Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAdmitted-Finance | ₹3.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.4 CrAdmitted-Finance PUNE | ₹5.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹6.0 CrAdmitted-Finance PUNE | ₹6.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹6.1 CrAdmitted-Finance | ₹6.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹6.3 CrAdmitted-Finance DELHI | CENTRAL DELHI | DELHI | 110002 | ₹6.3 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ozone Constructions L2 | Mayur P Pawar L1 | Starline construction L8 | ZAMINDHAR INFRASTRUCTURE L7 | samruddhi infrastructure L6 | ELITE ARCHITECT & CONSULTANT L5 | Sai Infra Venture L3 | V DIVINE CONSTRUCTIONS L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation of trench (Normal Surface/Asphalt/Bituminous/Built up road) | 550 | RM | 600 ₹3.9 L | 600 ₹3.9 L | 750 ₹4.9 L | 1,500 ₹9.7 L | 1,650 ₹10.7 L | 1,500 ₹9.7 L | 500 ₹3.2 L | 600 ₹3.9 L |
| 2.00 | Restoration - Without supply of Paver blocks/tiles | 420 | RM | 550 ₹2.7 L | 550 ₹2.7 L | 600 ₹3.0 L | 600 ₹3.0 L | 450 ₹2.2 L | 800 ₹4.0 L | 400 ₹2.0 L | 530 ₹2.6 L |
| 3.00 | Restoration - With supply of Paver blocks/tiles | 300 | RM | 800 ₹2.8 L | 800 ₹2.8 L | 1,150 ₹4.1 L | 1,600 ₹5.7 L | 1,280 ₹4.5 L | 1,200 ₹4.2 L | 600 ₹2.1 L | 575 ₹2.0 L |
| 4.00 | PCC 1:2:4 - At Ground Level - M 15 | 110 | CUM | 6,000 ₹7.8 L | 6,000 ₹7.8 L | 8,500 ₹11.0 L | 8,500 ₹11.0 L | 7,500 ₹9.7 L | 8,000 ₹10.4 L | 6,500 ₹8.4 L | 5,800 ₹7.5 L |
| 5.00 | Ready Mix Concrete upto M 40 | 300 | CUM | 8,000 ₹28.3 L | 8,000 ₹28.3 L | 11,500 ₹40.7 L | 11,000 ₹38.9 L | 10,000 ₹35.4 L | 12,000 ₹42.5 L | 9,000 ₹31.9 L | 12,500 ₹44.3 L |
| 6.00 | RCC 1:1,5:3 - At Ground Level - M 20 | 100 | CUM | 11,500 ₹13.6 L | 7,000 ₹8.3 L | 10,500 ₹12.4 L | 7,500 ₹8.8 L | 9,500 ₹11.2 L | 10,000 ₹11.8 L | 11,500 ₹13.6 L | 15,200 ₹17.9 L |
| 7.00 | RCC 1:1,5:3 - At Ground Level - M 40 | 50 | CUM | 14,500 ₹8.6 L | 8,000 ₹4.7 L | 11,500 ₹6.8 L | 11,000 ₹6.5 L | 15,000 ₹8.8 L | 12,000 ₹7.1 L | 13,500 ₹8.0 L | 18,000 ₹10.6 L |
| 8.00 | Construction of upto 305 mm brick masonary wall in mix 1:5 cement mortar using sand in true line,level and plumb including painting,racking the joints up to 20mm depth. | 350 | SQ M | 3,000 ₹12.4 L | 2,450 ₹10.1 L | 2,450 ₹10.1 L | 6,500 ₹26.8 L | 2,550 ₹10.5 L | 3,000 ₹12.4 L | 250 ₹1.0 L | 4,200 ₹17.3 L |
| 9.00 | Plastering - Providing and laying 15mm thick plaster with 1:4 cement mortar in two coat with sponge finish to true line, level,plumb,rate also inclusive curing for required period. | 400 | SQ M | 800 ₹3.8 L | 800 ₹3.8 L | 4,200 ₹19.8 L | 600 ₹2.8 L | 450 ₹2.1 L | 500 ₹2.4 L | 850 ₹4.0 L | 525 ₹2.5 L |
| 10.00 | WaterProofing | 1,000 | SQ M | 500 ₹5.9 L | 580 ₹6.8 L | 3,700 ₹43.7 L | 850 ₹10.0 L | 1,800 ₹21.2 L | 1,500 ₹17.7 L | 2,200 ₹26.0 L | 1,950 ₹23.0 L |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
21 Apr 2026, 3:00 pmClosed
Manager
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune-411045
Tender for rate contract for the period of 02 years for Civil Works for Operation and Maintenance for MNGL, Pune GA.
2026_MNGL_273521_1
MNGL/CP/2025-26/172
Open Tender
Miscellaneous Services
730 days
Pune
AS PER TENDER
15 documents required · 15 mandatory
₹0
₹2 L
Yes
15 May 2026
30 Mar 2026
22 Apr 2026
30 Mar 2026
21 Apr 2026
30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Excavation of trench (Normal Surface/Asphalt/Bituminous/Built up road) | ||||||
| 2Restoration - Without supply of Paver blocks/tiles | ||||||
| 3Restoration - With supply of Paver blocks/tiles | ||||||
| 4PCC 1:2:4 - At Ground Level - M 15 | ||||||
| 5Ready Mix Concrete upto M 40 | ||||||
| 6RCC 1:1,5:3 - At Ground Level - M 20 | ||||||
| 7RCC 1:1,5:3 - At Ground Level - M 40 | ||||||
| 8Construction of upto 305 mm brick masonary wall in mix 1:5 cement mortar using sand in true line,level and plumb including painting,racking the joints up to 20mm depth. | ||||||
| 9Plastering - Providing and laying 15mm thick plaster with 1:4 cement mortar in two coat with sponge finish to true line, level,plumb,rate also inclusive curing for required period. | ||||||
| 10WaterProofing | ||||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tender_CivilOM.pdf
Tender Documents • 5.00 MB
BOQ_319320.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid