Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.8 LAdmitted-Finance | -31.00% | ₹20.8 L | L1 | Admitted-Finance |
| 2 | L2₹20.9 L+₹6,946.59 (0.33%)Admitted-Finance | -30.77% | ₹20.9 L+₹6,946.59 (0.33%) | L2 | Admitted-Finance |
| 3 | L3₹22.0 L+₹1.2 L (5.64%)Admitted-Finance | -27.11% | ₹22.0 L+₹1.2 L (5.64%) | L3 | Admitted-Finance |
| 4 | L4₹29.2 L+₹8.3 L (40.0%)Admitted-Finance | -3.40% | ₹29.2 L+₹8.3 L (40.0%) | L4 | Admitted-Finance |
| 5 | L5₹32.0 L+₹11.2 L (53.6%)Admitted-Finance | +6.00% | ₹32.0 L+₹11.2 L (53.6%) | L5 | Admitted-Finance |
Tender Value
₹30.2 L
EMD Value
₹60,400
Closing Date
27 Aug 2026, 6:00 pmClosed
xen
kalakote
Construction of storm water drains in different wards of MC Kalakote Ward No. 02 i. Drain near gurudwara and vasu vardhan house ii. nallah Bal Krishan and AShok House to Sethi Electronics shop iii. Nallah wall at Baba Nar Singh Mandir
2026_PWDJK_320776_6
eNIT No 48 of 2026/27 Dated 12/08/2026
Open Tender
Civil Works
Percentage
60 days
kalakote
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
xen
₹60,400
10 Sept 2026
13 Aug 2026
28 Aug 2026
13 Aug 2026
27 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil :AKS 70% OR 20% HR 10% | 141 | Cum | 359.59 | ₹50,702.19 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 18 | Cum | 4,826.5 | ₹86,877 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 91 | cum | 7,788.4 | ₹7,08,744.4 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 180 | cum | 5,733.6 | ₹10,32,048 |
| 5Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 5.1 | Foundations, footings, bases of columns etc. for mass concrete | - | Sqm | 286.35 | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with
5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 10 | Cum | 9,821.85 | ₹98,218.5 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
5.22.3 Cold twisted bars | 5,043 | kg | 123.2 | ₹6,21,297.6 |
| 8 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete. | 180 | Sqm | 416.5 | ₹74,970 |
| 9 | Providing and fixing in position precast R.C.C. manhole cover and frame
of required shape and approved quality.
20.15.1.1 Rectangular shape 600x450 internal dimensions | 10 | no | 1,166.15 | ₹11,661.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_1067633.xls
BOQ • 1.72 MB
corrigendum48.pdf
PDF • 0.25 MB
NIT48new.pdf
PDF • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .