Loading…
Loading…
Tender Value
₹72.7 L
EMD Value
₹1.5 L
Closing Date
5 Sept 2026, 5:30 pm
The Engineer-in-Chief,PR,PMGSY,vIJAYAWADA
Opp.PWD Grounds Bandar Road MG Road Vijayawada,A.P
Package No.AP3202-L021-Tada-Satyavedu Road to Vanellore Village in Sathyavedu Mandal ofTirupati Dist.Estt. Cost Rs.104.00 Lakhs
2026_ENCPR_149306_1
Nit No.141/2026-27 dt.7.8.2026of the Engineer-in-Chief PR,PMGSY,Vijayawada (1st Call)
National Competitive Bid
Civil Works - Roads
Percentage
365 days
Sathyavedu
As per BID Documents
2 documents required · 2 mandatory
₹0
₹1.5 L
O/o SE PR Chittoor
22 Aug 2026
22 Aug 2026
10 Sept 2026
22 Aug 2026
5 Sept 2026
22 Aug 2026
22 Aug 2026 - 5 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Name of the Work: AP3202-L021-Tada-Satyavedu road to Vanellore village in Sathyavedu mandal in Tirupati District Estimate Cost of Rs. 104.00 Lakhs+ Rs.7.98 Lakhs for Routine Maintenance. | |||||
| 1.01 | Road Portion | - | - | - | - |
| 1.02 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD including contractors profit & Over head charges, but excluding GST etc., complete. | 2,520 | Sqm | 2.54 | ₹6,400.8 |
| 1.03 | Construction of embankment with approved material with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seigniorage Charges etc., complete. | 500 | Cum | 234.24 | ₹1,17,120 |
| 1.04 | Construction of granular sub-base by providing well graded material(Table 400.1. A) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and Seigniorage etc., complete. | 613.43 | Cum | 1,895.66 | ₹11,62,854.71 |
| 1.05 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH including contractors profit & Over head charges, but excluding GST and Seigniorage etc., complete. | 557.44 | Cum | 2,938.98 | ₹16,38,305.01 |
| 1.06 | Providing and applying primer coat with bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) including contractors profit & Over head charges, but excluding GST etc., complete. for Prime Coat | 3,322.5 | Sqm | 45.64 | ₹1,51,638.9 |
| 1.07 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,) including contractors profit & Over head charges, but excluding GST etc., complete. for Tack Coat | 3,322.5 | Sqm | 15.37 | ₹51,066.83 |
| 1.08 | Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material of 20 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates as per Table 500.15 of MORD using VG 30 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable Hot Mix plant (By mechanical means), laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 507 MORD'2014, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | 3,322.5 | Sqm | 211.07 | ₹7,01,280.08 |
| 1.09 | Construction of Shoulders by providing selected earth having MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively. and, spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to achieve the desired density, complete as per Technical Specification Clause 407 MORD and clause 305 & 305.4.4 MORTH ncluding overhead charges & Contractor profit etc., Complete, but excluding GST and seigniorage charges . | 551.25 | Cum | 390.17 | ₹2,15,081.21 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.58 MB
SBD141.pdf
Tender Documents • 0.48 MB
BOQ_234921.xls
BOQ • 0.35 MB
Schnitno141.pdf
Additional Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].