Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC GAFOOR P | L1 | Accepted-AOC lowest rate | |
| 2 | Rejected-Technical | - | Rejected-Technical HIGHEST | |
| 3 | Rejected-Technical DOOR NO 148 KURUDIMUKKU ARIKKULAM PO KOYILANDY KERALA | - | Rejected-Technical HIGHEST | |
| 4 | Rejected-Technical KAYANNA BAZAR KAYANNA P O KOZHIKODE | - | Rejected-Technical HIGHEST | |
| 5 | Rejected-Technical VISHNU PRABHA HOUSE KAVIL P O NADUVANNUR VIA KOYILANDY KOZHIKODE DISTRICT KERALA 673614 | KOZHIKODE | KERALA | 673614 | - | Rejected-Technical HIGHEST |
Tender Value
₹4.4 L
EMD Value
₹11,109
Closing Date
27 May 2023, 6:00 pmClosed
AE
AE LID AND EW MEPPAYUR GP
CONCRETE ROAD
2023_LSGD_577578_1
AE/LSGD/MPR/2023-24/05
Open Tender
Civil Works - Roads
Item Rate
150 days
MEPPAYUR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹980
Yes
₹11,109
Yes
13 Oct 2023
20 May 2023
29 May 2023
20 May 2023
27 May 2023
20 May 2023
Amount
Road Concrete
3.15.1:Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
OD19497/2023-2024:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
ARIKKULAM LABOUR CONTRACT AND CONSTRUCTION CO-OPERATIVE SOCIETY
SREENATH. M.C.
SURESH.N.P.
ABDUL SALAM SEETHIVEETIL
KAIRALI LABOUR CONTRACT CO OPERATIVE SOCIETY LIMITED NO D3251
Bidder Name
GAFOOR. P.
ABDUL SALAM SEETHIVEETIL
SURESH.N.P.
SREENATH. M.C.
KAIRALI LABOUR CONTRACT CO OPERATIVE SOCIETY LIMITED NO D3251
ARIKKULAM LABOUR CONTRACT AND CONSTRUCTION CO-OPERATIVE SOCIETY
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_852954.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .