Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.7 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹40.2 L+₹4.6 L (12.8%)Rejected-Finance CAMP AT GORUBANDHA MISSAMARI ASSAM 784506 | SONITPUR | ASSAM | 784506 | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹42.3 L+₹6.6 L (18.6%)Rejected-Finance | L3 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | Saraswati Auto Works L2 | Maa Mira Enterprise L1 | bkgeneralstores L3 |
|---|---|---|---|---|---|---|
| 1.00 | M&L Servicing to DG set of capacity 500 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at Sewage Treatment Plant
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 1 | Each Job | 56,000 ₹56,000 | 50,000 ₹50,000 Lowest | 55,000 ₹55,000 |
| 2.00 | M&L Servicing to DG set of capacity 400 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at New Jalkendra
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 2 | Each Job | 52,500 ₹1,05,000 | 45,000 ₹90,000 Lowest | 51,750 ₹1,03,500 |
| 3.00 | M & L for Servicing to DG set of capacity 250 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at 671 EME
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 1 | Each Job | 33,000 ₹33,000 Lowest | 35,000 ₹35,000 | 35,000 ₹35,000 |
| 4.00 | M & L for Servicing to DG set of capacity 125 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at Old PH, 33KV MRS-I
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 2 | Each Job | 29,800 ₹59,600 Lowest | 30,000 ₹60,000 | 31,200 ₹62,400 |
| 5.00 | M & L for Servicing to DG set of capacity 100 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at Trolley mounted DG (Div), Signal Centre DG Set, MRS
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 3 | Each Job | 28,000 ₹84,000 | 26,000 ₹78,000 Lowest | 29,200 ₹87,600 |
| 6.00 | M & L for Servicing to DG set of capacity 62.5 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at OMC, 311 ASC Perimeter lights (TCP-I), MRS-II, Signal Centre, 223 Transit camp, STP SPS-F Old SBI
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 8 | Each Job | 24,000 ₹1,92,000 | 22,000 ₹1,76,000 Lowest | 26,000 ₹2,08,000 |
| 7.00 | M & L for Servicing to DG set of capacity 40 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at 4 Core Zonal Wksp and Stn HQ
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 2 | Each Job | 18,400 ₹36,800 Lowest | 20,000 ₹40,000 | 19,100 ₹38,200 |
| 8.00 | M & L for Servicing to DG set of capacity 30 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at 71 DOU, Signal Coy
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 2 | Each Job | 16,500 ₹33,000 Lowest | 20,000 ₹40,000 | 16,800 ₹33,600 |
| 9.00 | M & L for Servicing to DG set of capacity 25 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at STP SPS-H Goving Nagar
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 1 | Each Job | 15,300 ₹15,300 | 20,000 ₹20,000 | 15,100 ₹15,100 Lowest |
| 10.00 | M & L for Servicing to DG set of capacity 20 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at Zonal Wksp and 667 Army Avn.
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 2 | Each Job | 14,900 ₹29,800 | 20,000 ₹40,000 | 14,750 ₹29,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
18 Oct 2025, 6:00 pmClosed
GE MISSAMARI
PO-Missamari Dist-Sonitpur Assam
REPAIR TO STANDBY DISTRIBUTION SYSTEM AND MISC WORKS AT SOUTH OF RLY LINE UNDER GE MISSAMARI
2025_MES_732934_1
8559/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE MISSAMARI
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE MISSAMARI
₹90,000
Yes
1 Dec 2025
27 Sept 2025
21 Oct 2025
27 Sept 2025
18 Oct 2025
11 Oct 2025
27 Sept 2025 - 4 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
Tender8559.rar
Tender Documents • 0.52 MB
BOQ_820644.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .