Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC NOT AVAILABLE | ₹25.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.6 L+₹23,645.83 (0.93%)Rejected-Finance | ₹25.6 L+₹23,645.83 (0.93%) | L2 | Rejected-Finance HIGHEST BID REJECTED |
| Sl No | Description | Qty | Unit | Jaiju Jayaprakash L1 | RAGHUNATH CM L2 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF SLUICE | |||||
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 33.12 | cum | 1,196.25 ₹39,619.8 Lowest | 1,198 ₹39,677.76 |
| 1.00 | OD369519/2025-2026:60.1.1 RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 20 | metre | 1,735.13 ₹34,702.6 Lowest | 1,737 ₹34,740 |
| 1.00 | OD369521/2025-2026:60.2.2 Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 90 | hour | 455.42 ₹40,987.8 Lowest | 456 ₹41,040 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 121.38 | cum | 257.4 ₹31,243.21 Lowest | 258 ₹31,316.04 |
| 1.00 | OD369524/2025-2026:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 57.45 | cum | 908.75 ₹52,207.69 Lowest | 910 ₹52,279.5 |
| 1.01 | OD369523/2025-2026: 60.7.4,DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted
rubble including packing to compactness to lines levels, cost and conveyance of all materials
labour charges etc. complete as per direction of Departmental officers at site
Details of cost for 1 cum. | 41.36 | cum | 4,208.13 ₹1,74,065.09 Lowest | 4,212 ₹1,74,225.17 |
| 1.01 | OD392884/2025-2026:60.7.4. DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality dptl blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 26.5 | cum | 1,932.58 ₹51,205.64 Lowest | 1,936 ₹51,296.26 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 12.94 | cum | 7,925.75 ₹1,02,527.5 Lowest | 7,935 ₹1,02,647.16 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 7,966.88 | kilogram | 112.33 ₹8,94,919.07 Lowest | 115 ₹9,16,190.63 |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
25 Mar 2026, 11:00 amClosed
REJIKUMAR V S, Secretary
The Secretary Thalikkulam Block Panchayat
MPLADS- 2025-26- Construction of Sluice Valve in Puthenthodu, Ward-7, Nattika
2026_CRD_847264_1
B-2065/2025
Open Tender
Civil Works - Others
Item Rate
365 days
Puthanthode Thalikulam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
14 Sept 2026
13 Mar 2026
26 Mar 2026
13 Mar 2026
25 Mar 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF SLUICE | |||||
| 1.001 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 33.12 | cum | - | - |
| 1.002 | OD369519/2025-2026:60.1.1 RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 20 | metre | - | - |
| 1.003 | OD369521/2025-2026:60.2.2 Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 90 | hour | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 121.38 | cum | - | - |
| 1.005 | OD369524/2025-2026:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 57.45 | cum | - | - |
| 1.006 | OD369523/2025-2026: 60.7.4,DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted
rubble including packing to compactness to lines levels, cost and conveyance of all materials
labour charges etc. complete as per direction of Departmental officers at site
Details of cost for 1 cum. | 41.36 | cum | - | - |
| 1.007 | OD392884/2025-2026:60.7.4. DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality dptl blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 26.5 | cum | - | - |
| 1.008 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 12.94 | cum | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 7,966.88 | kilogram | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.02 MB
pag.pdf
Tender Documents • 0.10 MB
sbd2.pdf
Tender Documents • 2.18 MB
affidavit.pdf
Tender Documents • 0.09 MB
fot1.pdf
Tender Documents • 0.01 MB
BOQ_1431864.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .