Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
11 May 2026, 11:00 amClosed
Executive Engineer
EE PWD Daporijo Division
Academic Block, 25 bedded (Bunk Bed) Hostel, 01 type II teacher qtrs, kitchen cum dinning hall
2026_PWDAP_3439_1
DD/NIT/EDN/2025-26/21
Open Tender
Civil Works - Building
Item Rate
730 days
Pilung Maling
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
EE PWD Division Daporijo
₹1.9 L
Daporijo
6 May 2026
4 May 2026
11 May 2026
4 May 2026
11 May 2026
4 May 2026
9 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SH: Academic block. | - | - | - | - |
| 2 | Excavation in decomposed or soft rock with or without blasting including disposal of the same lead upto 50 m and lift upto 1.50 m. | 87.5 | Cum | - | - |
| 3 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 250.13 | Cum. | - | - |
| 4 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 225.25 | Cum. | - | - |
| 5 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 91.08 | Cum. | - | - |
| 6 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 103.94 | Cum. | - | - |
| 7 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : | - | - | - | - |
| 8 | b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc.up to floor two level. | 78.66 | Cum. | - | - |
| 9 | Centring and shuttering including strutting proping etc. and removal of form work for: | - | - | - | - |
| 10 | a) Foundation and plinth | 239.66 | Sqm | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.33 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.08 MB
SBDPM.pdf
Tender Documents • 1.59 MB
BOQ_3636.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .