Loading…
Loading…
Tender ID
Tender Value
₹14.9 L
EMD Value
₹14,870
Closing Date
13 Mar 2026, 4:00 pmClosed
Executive Officer
Jeypore Municipality
As per DTCN
2026_ORULB_126890_1
JM-TCN07/2025-26
Open Tender
Civil Works - Others
Percentage
30 days
Jeypore
As per DTCN
2 documents required · 2 mandatory
₹6,000
₹14,870
Yes
5 Mar 2026
5 Mar 2026
18 Mar 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
Biju Santi Udyan
Supplying/ Repairing Fitting fixing of Rope light ( Cromption/ Bajaj or Similar Make ) T and P etcall complete.
Supplying/ Repairing Fitting fixing of Bollard light (Cromption/ Bajaj or Similar Make ) T and P etc all complete.
Supplying/ Repairing Fitting fixing of Tree Shape light (Cromption/ Bajaj or Similar Make ) T and P etc all complete
Supplying/ Repairing Fitting fixing of Dome Shape light ( Cromption/ Bajaj or Similar Make ) T and P etc all complete.
Supplying/ Repairing Fitting fixing of Flood Light( Cromption/ Bajaj or Similar Make ) T andP etc all complete.
Supplying/ Repairing Fitting fixing of Ring Shape Street light ( Cromption/ Bajaj or Similar Make ) T and P etc all complete.
Repair and maintenance of Biju Santi Udyan Signage
Fly Ash Brick (23x11x8cm) size having crushing strength not less than 75kg/ cm2 with cement mortar (1:6) in foundation and plinth per cum.
12mm thick plaster (1:4) over brick work.
Priming one coat to wall surafce using water bound cement primer including cost, Conveyance all materilas, labour and T and P etc complete.
Painting Two coat with weather seal paint including cost, Conveyance all materilas, labour and T and P etc complete.
Supplying of M.S. Door, Window with grills, Grills made out of M.S. Angle frame, M.S. Flat, Sheet etc of approved section and design, electrically welded properly with all necessary locking arrengement, and 1 coat red oxide primer including cost of all materials, labour charges, carriage of materials to site etc. complete.
For Plantation.
For Cleanning of pond
Toilet at Khajuribandha
Earth work in oridinary soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum Scm to 7cim and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge.
Filling in foundation and plinth with sand well watered and rammed including cost of all materials.
PCC(1:3:6) with 40 mm size CBHG metal including all cost of materials, labour, conveyance, royalty, T and P, water for curing etc all complete.
RCC work M-20 grade with 20mm and down grade black hard granite CB stone chips including hoisting and laying. (P-50/4)
Supplying, fitting and placing uncoated of SAIL TMT BAR reinforcement complete as per drawing and specification.
Fly ash bricks 25 cm x 12 cm x 8 cIm size having crushing strength not less than 75 Kg/cm2 in cement mortar (1:6) in foundation and plinth including cost of materials, labour, royalty, conveyance, Tools and Plants, water for curing etc. all complete as per OPWD specification required for the work to finished items of work.
Fly ash bricks 25 cmx 12 cm x 8 cm size having crushing strength not less than 75 Kg'em2 in cement mortar (1:6) in super structure including cost of materials, labour, royalty, conveyance, Tools and Plants, water for curing etc. all complete as per OPWD specification required for the work to finished items of work
RCC foundation, plinth band and lootings bases of columns mass concrete pre
RCC LINTEL
RCC. Floor and Roof slabs, landings, balconies, projecting sub-shades, and chajjas upto 4.3Mheight
6mm thick cement Plaster (1:4) RCC Surface finished smooth including closed deep shiping and slurry treatment.
12 mm thick cement plaster (1:6) for brick work 179
16mn thick plaster (1:6) for brick masonry or stone masonry
Priming one coat with wall cement primer water bound on plaster surface. 160
Finishing walls with water proofing weather coat paint of approved make including cost of caffolding staging charges with cost of all materials taxes, labour
Wall painting 2 coats with plastic emulsion paint of approved shade on new work to give an even shade inculding cost of paint. 154
Supplying all material , labour, T and P for fitting, fixing of PVC fibre door with frame inlud1ng all cost , nails etc. complete
Cost of Primer, Paint, Painting and Letter writing over Disply board 303
Add clectrical fitings
Add phd fittings
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.76 MB
BOQ_584021.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .