Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹383.2 CrAccepted-AOC PLOT 20 FLAT 102 SRI CHALTANYA RESIDENCY STREET 2 SAGAR SOCIETY ROAD NO 2 BANJARA HILLS HYDERABAD TELANGANA 500 034 | HYDERABAD | HYDERABAD | TELANGANA | 500034 | Accepted-AOC Accept | |
| 2 | Rejected-Technical 307 JALARAM BUSINESS CENTER GANJAWALA LANE NEAR CHAMUNDA CIRCLE BORIVALI W MUMBAI 400092 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400092 | Rejected-Technical Work of Headwork Is Not Done As Per Qualification Criteria | |
| 3 | Rejected-Technical 02 AB ADGAONKAR PLAZA NEAR ABB CIRCLE MAHATMA NAGAR NASHIK 422 007 MAHARASHTRA | NASHIK | MAHARASHTRA | 422007 | Rejected-Technical As per Pre Qualification Criteria (Financial) The Bidder have Less Networth in the Financial Year 2020-21,2021-22 |
Tender Value
₹329.0 Cr
EMD Value
₹1.6 Cr
Closing Date
10 Aug 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Commisnor,3rd flr.Bncmc Corporation
Bhiwandi Muncipal Corporation,Kaap Ali. Old St.Std.Bhiwandi
AUGMENTATION TO BHIWANDI NIZAMPUR WATER SUPPLY 100 MLD SCHEME UNDER AMRUT2.0 MISSION. CONSTRUCTION OF JACKWELL, OVER HEAD PUMP HOUSE, RETAINING WALL, SUB STATION, RCC BRIDGES, RAW WATER AND PURE WATER MS RISING MAINS, CONVENTIONAL WTP 2 NOS 123 MLD
2023_BNMC_929277_1
BNCMC/WSD 25/2023_1
Open Tender
Water Equipments/ Meter/ Drilling/ Boring
Percentage
730 days
Bhiwandi Muncipal Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹59,000
₹1.6 Cr
9 Feb 2024
27 Jul 2023
11 Aug 2023
27 Jul 2023
10 Aug 2023
27 Jul 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | augmentation to bhiwandi nizampur city municipal corporation 100 mld water supply scheme under amrut 2 mission construction of jackwell over head pump house retaining wall sub station rcc bridges raw water and pure water ms rising mains conventional wtp 2 nos 2 nos 123 mld and 53 mld rcc sumps rcc mbr esr gsr di leading mains and other miscelleneous work | - | - | - | - |
| 2 | Sub Work No.1 : Working Survey Item No.1 :- Making detailed working survey includes following items A) Taking trial pits along pipeline every 500 M c/c distance. B) Prepared L-section of rising main/Gravity main / Leading main with position of Contriiled valve,Scour valve and Air valves. C) Check all levels of MBR/ESR/GSR/Sumps mentained in tender. D) Check Counter survey of WTP at Sonale and Temghar also Head works. E)Mentained main structure in alighnment of pipeline. F) In distribution network mentined main structure with bearing in every Node. G)Prepared detailed drawing for proposal of land acquisition from MCGB/National Highway/ Forst department/State highway/Jilha parishad etc. I) At the time survey perment bench mark should be show in every site on permenant structure and submit list of bench mark with sketch. J) Prepared Autocad drawing and submit on A-1,A-2,A-3,A-0 size with six coloured sets | 1 | - | 20,00,000 | ₹20,00,000 |
| 3 | Subwork No.2 : RCC Jackwell ( 22 x 14 M and 15.60 M Depth), Item No.1:- Providing and constructing coffer dam in river / nalla basin. Dam storage as per type design including excavation, filling the middle portion with B.C.soil (in gunny bags if required). Providing impervious / semipervious materials on both sides of B.C. Soil (including gunny bags if required) including ramming, compacting to the satisfaction of Engineer-in-charge till the completion of work including dismentaling coffer dam after completion of work and disposing off the material as directed by Engineer-in-charge. | 19,250 | - | 750.2 | ₹1,44,41,350 |
| 4 | Item No.2 :- Excavation in general in soft material comprising of soft soil, soft murum, sand,hard murum with boulders in wet or dry condition for Head Works i.e. Intake Well, Conection Pipe, Jack Well, Pump Suous, Supply Well etc. for lift 0 to 1.50 M and lead 150 M including baricadig, guarding disposing off surplus excavatedstuff within a radius of 0.5 Km. as directed by Engineer-in-charge .... etc. complete excluding refilling. (Lift 0 to 1.50 M.) | 1,018 | Cum | 510.4 | ₹5,19,587.2 |
| 5 | Lift 1.50 to 3.00 M. | 942 | Cum | 540.1 | ₹5,08,774.2 |
| 6 | Item No.3 :- Excavation in general in hard material comprising of soft rock, hard rock, Manjara rock, etc.by blasting/ controlled blasting/ chiselling, as required in wet or dry conditon for Head Works, i.e. Intake Well, Connection Pipe, Jackwell, Pump House, Supply well, etc. for lift 0 to 1.50 M including baricading, guarding, disposing off surplus excvatedstuff within a radious of 0.5 Km. as directed by Engineer-in-charge, excluding refilling. (Lift 1.50 to 3.00 M.) | 1,024 | Cum | 1,148.4 | ₹11,75,961.6 |
| 7 | Lift 3.00 to 4.50 M. | 861 | Cum | 1,179.2 | ₹10,15,291.2 |
| 8 | Lift 4.50 to 6.00 M. | 730 | Cum | 1,210 | ₹8,83,300 |
| 9 | Lift 6.00 to 7.50 M. | 665 | Cum | 1,240.8 | ₹8,25,132 |
| 10 | Lift 7.50 to 9.00 M. | 240 | Cum | 1,271.6 | ₹3,05,184 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1619523.xls
BOQ Document • 1.33 MB
125982726.pdf
Tender Document • 0.26 MB
documents100mld.pdf
Tender Document • 6.02 MB
Corrigendumprebidmeeting.pdf
Tender Document • 1.00 MB
125982728.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .