Loading…
Loading…
Tender Value
₹19.8 L
EMD Value
₹20,000
Closing Date
15 May 2026, 4:30 pmClosed
Executive Engineer
Canal Cleaning Works from Ch. 85.976 Km to Ch. 90.976 Km of Saurashtra Branch Canal (Package-4)
303428
4 of 2026-27
Open
Civil Works - Canal
Works
Mehsana
6 documents required · 6 mandatory
₹1,062
Executive Engineer, Saurashtra Branch Canal No.1/3, Kadi
₹20,000
8 May 2026
8 May 2026
8 May 2026
15 May 2026
8 May 2026
Charges for canal cleaning work as
per section-5-Technical Specification
for providing, operating and
Item No.- maintaining tractor (40 BHP) with
1 hydraulic trolly (min. 2.5m3 capacity)
(Including fuel, consumable, operator
charges, machinery charges, repairs
charges, Insurance, etc. all complete.)
Charges for canal cleaning work as
per section-5-Technical Specification
for providing, operating and
Item No. maintaining Dumper / Tripper
–2 (Min. 10 Tonne Capacity) (Including
fuel, consumable, operator charges,
machinery charges, repairs charges,
Insurance, etc. all complete.)
Charges for canal cleaning work as
per section-5-Technical Specification
for providing operating and
maintaining Hydraulic Excavator Ex-
Item No.-
200 LC of 0.9 M3 bucket 320 Hrs
capacity(Including fuel, consumable,
operator charges, machinery charges,
repairs charges, Insurance, etc. all
complete.)
Charges for canal cleaning work as
per section-5-Technical Specification
for providing operating and
maintaining JCB 2DX of 0.3 m3
bucket capacity(Including fuel,
consumable, operator charges,
machinery charges, repairs charges,
Insurance, etc. all complete.)
Total Amount
(Excluding GST)
Note for Item No. 3: In the event that a Long Boom attachment is required to be fitted to the Hydraulic
Excavator EX-200 LC for execution of the work, an additional payment of Rs. 500/- (Rupees Five
Hundred Only) per operating hour shall be payable to the Contractor.
Such additional payment shall be subject to adjustment in proportion to the negotiated price for Item No
; 3 against the quoted price
I/We am/are willing to carry out the work at… ....................... %above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out asunder.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) ForItemRateTender (ForaboveINR50Cr.):
Item Description of Item(with Quantity Unit Rate Amount
specificationandreference In In
tobookof figures Words
specifications)
(A)TotalTenderedAmount
(B)Rebateonabovetendered amount (ifany) % (in figure) ……………………………
(C)NetTenderedAmount(A-B) (infigure) …………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer, Quality
Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is a change
as per actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate (i.e. 5234 Rs / MT for OPC) mentioned
in all the tender
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ pkg4.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .