Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | ₹3.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.6 LRejected-AOC | ₹4.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹5.1 LRejected-AOC | ₹5.1 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Jerin J Royees L2 | Royees john L3 | IRFAN MUHAMMED A R L1 |
|---|---|---|---|---|---|---|
| 1.00Civil work | ||||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 2.74 | cum | 4,038 ₹11,056.04 | 4,406.26 ₹12,064.34 | 2,850 ₹7,803.30 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 31.5 | cum | 394 ₹12,411 | 431.66 ₹13,597.29 | 270 ₹8,505 |
| 1.00 | 2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m | 27 | sqm | 182 ₹4,914 | 199.98 ₹5,399.46 | 125.5 ₹3,388.50 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.2 | cum | 8,725 ₹10,470 | 9,519.46 ₹11,423.35 | 5,975 ₹7,170 |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 48 | sqm | 338 ₹16,224 | 370.75 ₹17,796 | 235 ₹11,280 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 12 | sqm | 1,058 ₹12,696 | 1,153.48 ₹13,841.76 | 745 ₹8,940 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.32 | cum | 11,536 ₹1.4 L | 12,586.52 ₹1.6 L | 8,680 ₹1.1 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,232 | kilogram | 122 ₹1.5 L | 134.91 ₹1.7 L | 88.5 ₹1.1 L |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 10 | sqm | 405 ₹4,050 | 443.71 ₹4,437.10 | 289 ₹2,890 |
Tender Value
₹4.2 L
EMD Value
₹10,592
Closing Date
21 Oct 2025, 4:00 pmClosed
Assistant Executive Engineer
PWD Building Subdivision Cherthala
GENERAL-Mini civil station cherthala Construction of septic tank-General Civil Work (05 E Tender)
2025_PWD_809109_1
PWD/BLDG/TR/12613/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Cherthala
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
₹10,592
28 Jan 2026
13 Oct 2025
24 Oct 2025
13 Oct 2025
21 Oct 2025
13 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1349626.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
affidavit.pdf
Other Document • 0.03 MB
BOQ_1349626.xls
BOQ • 0.24 MB
Preliminary_Agreement.pdf
Tender Documents • 0.33 MB
viewsbd.pdf
Tender Documents • 1.63 MB
epay.pdf
Other Document • 0.07 MB
integritypact.pdf
Other Document • 0.01 MB
ft.pdf
Other Document • 0.23 MB
Download all tender documents and submit your bid