| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 LAccepted-AOC | 1 | Accepted-AOC Accepted Vide Resolution No.1/4 date.19/03/2025 of Mogralputhur GP | |
| 2 | 2₹2.0 L+₹6,476.92 (3.35%)Rejected-AOC | 2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | abdul basheer k t L2 | MUHAMMAD NOWFAL N A L1 |
|---|---|---|---|---|---|
| 1.00Construction of Road | |||||
| 1.00 | 3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 11.4 | cum | 33.56 ₹382.58 | 32.5 ₹370.5 Lowest |
| 1.00 | OD331832/2024-2025:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 33.9 | cum | 4,934.8 ₹1,67,289.72 | 4,778.8 ₹1,62,001.32 Lowest |
| 1.00 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 1.25 | cum | 7,428.77 ₹9,285.96 | 7,193.93 ₹8,992.41 Lowest |
| 1.00 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.09 | tonne | 81,930.02 ₹6,964.05 | 79,340.03 ₹6,743.9 Lowest |
| 1.00 | 3.3:Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 11.4 | cum | 52.2 ₹595.08 | 45.95 ₹523.83 Lowest |
| 1.01 | 3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 35.44 | cum | 433 ₹15,345.52 | 416.31 ₹14,754.03 Lowest |
Tender Value
₹2.1 L
EMD Value
₹5,269
Closing Date
13 Mar 2025, 5:00 pmClosed
Assistant Engineer
The Assistant Engineer, LID EW Section , Mogralputhur Grama Panchayat
Cherangi Kadapuram Kavugoli kadapuram road improvement of Mogralputhur G.P in Ward-XIII.-MPGP 156/24-25
2025_LSGD_746129_9
05/2024-25/AE/LID EW/MP/5 PHASE
Open Tender
Civil Works - Roads
Item Rate
120 days
Mogralputhur GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,269
Yes
7 Nov 2025
5 Mar 2025
15 Mar 2025
5 Mar 2025
13 Mar 2025
5 Mar 2025
Amount
Construction of Road
3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
OD331832/2024-2025:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
3.3:Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
abdul basheer k t (BID ID -2151772)
Bidder Name
abdul basheer k t
MUHAMMAD NOWFAL N A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1205675.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .