| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance HIMACHAL PRADESH HP | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.2 Cr+₹19.6 L (6.45%)Admitted-Finance | ₹3.2 Cr+₹19.6 L (6.45%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 Cr+₹25.3 L (8.32%)Admitted-Finance | ₹3.3 Cr+₹25.3 L (8.32%) | L3 | Admitted-Finance |
| 4 | L4₹3.7 Cr+₹61.2 L (20.1%)Admitted-Finance | ₹3.7 Cr+₹61.2 L (20.1%) | L4 | Admitted-Finance |
| 5 | L5₹3.8 Cr+₹80.5 L (26.5%)Admitted-Finance R O VPO DAULATPUR CHOWK TEHSIL GHANARI DISTRICT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹3.8 Cr+₹80.5 L (26.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Rajinder Rana L2 | PANKAJ KUMAR L1 | OM PARKASH SHARMA AND SONS L5 | Ajay Kumar Sood Engineers and Contractors L4 | SANJAY KUMAR NIRALA L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in hilly areas in all heights and depths and in all kinds of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out of rock (where blasting is prohibited) and other intermediate classification of soil, setting out true to the required lines, grades width cutting and trimming of side slopes and level as shown in the drawing and as directed by the Engineer-in-Charge at site according to the MORD technical specification 2014 clause 302 1603.1, 1603.2 and sorting out useful materials and stacking the same in all leads and lifts in acquired width of the road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus un-useful material to acquired width of the road or on approved dumping sites through all modes of transportation including head load or animals transport or mechanical means alongwith its leveling fine dressing and carriage of machineries, materials, tools equipments and safety measures and other incidentals necessary to complete the work by mechanical means and/or labour if required. Any loss to the public/private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases as per direction of the Engineer-in-Charge including carriage of material within all leads and lifts. A recovery of useful stone for 7244.06 cum (seven thousand two hundred forty four decimal zero six) cubic metre @ Rs. 300/- (Rupees three hundred only) per cubic metre shall be effected on pro-rata basis in each running bill from this item. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 45,839.98 | Per cubic metre | 230 ₹1,05,43,195.4 | 199 ₹91,22,156.02 Lowest | 300 ₹1,37,51,994 | 309 ₹1,41,64,553.82 | 235 ₹1,07,72,395.3 |
| 2.00 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiseling/wedging out of rocks (where blasting is prohibited) as per drawings and technical specification MORD 2014 clause 305 and as per direction of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto all leads and lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm (One hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the Engineer-in-Charge and carriage of material within all leads and lifts and other incidentals The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1,033.9 | Per cubic metre | 300 ₹3,10,170 | 200 ₹2,06,780 Lowest | 250 ₹2,58,475 | 300 ₹3,10,170 | 280 ₹2,89,492 |
| 3.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 524.84 | Per cubic metre | 100 ₹52,484 Lowest | 100 ₹52,484 Lowest | 200 ₹1,04,968 | 200 ₹1,04,968 | 307 ₹1,61,125.88 |
| 4.00 | Providing concrete for plain/reinforced concrete mechanically mixed and vibrated in open foundation retaining walls, breast walls etcetra complete as per drawings and MORD technical specfications 800 and 1200 nominal mix 1:5:10 (One cement : five sand : Ten graded crushed stone aggregate) 40mm (Forty millimetre) nominal size including cost of form work and curing complete without plum as per HPPWD specification complete in all respect including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 470.58 | Per cubic metre | 4,000 ₹18,82,320 Lowest | 4,200 ₹19,76,436 | 4,500 ₹21,17,610 | 4,200 ₹19,76,436 | 4,006 ₹18,85,143.48 |
| 5.00 | Back filling behind abutment , wing walls and return walls complete as per drawings and technical specification 2014 Clause 1204.3.8. with Granular Material and as per direction of Engineer-in-Charge including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 157.67 | Per cubic metre | 700 ₹1,10,369 | 500 ₹78,835 Lowest | 800 ₹1,26,136 | 600 ₹94,602 | 730 ₹1,15,099.1 |
| 6.00 | Providing weep holes in brick masonry / Stone masonry / plain/reinforced concrete in abutment retaining walls, breast walls and the like with 100mm ( One hundred millimetre ) dia PVC pipe Finolex/ Supreme having pressure not less than 4.00 Kg/Cm² ( four kilogramme ) per centimetre square extending through the full width of the structure with slope of 1(V):20(H) ( one vertical : twenty horizontal ) towards drawing face complete as per drawing and technical specification 2014 clause 614,709,1204.3.7 in all leads and lifts and carriage of material by all modes of transportation as per the direction of Engineer- in-chrage. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 265 | Each | 250 ₹66,250 | 200 ₹53,000 Lowest | 250 ₹66,250 | 200 ₹53,000 Lowest | 280 ₹74,200 |
| 7.00 | Providing and laying boulder apron laid in wire crates with 4 mm diametre G.I. wire confirming to IS:280 and IS:4826 in 100mm x 100mm mesh (woven diagonally) including 10% extra for laps and joints laid with stones boulders weighting not less than 25 kg. (twenty five kilograme) each as per drawing and technical specificifications clause 1301 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 156.4 | Per cubic metre | 2,500 ₹3,91,000 | 2,500 ₹3,91,000 | 2,800 ₹4,37,920 | 2,100 ₹3,28,440 Lowest | 2,350 ₹3,67,540 |
| 8.00 | Providing and laying M-10 (ten) grade design mix plain cement concrete in drains and open foundation for all type of structures on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawings and technical specification MORD 2014clause 802, 803, 1202 and 1203 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 349.51 | Per cubic metre | 4,800 ₹16,77,648 Lowest | 5,000 ₹17,47,550 | 5,500 ₹19,22,305 | 5,100 ₹17,82,501 | 5,050 ₹17,65,025.5 |
| 9.00 | Providing and laying mechanically mixed and vibrated cement concrete for plain/reinforced concrete in substructure and open foundation for all type of structures complete of plain cement concrete Grade M-15 (M-Fifteen) design mix upto minium cement contents 250(Two hundred fifty) Killograme per Cubic metre on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawings and technical specification 2014 clause 802, 803, 1202 and 1203 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 215.92 | Per cubic metre | 4,800 ₹10,36,416 Lowest | 5,200 ₹11,22,784 | 5,300 ₹11,44,376 | 5,500 ₹11,87,560 | 5,300 ₹11,44,376 |
| 10.00 | Providing and laying mechanically mixed and vibrated cement concrete for plain/reinforced concrete inopen foundation for all type of structures complete of plain cement concrete nominal M-20 ( M-twenty ) grade design mix with the cement contents 260Kg ( two hundred sixty kilogramme per cubic metre) on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawings and technical specification clause 802, 803, 1202 and 1203 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 144.08 | Per Cubic Metre | 5,800 ₹8,35,664 | 5,500 ₹7,92,440 Lowest | 5,800 ₹8,35,664 | 5,900 ₹8,50,072 | 6,004 ₹8,65,056.32 |
Tender Value
Refer Docs
EMD Value
₹6.7 L
Closing Date
15 Apr 2021, 6:00 pmClosed
Dharampur HPPWD EE
EE HPPWD Dharampur
Formation Cutting, Passing Places, R/wall, B/wall, CD works, GSB, WBM-II, WBM-III, Tarring work , Side drain, Parapets. Under RIDF-XXVI
2021_PWD_46150_4
PW-DPD-CB-Tender 25184-86
Open Tender
Civil Works - Roads
Item Rate
365 days
dharampur
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,000
Yes
EE Dharampur
₹6.7 L
Yes
26 Apr 2021
2 Apr 2021
16 Apr 2021
2 Apr 2021
15 Apr 2021
2 Apr 2021
Amount
Excavation in hilly areas in all heights and depths and in all kinds of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out of rock (where blasting is prohibited) and other intermediate classification of soil, setting out true to the required lines, grades width cutting and trimming of side slopes and level as shown in the drawing and as directed by the Engineer-in-Charge at site according to the MORD technical specification 2014 clause 302 1603.1, 1603.2 and sorting out useful materials and stacking the same in all leads and lifts in acquired width of the road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus un-useful material to acquired width of the road or on approved dumping sites through all modes of transportation including head load or animals transport or mechanical means alongwith its leveling fine dressing and carriage of machineries, materials, tools equipments and safety measures and other incidentals necessary to complete the work by mechanical means and/or labour if required. Any loss to the public/private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases as per direction of the Engineer-in-Charge including carriage of material within all leads and lifts. A recovery of useful stone for 7244.06 cum (seven thousand two hundred forty four decimal zero six) cubic metre @ Rs. 300/- (Rupees three hundred only) per cubic metre shall be effected on pro-rata basis in each running bill from this item. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiseling/wedging out of rocks (where blasting is prohibited) as per drawings and technical specification MORD 2014 clause 305 and as per direction of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto all leads and lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm (One hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the Engineer-in-Charge and carriage of material within all leads and lifts and other incidentals The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing concrete for plain/reinforced concrete mechanically mixed and vibrated in open foundation retaining walls, breast walls etcetra complete as per drawings and MORD technical specfications 800 and 1200 nominal mix 1:5:10 (One cement : five sand : Ten graded crushed stone aggregate) 40mm (Forty millimetre) nominal size including cost of form work and curing complete without plum as per HPPWD specification complete in all respect including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Back filling behind abutment , wing walls and return walls complete as per drawings and technical specification 2014 Clause 1204.3.8. with Granular Material and as per direction of Engineer-in-Charge including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing weep holes in brick masonry / Stone masonry / plain/reinforced concrete in abutment retaining walls, breast walls and the like with 100mm ( One hundred millimetre ) dia PVC pipe Finolex/ Supreme having pressure not less than 4.00 Kg/Cm² ( four kilogramme ) per centimetre square extending through the full width of the structure with slope of 1(V):20(H) ( one vertical : twenty horizontal ) towards drawing face complete as per drawing and technical specification 2014 clause 614,709,1204.3.7 in all leads and lifts and carriage of material by all modes of transportation as per the direction of Engineer- in-chrage. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying boulder apron laid in wire crates with 4 mm diametre G.I. wire confirming to IS:280 and IS:4826 in 100mm x 100mm mesh (woven diagonally) including 10% extra for laps and joints laid with stones boulders weighting not less than 25 kg. (twenty five kilograme) each as per drawing and technical specificifications clause 1301 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying M-10 (ten) grade design mix plain cement concrete in drains and open foundation for all type of structures on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawings and technical specification MORD 2014clause 802, 803, 1202 and 1203 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated cement concrete for plain/reinforced concrete in substructure and open foundation for all type of structures complete of plain cement concrete Grade M-15 (M-Fifteen) design mix upto minium cement contents 250(Two hundred fifty) Killograme per Cubic metre on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawings and technical specification 2014 clause 802, 803, 1202 and 1203 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated cement concrete for plain/reinforced concrete inopen foundation for all type of structures complete of plain cement concrete nominal M-20 ( M-twenty ) grade design mix with the cement contents 260Kg ( two hundred sixty kilogramme per cubic metre) on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawings and technical specification clause 802, 803, 1202 and 1203 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated cement concrete for reinforced concrete in substructure for all type of structures complete of plain cement concrete nominal M-20 (M-twenty) grade design mix with the cement contents 260Kg ( two hundred sixty kilogramme per cubic metre) on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site may arise at the time of laying under water complete for all heights/depths including the cost of form work as per drawings and technical specification clause 802, 803, 1202 and 1203 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated cement concrete for plain/reinforced concrete in super structure for all type of structures complete reinforced cement concrete grade M-25 (M-Twenty five ) design mix upto minimum cement contents 300 (three hundred ) Killograme per Cubic metre for all heights/depths including the cost of form work as per drawings and technical specification MORD 2014 clause 802, 803, 1202 and 1203 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying reinforced Cement concrete M-30 (Thirty) wearing coat mechanically mixed and vibrated minimum cement contents not less than 406.67 ( Four hundred six point six seven) Killogramme per cubic metre design mix including reinforcement complete as per drawings and technical specifications including the cost of form work and curing complete including entire carriage of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Supplying, fitting, and placing HYSD bar reinforcement (Fe 415) made of TATA/TISCO/SAIL in subrstructure complete as per drawing and technical specifications MORD 2014 clauses 1002, 1005,1010 and 1202 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Supplying, fitting, and placing HYSD bar reinforcement (Fe 415) made of TATA/TISCO/SAIL in super rstructure complete as per drawing and technical specifications MORD 2014 clauses 1002, 1010 and 1202 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying Rubble stone flooring laid in cement mortar 1:3 (one cement : three sand ) over cement concrete bedding complete as per drawing and technical specification MORD 2014 Clause 1303 including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying cement concrete bedding with M-15 ( fifteen ) grade flooring laid over cement concrete bedding complete as per drawing and technical specification MORD 2014 Clause 1303 including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated cement concrete for plain/reinforced concrete inin approach slab for all type of structures complete reinforced cement concrete grade M-25 (M-Twenty five ) design mix upto minium cement contents 406(Four hundred six ) Killograme per Cubic metre for all heights/depths including the cost of form work as per drawings and technical specification MORD 2014 clause 800 and 1211 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated cement concrete for plain/reinforced concrete below approach slab for all type of structures complete reinforced cement concrete grade M-15 (M- fifteen) design mix upto minium cement contents 250(Two hundred fifty ) Killograme per Cubic metre for all heights/depths including the cost of form work as per drawings and technical specification MORD 2014 clause 800 and 1211 as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and fixing Drainage spouts of G I pipe 100 (Hundred) Millimetres dia complete as per drawing and technical specifications Clause 1209 including Providing and fixing Corrosion resistant structural steel grating including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying (to level and slopes) 900mm dia (Nine hundred millimetre dia metre) reinforced cement concrete heavy duty non pressure pipe I.S. class NP-2 ( Two) for culverts on first class bedding of granular material in single row including fixing collars with cement mortar 1:2 (One cement : two sand) but excluding the cost of excavation, protection work, back filling, concrete and masonry work in head walls and parapets as per drawing and technical specification MORD 2014 clause 1101 and as per direction of Engineer-in-Charge including entire carriage of material within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Loosining of the ground up to level of 300 mm (three hundred millimetre) below the sub grade level, watered graded and compacted in layaers to meet requirement of table 300.1 and 300.2 for sub grade construction as per technical specification clause 303.5.2 including entire carriage of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Construction of Sub-grade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 (one thousand )metre as per Technical Specification Clause 303.1 including the cost of form work and entire carriage of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Construction of granular sub base by providing well graded materials grading -1 spreading in uniforms layers with tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD technical specification Clause 401 including entire carriage of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing, laying, spreading and compacting stone aggregate of specific sizes 63-45mm (Sixty three to forty five millimetres) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN (eighty to hundred Kilo Newton) in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-II by manual means as per technical Specification Clause 405 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing, laying, spreading and compacting stone aggregate of specific sizes 53-22.4mm (fifty three to twenty two point four millimetres) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN (eighty by hundred Kilo Newton) in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading-III by manual means as per technical Specification Clause 405 including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and applying primer coat with bitumen Emulsion (SS-1) made of HPCL/BPCL on prepared surface of granular base including cleaning of road surface and spraying primer @ 0.70 to 1.00kg/sqm (Zero point seven zero to one point zero kilogram per square metre ) using mechanical means as per Technical Specification 2014 Clause 502 and as per direction of Engineer-in-Charge including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and applying tack coat with bitumen emulsion (RS-1) made of HPCL/BPCL using emulsion distributor at the rate of 0.25 Kg to 0.30 Kg per sqm (Zero point two five to zero point three zero kilogram) per square metre on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause 503 and as per direction of Engineer-in-Charge including entire carriage of materials within all leads and lifts and other incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing, laying and rolling of open-graded premix carpet of 20 mm (twenty millimeter) thickness composed of 13.2 mm to 5.6 mm (thirteen point two millimeter to five point six millimeter) aggregates bitumen VG-10 penetration grade bitumen mixed with organo silane nano technology @ 0.1% by weight of bitumun 14.6 KG per 10 Square metres to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN (eighty-one hundred kilo newton) static roller capacity, finished to required level and grades to be followed by seal coat of Type B as per Technical Specification 2014 Clause 508 by mechnical means including hauling of material in all leads, lifts as per the entire satisfaction and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying seal coat sealing the voids in a bitumenus surface laid of the specified levels grade and cross fall using Type-B as per Technical specfication 510 of MORD with bitumen VG-10 @ 0.68 Kg (zero point six eight Killogramme )per Square mixed with organo silane nano technology @ 0.1% ( by weight of bitumen binder laid as per direrction of Engineer-in-charge. including hauling of material in all leads, lifts as per the entire satisfaction 2014 and direction of Engineer-in-charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Routine Maintenance after completion of construction work as per terms and condition of bid document that is 4 (vi) of contract data to general condition of contract and technical specifications of Ministry of Rural Development for rural roads August 2004 for rural roads including hauling/carriage of all labour equipment and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction of the Engineer-in-Charge.
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
Rajinder Rana
SANJAY KUMAR NIRALA
Ajay Kumar Sood Engineers and Contractors
OM PARKASH SHARMA AND SONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .