Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance 512 CHITTILAKATTU IRIPANAM TRIPUNITHURA ERNAKULAM KERALA 682309 | ERNAKULAM | KERALA | 682309 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
1 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sunilkumar K A
Deputy General Manager (Projects and Planning) FACT (Cochin Division) Ambalamedu Ernakulam
Installation and Commissioning of RLNG Burners in NP Plant at FACT-CD, Ambalamedu,Instrumentation works.
2021_FACT_610093_1
04028/2020-2021/E22821
Limited
Miscellaneous Works
Item Rate
60 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDN105, CDN106, CDN111)
5 documents required · 5 mandatory
₹0
₹5,000
Yes
2 Feb 2021
16 Jan 2021
2 Feb 2021
16 Jan 2021
1 Feb 2021
16 Jan 2021
180 days
Installation & Commissioning of RLNG Burners in NP Plant at FACT-CD, Ambalamedu – Instrumentation works
Installation of DP Transmitter with Enclosure/Canopy and Impulse Tubing DP Transmitter, manifold, SS Tubes, Pipes, Fittings and Instrument Enclosure/Canopy will be supplied by FACT free of cost. The scope of work includes transportation of all necessary items(including free supply items from FACT) from Lab / Stores to site. The work also includes installation/mounting of the electronic DP transmitter inside the FRP enclosure / canopy after mounting on the stanchions/supports, impulse tubing fabrication using 12 mm SS tube with suitable fittings, laying and interconnection /termination of tube at both the ends after the first isolation valve ( at the tapping points of orifice plate/annubar ) to the 3-valve manifold of DP transmitter with suitable SS clamps, SS fasteners, SS identification tags wherever necessary. The completed tubing/piping shall be tested for leak by hydrostatic testing for the pressure rating specified. Supply of 4 nos of bolts and hex nuts for transmitter fixing is also included in this item.
Installation of Pressure Transmitter/Switch with Enclosure/Canopy and Impulse Tubing Pressure Transmitter/Switch, manifold, Instrument Enclosure/Canopy, SS Tubes, Fittings will be supplied by FACT free of cost. The scope of work includes transportation of all necessary items(including free supply items from FACT) from Lab / Stores to site, installation/mounting of the electronic pressure transmitter inside the FRP enclosure / canopy after mounting on the stanchions/supports, impulse tubing using 12 mm SS tube with suitable fittings, laying and interconnection /termination of tube at both the ends after the first isolation valve ( on the process line/vessel ) to the 2-valve manifold of Pressure transmitter with suitable SS clamps, SS fasteners, SS identification tags wherever necessary . The completed tubing shall be tested for leak by hydrostatic testing for the pressure rating specified. Supply of one SS304 U clamp and 4 nos hex nuts for transmitter fixing is also included in this item.
Installation of Electronic Transmitters Electronic transmitters (2-Wire / 3-Wire /4-Wire) and FRP Canopies/Enclosures will be supplied by FACT free of cost. The scope of work includes transportation of all necessary items(including free supply items from FACT) to site. The work also includes installation/ mounting of the transmitters inside the FRP enclosures / canopies on Stanchions/Pipe Supports/ Structurals with suitable SS clamps, SS fasteners, and SS identification tags wherever necessary. . Supply and installation of all other items required for the completion of work like, SS fasteners, SS identification tags and SS clamps is included in this item.
Installation of Direct Mounted Pressure gauges with Enclosure/Canopy and Impulse Tubing Pressure Gauge, manifold, tubes, Fittings, couplings, glands, gauge saver, syphon, snubber, fasteners, gaskets, will be supplied by FACT free of cost. The scope of work includes transportation of all necessary items(including free supply items from FACT) from Lab / Stores to site. The work also includes installation/mounting of the direct mounted threaded/flanged pressure gauge of all sizes, with or without manifold / snubber / syphon / gauge-saver, impulse tubing using 12mm SS tube with suitable fittings, laying and interconnection /termination of tube at both the ends after the first isolation valve (on the process line / vessel) to the 2-valve manifold of pressure gauge with suitable SS clamps, SS fasteners, SS identification tags wherever necessary. The completed tubing/piping shall be tested for leak by hydrostatic testing for the pressure rating specified. Supply and installation of all other items required for the completion of work like, SS fasteners, SS identification tags and SS clamps is included in this item.
Fabrication and Fixing/Mounting of field Instrument supports: The work includes fabrication of instrument supports (size 50 NB, SCH80 MS/SS pipe,"L"shape size 300X 200mm approx) and fixing the support using anchor bolts or welding on "I" beam / Channels. Note: All materials required for the work will be supplied by FACT as free issue.
Fabrication and Fixing/Mounting of Instrument stanchions: The Work includes fabrication of instrument stanchion (size 50 NB, SCH80 MS pipe, length approx. 130cm) with base plate of size 225mm X225mm X 6mm and fixing the stanchion using anchor bolts or welding on "I" beam / Channels. Note: All materials required for the work will be supplied by FACT as free issue.
Installation of Junction Boxes: The work includes transportation of Junctions boxes of size 350x420x150mm (approx), Canopies/Enclosures and MS/Aluminum angles, necessary items (including free supply items from FACT) from Lab / Stores to site. The work also includes installation of the canopies/enclosures [Dimensions: 550X 450X 325mm (H X W X D)], installation & mounting of Junction boxes inside the canopies on newly fabricated AL/MS frame supports. The work shall also include fabrication of the MS/aluminum frame supports with necessary holes drilled for mounting the JBs and fixing it on to the available structures by welding/using fasteners (SS bolt,SS nut and SS washers of size M10X60 to be supplied by contractor) or grouting on to the structure including minor civil work required for fixing JBs. The supply of fasteners as detailed above is included in this item. Unused gland holes in the JBs shall be covered with proper blanking plugs. MS supports shall be painted with two coat epoxy paint over suitable primer. Note: The Junction Box, MS angles/flats and blanking plug shall be supplied by FACT free of cost.
Fabrication and Fixing Ladder Type Aluminium Cable tray Aluminium angles of size 50x50x6mm, Aluminium flats of size 50x8mm, MS angles and necessary welding rods(for carrying out this work) will be supplied by FACT free of cost. The scope of work includes transportation of all necessary items(including free supply items from FACT) to site. The work also includes Fabrication of ladder type cable racks of various sizes up to 400mm using Aluminium angles of size 50x50x6mm and Aluminium flats of size 50x8mm. Aluminium flat cable supports shall be provided as cross bar at intervals of 50cm by drilling two numbers of holes at each end and fixing it with fasteners [SS304- nut, bolt and washers of size 40 x 6 mm]. The fixing of the fabricated rack shall be by using proper aluminium/ MS angle support or using proper SS304 anchor bolts. SS nut, bolt and washers of size 60 x 8 mm shall be used wherever required for the erection of the cable racks. The work shall include painting of MS supports with one coat of primer and two coats of chlorinated rubber paint of dark gray colour. Supply and installation of all other items required for the completion of work like, SS fasteners, SS304 anchor bolts, SS304 nuts,SS304 bolts & SS304washers,SS identification tags and SS clamps is included in this item.
Laying of Signal/Power Branch Cables - 1 pair/2 pair/1 triad/3 Core Cables will be supplied by FACT free of cost. The scope of work includes transportation of cables to site, Installation of signal/ power cables-1 pair /2 pair /1 triad /3 Core with wires of size 0.5/1/1.3/2.5 sqmm by laying on new/existing cable tray/ rack / clamping on the wall / structure / routing through GI pipe/trenches. The cables are to be laid from junction boxes/field panels/control room to Junction boxes/field panels/field instruments. Dressing of cables in racks shall be by using Aluminium strips of size 20x5mm at intervals of minimum 1 meter on horizontal runs and 30 cm on vertical runs. The scope of work also includes supply and making of SS tags with cable numbers punched on it [as per cable schedule] and fixing them on either end of the cables before entering the instruments, junction boxes or control room. The tags may be tied to the cable using SS wires. The aluminium flat strips shall be fixed using M6 X40 SS Fasteners. Supply and installation of all items except the cables, required for the completion of work shall be in the contractor's scope.
Laying of Signal/Power Multicore Cables - 12 pair/ 20 pair/24 Core Cables will be supplied by FACT free of cost. The scope of work includes transportation of cables to site, Installation of signal/ power cables-20 pair / 12 pair / 24 core with wires of size up to 2.5 sqmm by laying on new/existing cable tray/ rack / clamping on the wall / structure / routing through GI pipe/trenches. The cables are to be laid from junction boxes/field Panels to Junction Boxes / DCS Control Room. Dressing of cables in racks shall be by using Aluminium strips of size 20x5mm at intervals of minimum 1 meter on horizontal runs and 30 cm on vertical runs. Clamping of cables on structure shall be by welding and fixing suitable cleats. The scope of work also includes supply and making SS tags with cable numbers punched on it [as per cable schedule] and fixing them on either end of the cables before entering the instruments, junction boxes, field panels or control room. The tags may be tied to the cable using SS wires.The aluminium flat strips shall be fixed using M6 X40 SS Fasteners. Supply and installation of all items except the cables, required for the completion of work shall be in the contractor's scope.
Dressing of Cables The work includes dressing of branch and multicore cables of sizes 1 pair, 3 core,1 triad and 20 pair, 12 pair, 12 Triad respectively in a group of 10 -15 number of cables on unit length of tray on new/existing cable trays of various sizes. The work also includes arranging and dressing of the cables in ladder type/slotted MS/ aluminium cable racks/trays by using nylon rope / aluminium flat strips (20x5mm) at intervals of minimum 50 cm on horizontal runs and 30 cm on vertical runs. The aluminium clamps shall be provided on the trays using M6 X40 SS Fasteners. Supply and installation of all items except the cables, required for the completion of work shall be in the contractor's scope.
Signal/Power Branch Cable Glanding Cable glands will be supplied by FACT free of cost. The scope of work includes transportation of all necessary items to site, glanding of the signal and power cables of size 1 Pair / 1 Triad / 3 Core at junction boxes and field using double compression / single compression glands of proper size. The glanding shall be done with good workmanship and securing of glands shall be proper and tight. Stripping of insulations from wires shall be done without nicking the conductor. Standard stripping tools of proper design shall be used for carrying out the work.
Signal/Power Multicore Cable Glanding Cable glands will be supplied by FACT free of cost. The scope of work includes transportation of all necessary items to site, glanding of the signal and power cables of size 20Pair / 12 Pair / 24 Core at junction boxes / field panels using double compression / single compression glands of proper size. The glanding shall be done with good workmanship and securing of glands shall be proper and tight. Stripping of insulations from wires shall be done without nicking the conductor. Standard stripping tools of proper design shall be used for carrying out the work.
Termination of Signal/ Power Cables 0.5 to 2.5 sq.mm Termination of individual wires of size 0.5 to 2.5 sqmm of 24core / 20pair/ 12 pair/ 12 Triad/ 1 Pair/ 1 Triad cables at terminal strips in Junction Box, Field Panels and field instruments. The work shall include, removal of outer sheath, insertion of printed ferrules, boot lace type crimping lugs on to individual cores, earthing of shield wire, and connecting the cable at the terminal strip/ field instruments with proper dressing. All wires or leads terminated at connection shall have sufficient slack. The unused wires in the cables shall be tied properly with cable ties & supports and kept neatly inside the junction box/field panel. Cross ferruling shall be followed.
Laying of 10mm / 12mm SS Tubes The work includes Laying of 10mm / 12mm SS pneumatic tubing between air headers, air filter regulators, I/P Converters etc. of control valves located at the plant site. The tubing will involve providing standard SS fittings from air header to control valve/SOV accessories as required. Ends shall be connected at air header tapings, air filter regulator or I/P Converter. Sharp bends shall be avoided and proper support shall be given using clamps for the pneumatic tubing. All materials required for the work will be supplied by FACT as free issue.
Laying of 6mm / 8mm SS Tubes The work includes laying of 6 mm/8mm SS pneumatic tubing between air headers, air filter regulators, I/P Converters etc. of control valves located at the plant site. The tubing will involve providing standard SS fittings from air header to control valve accessories as required. Ends shall be connected at air header tapings, air filter regulator or I/P Converter. Sharp bends shall be avoided and proper support shall be given using clamps for the pneumatic tubing. All materials required for the work will be supplied by FACT as free issue.
Supply of Unskilled Labour Supply of Unskilled Labours with tools on 8 hour shift basis(man-day) for providing commissioning assistance for FACT such as fixing of local panels, junction boxes, control valves etc., instrument installations in general, transportation of materials from stores/lab to site during execution of the contract.
Supply of Skilled Labour Supply of skilled Instrument craftsmen for attending instrumentation related works on 8 hour Shift basis, as directed by Engineer-in- charge. They shall have a) ITI/ITC Instrumentation NCVT certificate with experience in similar jobs and Apprenticeship in FACT/ Refinery/ Fertiliser/Petrochemical plants or b) ITI/ Diploma holders with Six months experience in FACT/ Ammonia Plant/ Refineries/ Fertiliser/ Petrochemical plants in instrument maintenance activities in a running plant.
VIKRAMAN NAIR S
DAMODARAN V
stage.html
html • 0.02 MB
finance_641287.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .