Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹3.3 L+₹45,763.58 (15.9%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹3.6 L+₹67,783.81 (23.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | NITHIN.P.JOHN L1 | SHARAVAN. R. NATH L3 | P.K.MURALEEDHARAKURUP L2 |
|---|---|---|---|---|---|---|
| 1.00maintence | ||||||
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 20.8 | cum | 639 ₹13,288.01 | 790 ₹16,428.05 | 250 ₹5,198.75 Lowest |
| 1.00 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 53.22 | cum | 4,655 ₹2,47,739.1 Lowest | 5,751 ₹3,06,068.22 | 5,500 ₹2,92,710 |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 3.53 | cum | 6,500 ₹22,938.5 Lowest | 8,025 ₹28,320.23 | 8,500 ₹29,996.5 |
| 1.00 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.06 | tonne | 68,000 ₹3,876 Lowest | 84,367 ₹4,808.92 | 99,999 ₹5,699.94 |
Tender Value
₹4.2 L
EMD Value
₹10,587
Closing Date
30 Sept 2026, 3:00 pmClosed
ASSISTANTENGINEER
OFFICE OF THE ASSISTANT ENGINEER,LID AND EW SECTION,PANDALAM THEKKEKKARA GP
Annual Plan-2026-2027 PANDALAM THEKKEKKARA GP PRO NO 138 27 -THOTTAYKATTUKIZHAKKETHILPADI MURUPPELPADI ROAD MAINTENANCE WARD 5
2026_LSGD_870718_1
S06/AE/LSGD/PTGP/2026-27
Open Tender
Civil Works - Roads
Item Rate
180 days
PANDALAMTHEKKEKKARA
Please refer Tender documents.
8 documents required · 8 mandatory
₹935
Yes
₹10,587
Yes
5 Oct 2026
22 Sept 2026
5 Oct 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1maintence | |||||
| 1.001 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 20.8 | cum | - | - |
| 1.002 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 53.22 | cum | - | - |
| 1.003 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 3.53 | cum | - | - |
| 1.004 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.06 | tonne | - | - |
stage.html
html • 0.02 MB
finance_1475474.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1475474.xls
BOQ • 0.23 MB
FTTHOTTAKKATTUKIZHAKKETHILPADI.pdf
Tender Documents • 0.25 MB
PRILITHOTTAKKATTUKIZHAKKETHIL.pdf
Tender Documents • 0.26 MB
EPAYMENT.pdf
Tender Documents • 0.24 MB
INTETHOTTAKKATTUKIZHAKKETHIL.pdf
Tender Documents • 0.24 MB
AFFITHOTTAKKATTUKIZHAKKETHIL.pdf
Tender Documents • 0.24 MB
SBDTHOTTAKKATTUKIZHAKKETHILPADI.pdf
Tender Documents • 1.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .