L+₹60,015.72 (14.5%)Admitted-Finance MASTER PARA TELIAMURA KHOWAI TRIPURA | KHOWAI | KHOWAI | TRIPURA | 799205 | -17.11% | ₹4.7 L+₹60,015.72 (14.5%) | L4 | Admitted-Finance |
| 5 | L5₹4.8 L+₹63,388.03 (15.3%)Admitted-Finance | -16.52% | ₹4.8 L+₹63,388.03 (15.3%) | L5 | Admitted-Finance |
Tender Value
₹5.7 L
EMD Value
₹11,432
Closing Date
12 Aug 2026, 3:00 pmClosed
Executive Engineer(Fy)
Directorate of Fisheries, P N Complex, Agartala
Maintenance of IMC Hatchery at Avanga FSC along with Construction of wash room at Avanga FSC under S.F. Kamalpur, Dhalai Tripura District
2026_FISH_75355_1
DNIT No.EE(FY)/2026-27/28
Open Tender
Civil Works
Percentage
90 days
Kamalpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹11,432
1 Sept 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
-All kinds of soil . | 19.3 | cum | 179.9 | ₹3,472.07 |
| 1.02 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 3.36 | cum | 1,777.3 | ₹5,971.73 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:
1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 4.72 | cum | 11,355.7 | ₹53,598.9 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement
-All work upto plinth level:
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 3.43 | cum | 12,073.8 | ₹41,413.13 |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 0.9 | cum | 13,305.8 | ₹11,975.22 |
| 1.06 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 2.19 | cum | 13,584.5 | ₹29,750.06 |
| 1.07 | Reinforced cement concrete work in arches, archribs, domes, vaults, shells, folded plate and roofs having slope more than 15° up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) . | 1.19 | cum | 13,988.2 | ₹16,645.96 |
| 1.08 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement Lintels, beams, plinth beams, girders, bressumers and cantilevers with shuttering ply. | 13.2 | sqm | 499.4 | ₹6,592.08 |
| 1.09 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply | 14.1 | sqm | 625.5 | ₹8,819.55 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.23 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
TRI_FISH_SBD_DNIT_26_2026_28.pdf
Tender Documents • 4.20 MB
BOQ_76707.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .