| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.3 L+₹7,873.50 (3.57%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹2.2 L
EMD Value
₹5,579
Closing Date
18 Aug 2022, 5:00 pmClosed
Assistant executive engineer
O/o AEE Irrigation subdivision no1 chalakudy
clearing and removal of floating materials and heavy blockages
2022_Irrig_503033_1
09/AEE/2022-23/S
Open Tender
Civil Works - Canal
Item Rate
365 days
Kodakara
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,579
Yes
16 Sept 2022
11 Aug 2022
23 Aug 2022
11 Aug 2022
18 Aug 2022
11 Aug 2022
11 Aug 2022 - 18 Aug 2022
Amount
Clearing and removing floating materials and heavy blockages from the canals under Irrigation Section Kodakara
OD7587/2022-2023:Engaging scavenger for removing floating materials ,blockages and clearing the under tunnels etc complete and disposal of the same as per the same as per the direction of departmental officers at site
OD7588/2022-2023:Engaging man mazdoor for watching canal , operating shutters during water distribution periods including removing over growth vegetation from the canal
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
PAULSON.K.T
Bidder Name
REJI JOSEPH
PAULSON.K.T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_720651.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .