| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.6 LAccepted-AOC | 1 | Accepted-AOC BEING L1 BIDDER.ACCEPTED | |
| 2 | 2₹7.7 L+₹1.1 L (16.3%)Rejected-AOC | 2 | Rejected-AOC BEING L2 BIDDER.REJECTED |
| Sl No | Description | Qty | Unit | shanto jose L1 | WILSON THOMAS L2 |
|---|---|---|---|---|---|
| 1.00Appendix A | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 4,577 | sqm | 17 ₹77,809 | 15.08 ₹69,021.16 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 136.5 | cum | 150 ₹20,475 Lowest | 213.58 ₹29,153.67 |
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 2,250 | sqm | 100 ₹2,25,000 Lowest | 111.24 ₹2,50,290 |
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 6,366.8 | sqm | 27 ₹1,71,903.6 Lowest | 29.26 ₹1,86,292.57 |
| 1.00 | OD15448/2025-2026:Supplying and providing plastic mesh 25x25x2mm for trashrack to fixing GI pipe frames including cost and conveyance of all materials and labour charges etc complete as per the direction of departmental officers at site | 104 | sqm | 100 ₹10,400 Lowest | 339.92 ₹35,351.68 |
| 1.01 | OD15447/2025-2026:Labour engaged for clearing bloccks in siphons, removal of obstructions and waste etc in canal during the entire periods of water distribution. | 17 | each | 600 ₹10,200 Lowest | 897.13 ₹15,251.21 |
| 1.01 | OD15446/2025-2026:Leak rectification work in 315mm (6kg/cm2) PVC pipe line including
detecting and locating leak, earth work excavation in all classes soil for the exposing leak portion
of the pipe cutting the pipe diametrically perpendicular to the axis of pipe line without
causing any damages to the balance portion,dismantling and lifting the pipe from trenches
smoothening the cut ends overing the new pipes and lowering new pipe into the trenches placing
in position,alignning the pipe to line and level and jointing the new oipe with the existing
pipe with cement solvent cement or repairable joint and testing the pipe line by operating nthe valves
concerned ,and rectifing the defects if noticed anfd refilling the trenches in layaers
not exceeding 20cm in depth including consolidating each layers by ramming,watering,charges for removing surplus
soil from work site without causing any ndamage to the existing utilities including hire of tool
and plant,conveyance of tools and materials, bailing out water providing caution boards
ribbon fencing etc completge as per direction of deptl. Officer including the cost of pipe and CID
joints | 4 | each | 5,000 ₹20,000 Lowest | 7,847.32 ₹31,389.28 |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 79.55 | kg | 90 ₹7,159.32 Lowest | 116.4 ₹9,259.39 |
| 1.01 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 6 | cum | 600 ₹3,600 Lowest | 1,288.62 ₹7,731.72 |
Tender Value
₹9.3 L
EMD Value
₹23,295
Closing Date
18 Oct 2025, 11:00 amClosed
Assistant Executive Engineer
ASSISTANT EXECUTIVE ENGINEER MI SUBDIVISION ALUVA
Annual Maintenance
2025_Irrig_807443_1
IRR/IA/TR/4019/2025_5_1_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
240 days
Aluva
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,055
Yes
₹23,295
Yes
13 Nov 2025
9 Oct 2025
21 Oct 2025
9 Oct 2025
18 Oct 2025
9 Oct 2025
9 Oct 2025 - 18 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1345707.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 2.05 MB
Tendernotice_3.pdf
PDF • 0.08 MB
Tendernotice_4.pdf
PDF • 0.08 MB
BOQ_1345707.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .