Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Finance | -30.01% | ₹10.3 L | L1 | Admitted-Finance |
| 2 | L2₹10.3 L+₹4,556.21 (0.44%)Admitted-Finance | -29.70% | ₹10.3 L+₹4,556.21 (0.44%) | L2 | Admitted-Finance |
| 3 | L3₹11.0 L+₹73,634.32 (7.16%)Admitted-Finance | -25.00% | ₹11.0 L+₹73,634.32 (7.16%) | L3 | Admitted-Finance |
| 4 | L4₹11.4 L+₹1.1 L (10.8%)Admitted-Finance | -22.44% | ₹11.4 L+₹1.1 L (10.8%) | L4 | Admitted-Finance |
| 5 | L5₹14.0 L+₹3.7 L (35.7%)Admitted-Finance | -5.00% | ₹14.0 L+₹3.7 L (35.7%) | L5 | Admitted-Finance |
Tender Value
₹14.7 L
EMD Value
₹29,400
Closing Date
9 May 2026, 2:00 pmClosed
Chief Engineer, VPA
Chief Engineer office, 3rd floor, AOB, VPA, A.P Ph. 0891 2873327, 3333, 3335
Providing Water proofing treatment to roof slabs of Operation Theatre, Time keeper room and entrance of Causality and OP blocks in GJH at SG Puram.
2026_VPT_275019_1
IENG/CP/EE (North)/T/178 Dt. 17.04.2026.
Open Tender
Civil Works
Percentage
60 days
VPA
As per NIT
2 documents required · 2 mandatory
₹472
Yes
₹29,400
Yes
14 Jul 2026
17 Apr 2026
11 May 2026
17 Apr 2026
9 May 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: etc., as required and as directed by Engineer-in-charge, complete. All labour and materials.
(a) After surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/sqm.(b) Laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.
(c) Third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around.
(d) Fourth and final layer of brick tiling with cement mortar (which will be paid for separately).
For the purpose of measurement the entire treated surface will be measured. | 2,101.75 | 1 m2 | 624.83 | ₹13,13,236.45 |
| 2 | Brick work with common burnt clay machine moulded perforated modular bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) etc., as required and as directed by Engineer-in-charge, complete. All labour and materials. | 16.13 | 1 m3 | 8,110.71 | ₹1,30,825.75 |
| 3 | Providing Cement plastering (fine sand) 12mm thick of mix 1:4 (1 Cement : 4 sand) including raking out joints, cleaning the surface curing etc., as required and as directed by the Engineert-in-charge, complete. All labour and Materials. | 81.6 | 1m2 | 314.77 | ₹25,685.23 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_321215.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .