Loading…
Loading…
Tender Value
₹87.2 L
EMD Value
₹1.7 L
Closing Date
20 Jul 2026, 3:00 pm
Executive Engineer
O/o The Executive Engineer , SHQ, SSB, Pilibhit
onstruction of Initial infrastructure for establishment of 49th Bn SSB Pilibhit SH construction of security fencing around the initial infrastructure Gate ,sentry post and guard room
2026_SSB_916704_1
EE/SHQ/SSB/PBT/2025-26/40
Open Tender
Civil Works
240 days
49 BN SHQ SSB Pilibhit
As per Nit
2 documents required · 2 mandatory
₹0
₹1.7 L
O/o The Executive Engineer , SHQ, SSB, Pilibhit
10 Jul 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
10 Jul 2026 - 20 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 220.77 | cum | 172.71 | ₹38,129.19 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 126.64 | cum | 190.71 | ₹24,151.51 |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation, trenches, plinth, sides of foundation etc. complete lead up to 50 m andlift upto 1.5 m. | 12.64 | cum | 681.59 | ₹8,615.3 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 20.69 | cum | 2,066.41 | ₹42,754.02 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 59.43 | cum | 6,628.08 | ₹3,93,906.79 |
| 6 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.9 | cum | 7,665.78 | ₹22,230.76 |
| 7 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 46.39 | sqm | 729.07 | ₹33,821.56 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 25.04 | cum | 8,801.51 | ₹2,20,389.81 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 45.69 | cum | 10,559.92 | ₹4,82,482.74 |
| 10 | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 12.14 | cum | 11,194.85 | ₹1,35,905.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
NITguardr.pdf
Tender Documents • 1.78 MB
BOQ_963374.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid