OFFICE OF THE EXECUTIVE ENGINEER, AMRELI IRRIGATION DIVISION,AMRELI
Renovation and Strengthening of Compound Wall Plastering and Painting work & providing and Erection main gate, Parking shed, Paver Block at Thebi Inspection Banglaw Near Thebi dam site Ta. Amreli , Dis. Amreli.
321814
1 of 2026-27
Open
AMC/Maintenance Contracts
Amreli
8 documents required · 7 mandatory · 1 optional
₹900
Executive Engineer, Amreli Irrigation Division,Amreli
₹22,000
7 Jul 2026
7 Jul 2026
7 Jul 2026
22 Jul 2026
7 Jul 2026
No (INR) (Words) Rs.
1 Jungle clearance of specified category 8000.00 Sqmt. 1.2 One Rupee
and bushes for canal/dam work as and Two
directed with depositing material etc paisa
complete. (Excluding tree of grith
above 0.5 mt) A) Upto 2 year old a)
For light dence
2 Demolition of Brick work and stone 6.10 Cum. 562.89 Five
masonry including stacking of hundread
serviceable materilas and disposal of Sixty Two
unserviceable materials with all lead Rupee and
and lift.(ii) In Cement Mortar. Eighty Nine
3 Brick work using common burnt clay 5.30 Cum. 4245.09 Four
building bricks having crushing Thousand
strength not less than 35 kg./Sq.Cm. Two
in foundation and plinth in Cement hundread
Mortar 1:5. (1- Cement : 5 -fine Fourty Five
sand)(B) Conventional Rupee and
Nine paisa
4 Removing and scraping of old 936.00 Sqmt. 19.89 Nineteen
deteriorated plaster of any thickness Rupee and
fromm wall / R.C.C member including Eighty Nine
stacking of serviceable material and paisa
disposal of unserviceable from site of
work with all lead and lift.
5 20mm thick sand faced cement 956.00 Sqmt. 342.41 Three
plaster on walls upto height 10 Hundread
metres above ground level consisting Fourty Two
of 12mm thick backing coat of C.M. Rupee and
1:3 (1-cement : 3-sand) and 8mm Fourty One
thick finishing coat of C.M. 1:1 (1- paisa
cement : 1-sand) etc. complete.
6 Applying Exterior wall primer coat of 956.00 Sqmt. 76.43 Seventy Six
approved brand (burger, Asian paints Rupee and
or equivalent) on wall surface Fourty Three
including preparing the surface by paisa
cleanig, removing all dirt, and
remains of loose powdered material
and other foreign matter etc
complete as per direction of engineer
in charge. (For outside Area)
7 Finishing wall with weather proof 956.00 Cum. 120.26 One
exterior emulsion paint on wall Hundread
surface (two coats) to give an Twenty
required shape even shade after rupee and
thoroughly brushing the surface to Twenty six
remove all dirt, and remains of loose paisa
powdered materials.etc complete
8 Applying priming coat over new steel 211.00 Sq mt. 36.74 Thirty six
and other metel surface after and rupee and
including preparing the surface by Seventy Four
throughly cleaning, oil,grease, dirt paisa
and other foreign matter and scoured
with brushes fine steel wood,
scrapers and sand paper with ready
mixed priming paint brushing red
9 Painting two coats (excluding 211.00 Sq mt. 92.20 Ninety Two
priming coat) on new steel and other Rupee and
metal surface with enamel paint, Twenty
brushing, interior to give an even paisa
shade including cleaning the surface
an even shade including cleanicn the
surface of all dirt, dust and other
foreign matter.
10 Providing and fixing decorative 1.00 No 65020.00 Sixty Five
entrance slidng gate made out of cast Thousand
iron and various mild steel tabular Twenty
section combination , the MS gate Rupee
with sliding mechanisum of all
including pattern and die making
cutting , welding , grinding,
fabrication , fixing in position at
compound wall with necessary
pedestal, bearing block and other
locking arrangement. The entrance
gate should be painted with two coats
of priming coat of paint, and two coat
of oil paint etc complete. As per detail
design and instruction of architect
11 Excavation in all sort of strata and 53.00 Cum. 79.00 Seventy Nine
formations incl. depositing the Rupee
unuseful excavated stuff as and
where directed incl sorting and
stacking useful materials as directed
upto 200 mt lead and all lift etc.
complete incl. dewatering. A) IN
OVERBURDEN INCL. HARD
12 Prov. & Laying in position "NOMINAL 24.75 Cum. 2646.00 Two
MIX" cement concrete using cement , Thousand
sand & gravel by mass and machine Six
mix for PCC including necessary Hundread
formworks, compaction, Fourty Six
raming,curing as directed with all only
lead and lift etc complete. For
foundation concrete / other general
purpose Concrete (1:3:6), Gravel
Size-40 mm to 63mm (cement level
220 kg/cum)
13 Prov. & Laying in position cement 28.00 Cum. 3465.00 Three
concrete using cement , sand and Thousand
crushed metal coarse aggregate by Four
mass and machine mix for PCC/RCC Hundread
including necessary formworks Sixty Five
compaction by vibrator,curing as Rupee
directed with all lead & lift etc
complete. (Excluding cost of steel )
FOR .BODY WALL, APRON, TRAINING
WALL, SIDE WALL, SPLAY WALL,
KEY WALL, CUT OF WALL ETC. 4/E)
"NOMINAL MIX" Conc. grade 1:2:4
and MSA-40mm
14 Steel work, welded in built up 41.25 Q 9108.483 Nine
sections framed work including Thousand
cutting, hoisting, fixing in position One
and applying a priming coat of red Hundread
lead paint. (A)In beams and joists, Eight Rupee
channels angles Tees, flats, with and Fourty
connecting plates or angle cleats as in Eight Paisa
main and cross beams. Hip and jack
rafters, purlins conneted to common
rafters and the like
15 Providing and Fixing 6 mm thick 165.00 Sqmt. 1441.90 One
Lexan Polycarbonate multi wall Thousand
roofing sheet fixed with hilti screw Four
and rubber silicon sealer and Hundread
alluminium strip of size 50 x 3 mm Fourty One
etc complete as directed by Engineer Rupee and
in charge. Ninty Paisa
16 Providing and fixing pre-cast Rubber 770.00 Sqmt. 706.93 Seven
Dye / steel Dye inter locking concrete Hundread
block 60mm thick with grade of Six Rupee
concrete M300 pnumatic compressed and Ninty
/vibrated mechanically and as per Three paisa
approved design Confirming to IS
15658 : 2006 including 35 mm Sand
layer for levelling and filling the joint
with sand in proper line and level as
per guidlines of IRC : SP 63-2018 etc.
17 Providing and fixing barbed wire + 365.00 Rmt 336.00 Three
Concertina Coil fencing over existing Hundread
compound wall with MS angle iron Thirty Six
posts of size 40×40×6 mm fixed in Rupee
position by drilling and stretching
and fixing of approved quality
galvanized barbed wire in 4–5
horizontal rows including GI binding
wire, bolts, nuts, tensioning, labour,
tools and all incidental charges
18 Complete photography and 1.00 Each 500.00 Five
videography coverage before and Hundread
after completed of work & delivery of Rupee
finalized high-resolution photos and
edited video content in digital format.
(Twenty One Lakh Nine Thousand Five Hundread Sixty Rupee and Sixty Eight Paisa )
I/We am/are willing to carry out the work at...… %above/below percent (Should
Be written in figures and words) of the estimated rate mentioned above. Amount of my/our tender works out
*Estimated amount put to tender Rs. *Estimated amount put to tender Rs.
Deduct % Below Rs. Add % above Rs.
Net Rs. Total Rs.
(In words) Rupees (In words) Rupees
1 All works shall be carried out as per Public Works Department Hand Book and other specifications of
Division or as directed.
2 All the columns in schedule should be filled in ink and total of the entries in the last column should be
struck by the contractor under his signature.
3 Rates quoted include clearance of site (prior to commencement of work and its close) in all respect
and hold good for work under all condition, site, moisture, weather etc.,
4 To be continued on additional sheets, if found necessary.
5. The Hard rock credit should be deducted from Bill.
Executive Engineer
Amreli Irrigation Division
(B) For Item Rate Tender(For above INR50Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B)Rebate on above tendered amount (If any) %( in figure)………………………………
(in words)………………………………………………….………………………………………………...
(C)Net Tendered Amount (A-B)(in figure)………………………………
(in words)………………………………………………….………………………………………………...
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labourcess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Thebi Inspection Banglaw Compound Wall.pdf
BOQ Thebi Inspection Banglaw Compound Wall.pdf
Tender Notice No.01 of 2026-27.pdf
Download all tender documents and submit your bid