| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.0 LAccepted-AOC 22 1685 ST JACOB CHURCH LANE PAMBAIMOOLA EDACOCHIN ERNAKULAM KERALA 682010 | ERNAKULAM | ERNAKULAM | KERALA | 682010 | L1 | Accepted-AOC L1 | |
| 2 | L2₹47.1 L+₹4.5 L (10.6%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹48.7 L+₹6.1 L (14.4%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹58.7 L+₹16.0 L (37.6%)Rejected-AOC MUKALATH VALAYANCHIRANGARA PO PERUMBAVOOR ERNAKULAM KOCHI 683556 | PERUMBAVOOR | ERNAKULAM | KERALA | 683556 | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | ZOOM ENTERPRISES L1 | Kuriako Mathai and company L4 | M/S AARJAY ASSOCIATES L3 | AVM CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for providing and fixing steel tube scaffolding on exterior of the OHT structure upto the top level of water tank made with 40mm dia MS tube ,MS clamps incl working platform and arrangement for inspection and mentain it in a workable conditon for execution of the work for grouting,microconcreting etc and removing the completion of the required works as instructed by Engr-in-Charge. The payment shall be made for elevational area and no extra payment shall be made for areas of scaffolding inside the tank ,additional support etc.
Note : Necessary safety measures for the workman shall be incorporated by contractors during the complete work for OHT of height 15 mtr to 21 mtr | 1,100 | Sqm | 500 ₹5,50,000 | 357 ₹3,92,700 | 280 ₹3,08,000 | 230 ₹2,53,000 Lowest |
| 2.00 | Material and labour for Drilling and installing the 12 mm dia holes upto 100 mm depth @300mm centre to centre on the leakage portion of OHT clean the holes with compressed air and a spiral brush to free them from drill dust and fixing GI packer of 10 mm dia OD ( sustain pressure up to 10 Kg/cm2) in 12 mm dia holes. Grouting with 1 K High-performance polyurethane injecting chemical of CERACHEM or equivalent product of PIDILITE/Dr FIXIT/FOSROC having a minimum pot life of 15 minutes at Maximum expansion of 2,700 %( Ratio 10; 1Resin water). It shall achieve a minimum tensile shear strength 4 /Nmm2 . | 250 | Each | 200 ₹50,000 Lowest | 3,100 ₹7,75,000 | 2,625 ₹6,56,250 | 2,300 ₹5,75,000 |
| 3.00 | Material and labour for chipping of concrete and cleaning the surface throughly in a dry manner , removing all loose and foreign materials to ensure proper bonding between the old and new concrete surfaces during jacketing and strengthning works , chip of of the conctere behind corroded reinforcement as required to allow proper cleaning and treatment of the steel. | 450 | Sqm | 400 ₹1,80,000 Lowest | 950 ₹4,27,500 | 815 ₹3,66,750 | 680 ₹3,06,000 |
| 4.00 | Material and labour for applying rust remover of reputed brand CERACHEM/PIDILITE/Dr FIXIT/FOSROC on the corroded reinforcement and apply anti corrosive epoxy primer CERA ZINC ZR of CERACHEM or equivalent product of PIDILITE/Dr FIXIT/FOSROC over cleaned reinforcement after removing all the rust. The primer shall be brush applied to the exposed re-barsand new bars in two coats and allowed to fully dry. | 100 | RM | 200 ₹20,000 Lowest | 510 ₹51,000 | 435 ₹43,500 | 400 ₹40,000 |
| 5.00 | Material and labour for drilling 18/14 mm hole upto a depth of 150 mm maximum for fixing 16/12 mm main reinforcement and 10mm dia holes for fixing 8mm dia shear connectors/Stirupps @ 300mm c/c on the sides. Clean the drill holes using water and make sure that there is no fine particals present in the hole. Mix the base and hardener of polyester resin grout CERA ANCHOREST of CERACHEM or equivalent product of PIDILITE//Dr FIXIT/FOSROC complete all as specified and as directed | 120 | Each | 200 ₹24,000 Lowest | 420 ₹50,400 | 280 ₹33,600 | 520 ₹62,400 |
| 6.00 | Material and labour for Providing and applying two component epoxy resin bonding agent CERA BOND EP of CERACHEM or equivalent product of PIDILITE/Dr FIXIT/FOSROC to the prepared concrete surface and allowed to achieve tacky condition. | 45 | Sqm | 1,200 ₹54,000 | 1,150 ₹51,750 | 1,015 ₹45,675 | 810 ₹36,450 Lowest |
| 7.00 | Material and labour for providing leak proof shuttering for the structures where repair required. The form work shall be with marine plywood and cleanly coated with mould relesing agent of reputed brands like CERACHEM/PIDILITE/Dr FIXIT or equilivalent brandsfor attaining a neat finishing of the concrete | 45 | Sqm | 600 ₹27,000 Lowest | 2,870 ₹1,29,150 | 2,650 ₹1,19,250 | 2,400 ₹1,08,000 |
| 8.00 | Material and labour for providing free flow, non-shrink, self compacting MICRO CONCRETE of reputed brands like CERACHEM/PIDILITE/Dr FIXIT/FOSROC to a thickness of 70mm. Mixing shall be done in a mixer machine with 6mm down aggregates(25%- 50% of the weight of microconcrete) and water 0.125 to 0.130 ml per kg shall be added. The mixed material should be placed immediately to positioned form work continuously without gap complete all as specified.
Note: The volume of micro concrete will be calculated as 2200Kg/Cum | 2.8 | Cum | 16,000 ₹44,800 Lowest | 1,26,500 ₹3,54,200 | 1,10,000 ₹3,08,000 | 95,000 ₹2,66,000 |
| 9.00 | Material and labour for chiping of damage concrete and providing fiber reinforced cementitious mortar CERA FIBER CRETE of CERACHIM or equivalent product of PIDILITE/Dr FIXIT/FOSROC after fixing 3mm gauge GI wire mesh as additional reinforcement on all the spalled areas. Complete all as specified and as directed | 30 | Sqm | 1,200 ₹36,000 Lowest | 3,000 ₹90,000 | 2,700 ₹81,000 | 2,000 ₹60,000 |
| 10.00 | Material and labour for applying curing compound immediately after the completion of the repair works, the surface should be sprayed with curing compound with reputed brands like CERA CHEM/PIDILITE/Dr FIXID or equilivalent brands. | 75 | Sqm | 200 ₹15,000 | 200 ₹15,000 | 175 ₹13,125 Lowest | 210 ₹15,750 |
Tender Value
Refer Docs
EMD Value
₹96,340
Closing Date
20 Mar 2026, 6:00 pmClosed
GE NS KOCHI
Military Engineer Services Garrison Engineer (Naval Services) Kataribagh, Naval Base Post Kochi 682004.
SPECIAL REPAIRS TO P-165 P-98 OVER HEAD TANKS (OHT) AT NAD AND PARIYAR VIHAR AT NAD ALWAYE
2026_MES_754504_1
8625/E8
Open Tender
Civil Works
Item Rate
120 days
ALWAYE
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE NS KOCHI
₹96,340
Yes
1 Aug 2026
27 Feb 2026
23 Mar 2026
27 Feb 2026
20 Mar 2026
14 Mar 2026
27 Feb 2026 - 28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drilling and installing the 12 mm dia holes about 100 mm on the concrete beam/slab. Cleaning the holes with compressed air and a spiral brush to free them from drill dust and fixing GI packer of 10 mm dia OD (to sustain pressure up to 10 Kg/cm2) in 12 mm dia holes. Grouting with 1 K high-performance polyurethane grout – CERA Inject SS shall have a minimum pot life of 15 minutes at maximum expansion of 2,700 %( Ratio 10; 1Resin water). It shall achieve a minimum tensile shear strength 4 /Nmm2 incl scaffolding upto 20mtr height complete all as specified and directed | 250 | Nos | - | - |
| 2 | Material and labour for equipment hires and supervision charges for excavating earthwork for foundation strengthening works complete all as specified and directed | 15 | Cum | - | - |
| 3 | Material and labour for equipment hires and supervision charges for chipping & grinding the surface to remove cover. Clean the surface with vacuum and make sure that surface is clean and free from loose particles, dust algae and moss upto 20mtr height complete all as specified and directed | 30 | Sqm | - | - |
| 4 | Material and labour for equipment hires and supervision charges for applying CERA RUST REMOVER on the corroded reinforcement and apply anti corrosive epoxy primer CERA ZINC ZR on the reinforcement. The primer shall be brush applied to the exposed rebars all around in two coats and allowed to fully dry incl scaffolding upto 20mtr height complete all as specified and directed | 30 | Rm | - | - |
| 5 | Material and labour for equipment hires and supervision charges for drilling 18 mm hole upto a depth of 150 mm maximum for fixing 16 mm main reinforcement and 10mm dia holes up to a depth of 100 mm maximum for fixing 8mm dia shear connectors/stirupps at every 300mm c/c on the sides and bottom for column and drilling 14 mm holea upto a depth of 120 mm maximum for fixing 12mm main reinforcement and 10mm dia holes up to a depth of 100 mm maximum for fixing 8mm dia shear connectors/stirupps at every 300mm c/c on the sides and bottom for column clean the drilled holes using water and make sure that there is no fine particle present in the hole. Mix the base and hardener of polyester resin grout (CERA ANCHORSET) with the spatula thoroughly and apply inside the holes incl scaffolding upto 20mtr height complete all as specified and directed | 120 | Nos | - | - |
| 6 | Material and labour for equipment hires and supervision charges for cutting and bending of rebars 10mm TMT bar and over for stirrups and main reinforcement to the required length with proper development length. Fix them to prefixed shear connectors so that additional rebar acts monolithic with the existing ones and core concrete. Tie them properly so that it has the tight contact with the main bars incl scaffolding upto 20mtr height complete all as specified and directed | 230 | Kg | - | - |
| 7 | Material and labour for equipment hires and supervision charges for providing epoxy bonding agent CERA BOND EP over the prepared concrete surface and allowed to achieve tacky condition incl scaffolding upto 20mtr height complete all as specified and directed | 30 | Sqm | - | - |
| 8 | Material and labour for equipment hires and supervision charges for providing leak proof shuttering for the beam. The form work shall be with marine plywood and cleanly coated with mould release agent CERA MOULD RELEASE AGENT for attaining a neat finish of the concrete incl scaffolding upto 20mtr height complete all as specified and directed | 30 | Sqm | - | - |
| 9 | Labours, materials for equipment hires and supervision charges for providing free flow, non-shrink, CERA MICRO CONCRETE to a thickness of 50mm.Mixing shall be done in a mixer machine with 6mm down aggregates(25%- 50% of the weight of microconcrete) and water 0.125 to 0.130 ml per kg shall be added. Themixed material should be placed immediately topositioned form work continuously without gap upto 20mtr height complete all as specified and directed
Note:- The volume of micro concrete will be calculated as 2200Kg/Cum | 2 | Cum | - | - |
| 10 | Material and labour for equipment hires and supervision charges for providing fiber reinforced cementitious repair mortar CERA FIBRE CRETE after fixing 3mm gauge GI wire mesh as additional reinforcement on all the spalled areas. (If there is a reduction more than 50% in the dimension of existing reinforcement, steel bars should be given as additional reinforcement which is followed by micro concrete jacketing) incl scaffolding upto 20mtr height complete all as specified and directed | 30 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.49 MB
COMMONPAGES8625.pdf
Tender Documents • 0.54 MB
PS8625.pdf
Tender Documents • 0.99 MB
BOQ_845077.xls
BOQ • 1.82 MB
8625C2.pdf
PDF • 0.18 MB
8625C1.pdf
PDF • 0.18 MB
8625C1.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .