Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19,490Admitted-Finance | ₹19,490 | L1 | Admitted-Finance |
| 2 | L2₹24,067+₹4,577 (23.5%)Admitted-Finance | ₹24,067+₹4,577 (23.5%) | L2 | Admitted-Finance |
| 3 | L3₹25,290+₹5,800 (29.8%)Admitted-Finance | ₹25,290+₹5,800 (29.8%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S FANCY ELECTRIC AND STEEL FABRICATORS L3 | ishaq electricals L2 | M/s SAJID ENGINEERING WORKS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Mechanical transportation, loading, unloading of transformer using minitruck like Tata mobile, Bolero camper or similar from site to workshop and then from workshop to site after necessary repairs. | 2 | Job | 2,160 ₹4,320 | 2,142 ₹4,284 | 800 ₹1,600 Lowest |
| 2.00 | Dismantling of 33/0.4 kv or 11/0.4kV transformer by way of disconnecting of all HT and LT connections, opening of top lid, draining out of T. Oil and its safe placement for further refilling, taking out of coils after removal of core assembly, etc. Job also includes detaching of core HV/LV coils. | 1 | Job | 2,900 ₹2,900 | 2,651 ₹2,651 | 1,500 ₹1,500 Lowest |
| 3.00 | Providing and fitting of finished new aluminium wire windings with insulation in place of damaged windings labour costs, etc, (HV/LV) - per Kg of windings. (weight of each coil = 2.5 kg approx., total no.of damaged coils = 6) | 15 | Kg | 790 ₹11,850 | 722 ₹10,830 Lowest | 850 ₹12,750 |
| 4.00 | Deduct the cost of old aluminium scrap retreived from the motor @80% or as per actual | 12 | Kg | 200 ₹-2,400 | 153 ₹-1,836 Lowest | 180 ₹-2,160 |
| 5.00 | Dehydration of transformer core in Electrically operated oven and filtration of old oil | 70 | Ltr. | 12 ₹840 | 11.9 ₹833 | 10 ₹700 Lowest |
| 6.00 | Providing of Transformer oil (preffered make: Indian oil/HPCL/Power oil) | 20 | Ltr. | 164 ₹3,280 | 139 ₹2,780 | 135 ₹2,700 Lowest |
| 7.00 | Providing and fitting of rubber gasket with nuts and bolts to the transformer tank. | 1 | Job | 800 ₹800 | 1,020 ₹1,020 | 650 ₹650 Lowest |
| 8.00 | Complete assembling of the transformer by way of fitting of HT/LT coils in the tank. Job further includes closing of the transformer lid by way of fitting of existing nuts/bolts and gaskets. Refilling of T.oil upto required level in tank. Reconnecting of HT/ LT connections and testing. The job includes P/F of HT fuse for the drop out set. | 1 | Job | 3,700 ₹3,700 | 3,505 ₹3,505 | 1,750 ₹1,750 Lowest |
Tender Value
Refer Docs
Closing Date
23 Apr 2026, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
MID Baramulla
Repairing of 63 KVA HT transformer at Lift irrigation scheme Ramdayal of MISD Pattan.
2026_IFC_308020_10
eNIT No. 05 of 2026-27
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Pattan
Please refer Tender documents.
2 documents required · 2 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Yes
5 May 2026
17 Apr 2026
24 Apr 2026
17 Apr 2026
23 Apr 2026
17 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Mechanical transportation, loading, unloading of transformer using minitruck like Tata mobile, Bolero camper or similar from site to workshop and then from workshop to site after necessary repairs. | - | Job | - | - |
| 2 | Dismantling of 33/0.4 kv or 11/0.4kV transformer by way of disconnecting of all HT and LT connections, opening of top lid, draining out of T. Oil and its safe placement for further refilling, taking out of coils after removal of core assembly, etc. Job also includes detaching of core HV/LV coils. | - | Job | - | - |
| 3 | Providing and fitting of finished new aluminium wire windings with insulation in place of damaged windings labour costs, etc, (HV/LV) - per Kg of windings. (weight of each coil = 2.5 kg approx., total no.of damaged coils = 6) | - | Kg | - | - |
| 4 | Deduct the cost of old aluminium scrap retreived from the motor @80% or as per actual | - | Kg | - | - |
| 5 | Dehydration of transformer core in Electrically operated oven and filtration of old oil | - | Ltr. | - | - |
| 6 | Providing of Transformer oil (preffered make: Indian oil/HPCL/Power oil) | - | Ltr. | - | - |
| 7 | Providing and fitting of rubber gasket with nuts and bolts to the transformer tank. | - | Job | - | - |
| 8 | Complete assembling of the transformer by way of fitting of HT/LT coils in the tank. Job further includes closing of the transformer lid by way of fitting of existing nuts/bolts and gaskets. Refilling of T.oil upto required level in tank. Reconnecting of HT/ LT connections and testing. The job includes P/F of HT fuse for the drop out set. | - | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_998716.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .