| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical shortfall in the required documents |
| 3 | Rejected-Technical | Rejected-Technical shortfall in the required documents |
| 4 | Rejected-Technical | Rejected-Technical shortfall in the required documents |
Tender Value
₹45.0 L
EMD Value
₹90,000
Closing Date
16 Jan 2024, 3:00 pmClosed
Office of Executive Engineer CMD BHEP Chanderkote
Office of Executive Engineer CMD BHEP Chanderkote
Removal of vegetation from Downstream slope of Dam body including CRG Spillway Glacis, Left Bank of Dam toe and other maintenance works on Downstream face of Dam along with treatment of defective surface due to uprooting of Vegetation on Dam body at
2023_SPDC_240240_1
17 of 2023-24
Open Tender
Civil Works
Item Rate
60 days
BHEP Chanderkote
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
CPAO BHEP
₹90,000
Office of Executive Engineer CMD BHEP Chanderkote
30 Jan 2024
15 Dec 2023
17 Jan 2024
15 Dec 2023
16 Jan 2024
15 Dec 2023
21 Dec 2023
Amount
Removal of vegetation, moss, brushwood etc. with roots from the Entire Dam body (H=140m, L=365m) & left abutment in the downstream side only, upto the length of around 100m with Height=140m, including by whatever means of approach suitable for both workers and work. This work of vegetation removal shall have to be followed by preparation and treatment of patch, from where the vegetation stands uprooted, by way of cleaning the surface against any undesirable and loose material followed by filling the patch/cavity with suitable EPOXY MORTAR over bonding agent or/and surface coating with suitable epoxy compound as per the requirements at site. All complete work to be as one job.
Providing and laying of HIGH PERFORMANCE CONCRETE/MORTAR (>=M50) as per the manufacturer's specifications on anywhere on the Dam face (H=140m, L=365m) including whatever means of approach suitable for both workers and work, preparation of surface like chipping and removal of loose material, applying appropriate epoxy binder / bonding agent/shear bars etc. and coating with epoxy layer(if required as per the design and specifications), all as per the engineering standards & specifications on the inclined/ vertical surfaces as per the requirements at site from toe to top of the dam body for various patch repair works on wet/dry surface.
Providing and fixing 32 mm thick MS plate (or as per Requirement at site) on dam ledge, splitters, glacis or wherever required on dam face including whatever means of approach suitable for both workers and work, preparation of surface like chipping and removal of loose material, making the surface rough and applying appropriate bonding agent/epoxy compound/shear bars/connecting bolts etc. as per the specifications and directions of Engineer-in-charge. All works complete.
Painting of various steel linings on the dam face at glacis, splitters, ledges etc. with appropriate impact resistant epoxy paint including whatever means of approach suitable for both workers and work, preparation of surface like removal and scrapping of loose material, making the surface rough and applying appropriate priming coat as per manufacturer’s specifications and directions of Engineer-in-charge. All works complete.
5. Providing and fixing PVC pipe single socketed, 110 mm dia of standard make having ISI mark with clamps and other fixtures fitted with proper bolts on dam face from Elevation 838.5 masl to 728.40 masl including whatever means of approach suitable for both workers and work as per manufacturer’s specifications and directions of Engineer-in-charge. All works complete.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .