Loading…
Loading…
Tender Value
₹12.6 L
EMD Value
₹13,000
Closing Date
28 Sept 2026, 6:00 pmClosed
Executive Engineer Panchayat R&B Division Amreli
Construction of Library at Government Primary School at Village Hadmatiya,Ta.Rajula, Dist. Amreli
347092
Tender Notice No.16/2026-27, Sr.No.22
Open
Civil Works - Buildings
Works
Amreli
6 documents required · 5 mandatory · 1 optional
₹900
Executive Engineer Panchayat R&B Division Amreli
₹13,000
20 Sept 2026
20 Sept 2026
20 Sept 2026
28 Sept 2026
20 Sept 2026
Name of Work :- Construction of Library at Government Primary School at Village
Hadmatiya Ta. Rajula Dist. Amreli (Under DMF Grant 2025-26)
Bill of Quantities
Memorandum showing items of works to be carried out
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
1 33.480 Cum Excavation for foundation upto 1.5 m 212.52 Rupees Two One
depth including sorting out and Hundred Twelve Cubic
stacking of useful materials and and Paise Fifty metre
disposing off the excavated stuff upto Two only
All lead. (A) Loose or soft soil
2 16.200 Cum Excavation for foundation upto 1.5 m 272.57 Rupees Two One
depth including sorting out and Hundred Seventy Cubic
stacking of useful materials and Two and Paise metre
disposing off the excavated stuff upto Fifty Six only
All lead. (B) Dense or Hard soil
3 12.597 Cum Providing and laying cement concrete 2769.69 Rupees Two One
1:4:8 (1- Cement : 4- coarse sand : 8- Thousand Seven Cubic
hand broken stone aggregates 40 mm Hundred Sixty metre
nominal size) and curing complete Nine and Paise
excluding cost of formwork in (A) Sixty Nine only
Foundation and Plinth
4 5.724 Cum Providing and laying cement concrete 4093.89 Rupees Four One
work 1:2:4 (1- Cement : 2- Coarse Thousand Ninety Cubic
sand : 4- graded stone aggregates Three and Paise metre
20mm nominal size) and curing Eighty Nine only
complete excluding cost of formwork
and reinforcement for reinforced
concrete work in (A) Foundations,
footings, Base or columns and Mass
5 11.516 Cum Providing and laying ordinary cement 8593.80 Rupees Eight One
concrete 1:2:4 (1- Cement :2- coarse Thousand Five Cubic
sand : 4- graded stone aggregates Hundred Ninety metre
20mm nominal size)M200 and Three and Paise
finishing smooth with,curing etc. Eighty only
complete including the cost of
formwork but excluding the cost of
reinforcement for R.C.C work in (A)
BEAMS :(iii) Having cross-sectional
area more than 0.05 Sq.M and upto
6 41.280 Cum Filling in foundation and plinth with 301.78 Rupees Three One
murrum or selected soil in layers of Hundred One and Cubic
20cm. thickness including watering, Paise Seventy metre
ramming and consolidating Eight only
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
7 4.982 Cum Providing and laying ordinary cement 10469.21 Rupees Ten One
concrete 1:1.5:3 (1 Cement 1.5- coarse Thousand Four Cubic
sand : 3- graded stone aggregates 20 Hundred Sixty metre
mm nominal size) M200 and finishing Nine and Paise
smooth with,curing etc. complete Twenty One only
including the cost of formwork but
excluding the cost of reinforcement for
R.C.C work in (B) COLUMNS: (iii)
Having cross-sectional area more than
0.08 Sq.M and upto 0.12 Sq.M
8 43.995 Cum White Stone Bela masonry block in 6339.43 Rupees Six One
course in super structure with stone of Thousand Three Cubic
approved quality in Lime Mortar 1:6 (1- Hundred Thirty metre
Cement : 6- coarse sand) including Nine and Paise
packing the joints etc. complet. Forty Three only
9 1.177 Cum Providing and laying ordinary cement 8518.15 Rupees Eight One
concrete 1:2:4 (1 cement, 2 coarse Thousand Five Cubic
sand, 4 graded stone aggregate 20 mm. Hundred Eighteen metre
Nominal size) for reinforced concrete and Paise Fifteen
Lintel including finishing smooth with only
curing etc. complete including the cost
of formwork but excluding the cost of
10 0.907 Cum Providing and laying cement concrete 6693.29 Rupees Six One
1:2:4 (1- Cement : 2- Coarse sand : 4- Thousand Six Cubic
graded stone aggregates 20 mm Hundred Ninety metre
nominal size) for reinforced concrete Three and Paise
Chhajjas not exceeding 10cm. Twenty Eight only
thickness upto floor two level
including finishing the exposed
surfaces with cement mortar 1:3 (1-
cement, 3 Fine sand) to give a smooth
and even surface centering and
formwork and curing complete
excluding cost of reinforcement.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
11 9.198 Cum Providing and laying ordinary cement 6888.15 Rupees Six One
concrete 1:1.5:3 (M-200) (1 - cement, Thousand Eight Cubic
1.5 - coarse sand, 3 - graded stone Hundred Eighty metre
aggregate 20 mm. nominal size) and Eight and Paise
finishing smooth with curing etc. Fifteen only
complete including the cost of form
work but excluding the cost of
reinforcement for R.C.C. work in slab
having thickness more than 10 cm and
12 3533.826 Kg Providing TMT Bar FE 500D 77.29 Rupees One
reinforcement for R.C.C. work Seventy Seven Kilogram
including bending, binding and placing and Paise Twenty
in position complete upto All Floor Eight only
13 8.648 Sqm Providing and laying marble stone slab 2231.50 Rupees Two One
flooring over 20mm (average) base of Thousand Two Squere
cement mortar 1:6 (1-cement : 6 coarse Hundred Thirty metre
sand) or L.M. 1:1.5 (1- lime putty : 1.5 One and Paise
- coarse sand) laid and jointed with Fifty only
gray cement slurry including rubbing
and polishing complete. (A) Marble
slab 25mm thick
14 159.672 Sqm Providing 15mm thick cement plaster 195.42 Rupees One One
in single coat on Rough (Similar) side Hundred Ninety Squere
of single or half brick walls for interior Five and Paise metre
plastering upto floor all level and Forty Two only
finished even and smooth in (i)
Cement mortar 1:3 (1-cement:3-sand)
up to all Floor level
15 166.520 Sqm Providing 10mm thick cement plaster 196.27 Rupees One One
in single coat on brick/concrete walls Hundred Ninety Squere
for interior plastering upto floor two Six and Paise metre
level and finished even and smooth Twenty Seven
in (i)Cement mortar 1:3 (1-cement:3-
sand) upto all Floor level finished
even & Smooth with floating coat of
neat cement slurry
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
16 71.456 Sqm P & L 24" x 24" vitrified 8 mm thick 1264.50 Rupees One One
tile flooring over 20 mm (average) Thousand Two Squere
base of cement mortar 1:6 ( 1 Hundred Sixty metre
cement: 6 coarse sand) on new Four and Paise
surface or fixing on existing flooring
by adhesive material including
dismentaling of existing flooring and
jointed with color cement slurry
including finised with flush pointing
& cleaning the surface etc. complete
for light shade
17 130.109 Sqm Finishing wall with weather proof 120.26 Rupees One One
exterior emulsion paint on wall surface Hundred Twenty Squere
(two coats) to give an required shape and Paise Twenty metre
even shade after thoroughly brushing Six only
the surface to remove all dirt, and
remains of loose powdered
materials.etc complete
18 166.520 Sqm Distempering (Two coats) with oil 75.68 Rupees One
bound distemper of approved brand Seventy Five and Squere
and manufacture and of required shade Paise Sixty Eight metre
on wall surfaces to give an even shade, only
over and including a priming coat with
distemper primer of approved brand
and manufacture after thoroughly
brushing the surface free from mortar
dropping and other foreign matter and
also including preparing the surface
even and sand papered smooth.
19 84.312 Sqm Providing and laying broken china 779.70 Rupees Seven One
mosaic flooring for terrace using 12 Hundred Seventy Squere
mm to 20 mm broken pieces of glazed Nine and Paise metre
tiles to be laid over cement mortar 1:3 Seventy only
to plain or slope and to be tempered to
bring mortar creme out upto surface
using white cement including rounding
off junctions and extending them upto
15 cm along the wall, clearing with
water and oxalic acid etc. as directed
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
20 291.600 Kg Providing and fixing M.S. grills of 106.23 Rupees One One
required pattern to wooden frames of Hundred Six and Kilogram
windows etc. with M.S. flats at Paise Twenty
required spacings and frame alround, Three only
square or round bars with round
headed bolts and nuts or by screws (A)
21 6.480 Sqm Providing and fixing extruded 2140.33 Rupees Two One
aluminum windowhaving extruded Thousand One Squere
aluminum Colour Powder Hundred Forty metre
Coatedsection frame main outer size and Paise Thirty
127mm x 38.10mm x1.35m ,@ Three only
Wt.1.384 g/mt,horizontal Four
trackmember size 122.20mm x
Kg/mt,vertical member of size
Wt. 1.398 Kg/mt withsliding shutters
of horizontal member size 40mm
0.456Kg/mt,verticalmember of size
wt.of0.456Kg/mt,@ with 5 mm thick
transparent bronzecolour tinted float
glass with powder coatedaluminum
fittings and fixtures and
transparentsilicon sealant glass fixing
to frame as per details etccomplete for
22 4.200 Sqm Providing and fixing 35 mm thick 3773.84 Rupees Three One
shutters for Doors, windows and Thousand Seven Squere
clearstory windows including Hundred Seventy metre
blackenamelled M.S. butt hinges with Three and Paise
necessary screws. (A) Indian teak Eighty Four only
wood. (i) Fully Panelled.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
23 8.000 Point Point wiring for Light Bell with 2-1.5 424.20 Rupees Four 0
sq.mm & earthwire of 1.5 sq.mm Hundred Twenty
(Green) both are of ISI marked 1.1 KV Four and Paise
grade FRLS PVC insulated multistrand Twenty only
copper wires, In following type of pipe
to be erected concealed Inl on surface
on wall ceiling complete with 6A
Modular type switch bell push &
accessories and earth continuity of
following type, erected on PVC
Metallic box, single mounting base
frame covered with textured/metallic
front plate modules erected on in wall
ceiling as per pipe erected, with
necessary Lamp holder/celling rose
H.D.Connector as directed. (a) with
medium class Rigid PVC pipe and
24 6.000 Point Point wiring for FAN with 2-1.5 636.30 Rupees Six 0
sq.mm & earthwire of 1.5 sq.mm Hundred Thirty
(Green) both are of ISI marked 1.1 KV Six and Paise
Grade FRLS PVC insulated Thirty only
multistrand copper wires, in following
type of pipe to be erected concealed in
flushed on wall/ceiling complete with
6A Modular type switch and hum free
EME four or more step type electronic
fan regulator with separately mounted
and accessories with earth continuity
of following type erected on PVC
Metallic box, single mounting base
frame covered with textured/metallic
front plate modules erected on in wall
ceiling as per pipe erected. with
necessary ceiling rose H.D.Connector
as directed. (a) with medium class
Rigid PVC pipe and accessories
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
25 4.000 No Providing & erecting Switch board 1210.99 Rupees One One
for Computer or electric apparatus Thousand Two Number
consisting of following modular type Hundred Ten and
accessories mounted with PVC / Paise Ninety Nine
Metallic concealed/open box with
single mounting base frame covered
with textured/metallic /white front
plate,modules erected with necessary
connections as directed
1 no. 6A/16A universal plug-switch
3 nos. 6A Switch
3 nos. 6A 5 pin Plug For Modular
Type Accessories cat III
26 8.000 No Supplying and erecting approved make 595.90 Rupees Five One
of tube fitting with One no T-5 tube Hundred Ninety Number
24/ 28 W with Electronic ballast with Five and Paise
each tube separately THD less than 10 Ninety only
& built in adaptors, GI / PVC housing
& mirror optic reflector, suitable to
work on 120V - 300V, A.C. supply
with connector and adapter if required.
[Make of fitting & tube may be differ&
fitting shall be providing with tube] &
Approved make fluorescent tube
120cms. 18/20 watt erected, if
27 2.000 No Providing & erecting 240 V MCB 313.10 Rupees Three One
double pole switch for lighting load Hundred Thirteen Number
(B Curve) having 10 KA breaking and Paise Ten
capacity & Confirming to IS 8828 in only
Existing box having capacity (B)
28 1.000 No Providing and erecting Sheet Steel 1681.65 Rupees One One
powder coated MCB distribution board Thousand Six Number
flush surface mounted fitted with Hundred Eighty
busbar, neutral link, earth bar and DIN One and Paise
rail, confirming to IS 13032 and BS Sixty Five only
5486-1986 without McB to house
appropriate nos. of MCBs The DBs
should be used of same company of
MCB to be used) (H) single phase
way ss double door
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
29 180.000 Rm Providing and erecting Mains with 84.84 Rupees One
1.1 KV grade FRLS PVC insulated Eighty Four and Running
ISI marked stranded Copper Paise Eighty Four metre
conductor wire in following type of only
pipe to be erected concealed in
/flushed on wall/ceiling, with 1.5 sq.
mm copper conductor FRLS PVC
insulated stranded wire of green
colour for earth continuity of
following size (A) With medium
class Rigid PVC pipe and
accessories(b) 2 wire 2.5 sq. mm
30 6.000 No Providing & erecting Approved make 2666.40 Rupees Two One
Ceiling Fan with double ball bearing Thousand Six Number
ISI mark with Condenser 230 volt Hundred Sixty Six
A.C. 50 Hz 1200 mm sweep and Paise Forty
complete having 3 blades aluminium
body and blade sets having
ornamental design shanks , canopy
erected with earthing.
31 2.000 No Supplying & erecting funnel type 1919.00 Rupees One One
earthing having earth plate of Thousand Nine Number
following size burred in specifically Hundred Ninteen
prepared earth pit 3 mtr. below and Paise Zero
ground with 40 kg. charcoal and salt
with alternate layers of charcoal &
salt, 20mm.dia. G.I. pipe with Funnel
with a wire mesh for watering &
bricks masonry block, C.I. Cover
complete as per para 7.3 of IS
with necessary length of double
Galvanised Iron / copper earth wire
No 6 SWG bolted with lug to the
plate and covered in 12 mm dia. G.I.
pipe 2.5 mtr long complete connected
to the nearest switch gear with end
socket as per direction & duly tested
by earth tester confirming to IS (As
per drawing) with following
specification (A) With 30 x 30 x
cms: C.I. earth plate
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or In Figure In Words. according to
less. Rs. Ps estimated
32 101.262 Sqm Wall painting (twocoats) with plastic 125.40 Rupees One One
emulsion paint of approved brand Hundred Twenty Squere
and manufacture on undecorated Five and Paise metre
walls urface to give an even shade Forty only
including throughly brushing the
surface free from mortar dropping
sand other foreign matter and sand
papered smooth.
Dismentled Material Credit Rs.
will be deducted from 1 St R.A.
Rupees Twelve Lakh Sixty Thousand Eighty One and Paise Forty Two only Total Rs.
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow percent
( Should be written in figures and words ) of the estimated rate mentioned above. Amount of My
\ Our tender works put as under.
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division ( D P ) Road & Building Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
All circular Online.pdf
0.1 SBD.pdf
0.2 BOQ.pdf
0.3 Specification.pdf
0.4 Tender Details No.16-.pdf
0.5 Test Schedule.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .