Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 LAccepted-AOC D NO 35 14 13 1 RP PETA GAVARA KANCHARAPALEM VISAKHAPATNAM 530008 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530008 | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹23.5 L+₹1.6 L (7.54%)Rejected-Finance MIG 330 MADHAVADHARA VUDA COLONY VISAKHAPATNAM 530 018 | VISAKHAPATANAM | ANDHRA PRADESH | 530018 | L2 | Rejected-Finance Being not L1 bidder | |
| 3 | L3₹25.8 L+₹3.9 L (17.8%)Rejected-Finance DOOR NO 15 1 141 BHAVANA ENCLAVE 1 NEAR HOTEL GRAND BAY MAHARANIPETA NOWAROJI ROAD VISAKHAPATNAM 530002 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530002 | L3 | Rejected-Finance Being not L1 bidder | |
| 4 | L4₹27.5 L+₹5.6 L (25.5%)Rejected-Finance ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | L4 | Rejected-Finance Being not L1 bidder | |
| 5 | L5₹31.8 L+₹9.9 L (45.3%)Rejected-Finance | L5 | Rejected-Finance Being not L1 bidder |
Tender Value
₹40.5 L
EMD Value
₹81,000
Closing Date
15 Dec 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer Utility-I Visakhapatnam
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
CERTAIN REPAIR/MAINTENANCE OF AC PLANTS AT INS DEGA UNDER AGE E/M NO-II OF GE(U-I)(V).
2022_MES_563866_1
8481/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Garrison Engineer Utility-I Visakhapatnam
CLASS D
8 documents required · 8 mandatory
₹500
Garrison Engineer Utility-I
₹81,000
Yes
26 Dec 2022
18 Nov 2022
17 Dec 2022
18 Nov 2022
15 Dec 2022
2 Dec 2022
Amount
M&L for carry out the descaling of shells and tubes water cooled type condenser by disconnecting the inlet and out water connections and providing of dummy to the inlet and outlet and descaling the condenser by circulating the circulated descaling agent R-111 or equivalent chemical or organic compound at the proper ratio circulated chemical till remove complete scale deposite inside the copper tubes, and opening the both end cover by the condenser brushing the copper tubes with appropriate size nylon brush remove complete scale and flushing out the tubes & degreasing with caustic soda solution & flushing and boxing up the both end covers connecting up the water inlet & outlet connections including renewal by damaged rubber gaskets and leak testing the joints for water leakage, shells & tube condensers for the following capacity AC Plants and of make : Voltas / Bluestar all as directed by Engineer-in-charge.
M&l for carry out leak test for the chiller type system by extracting the existing available gas from the system to separate cylinder storing and pressure testing the complete system with dry nitrogen and check the leaks , identifying the leaks, rectification of leaks by brazzing/ welding at the leak points/replacing by damaged valve gland package/ gasket etc, and after rectification of all the leaks, pressure testing the complete system up to 300 PSIG at high side , 200 PSIG at low side of the system, holding the pressure for 24 hrs and vaccumising the complete system after releasing the dry nitrogen and charging the refrigerent gas to system and testing & comissioning the plant checking, all shells & condensor control for the following capacity of make : Voltas/ Blue star all as specified & directed by Engineer-in-charge.
Supply only charge refrigerant gas 134 A (environmental friendly) for charging including leak testing the system all as specified & directed by Engineer-in-charge Make : Mafron/ Freon/ Floron
S & F in repair V belts for AHU drive set in proper alignment of following Size :- Make : Ecodrive / Poly-F / Hilton / Optimax / Dunlop
V belt section A- 28
V belt Section A- 31
V belt section A-35.
V belts section B- 54
M&L for servicing / cheking/inspection AHU of following capacity of AC plant, with and including dismantling units sheet metal parts, blowing out dust, chemical cleaning by spraying the organic based scale removing agent vaniklin at the appropriate ratio till removal of complete dust & scale deposits in the fins area across the evaporator coil, flushing through for proper air flow across the coil, cleaning of expansion valve, cleaning of air filters, cleaning the motor & greasing of blower motor, cleaning the condensor tray & drain pipe, renewal of rusted bolt,nuts and applying one coat of synthetic emamel paint over blower motor, water drain lines & applying one coat of synthetic enamel paint over coat of primer on all other rusted portion, replacement of the pre filters, including checking the alignment of the drive set and testing commisioning the AHU's of the following capacity all as specified as directed .
Up to 5000 CFM.
5000 to 22500 CFM.
22500 to 40000 CFM
M&L for dismantling the defective induction motor of any make 415 V, 4 pole up to 1200-1500 RPM, 50Hz of any duty or any class of insulation from the bed duly coupled with pump / compressor /in AHU, transporting to work shop, removing burnt out winding from stator / motor, rewinding with suitable gauge of super enamelled copper wire of approved make and replacing drive end and non drive end bearings , insulation materials, varnishing, heating reassembling, testing and commissioning for the following capacity all as directed. Note: - Motors removed for rewinding shall be overhauled completely by replacing defective bearings and the quoted rate shall be deemed to be inclusive of the same.
above 7.5 and up to 12.5 HP
M&L for servicing of the defective VFD of following capapcity AC Plants including replacement of minor parts all as directed.
Supply and fixing the following spares for carrying out repairs to VFD of capacity 150 TR/ 80 TR Make : M/s Voltas/ M/s blue star/ M/s Carrier/Denfoss.
Top Fan
Mixing Fan
Heat Sink Fan
Graphical LCP
HF Card
Gate drive card
Inrush Card
Rectifier
Carrying out repairs and Maintenance , attending to breakdown of 70 to 150 TR variable speed screw type liquid chiller central AC plant of Make : Voltas / Bluestar as per the following scope of the work given below including carrying out general repairs and periodical servicing to ensure smooth and trouble free operation of plants to the entire satisfaction of users/department all as directed by Engineer-in-charge.
Scope of Work : (a) Periodical monitoring / Inspecting the complete AC plant and carrying out preventive/ periodical maintenance to ensure smooth functioning of AC plant.The periodical inspection for preventive maintenance shall be carried out by authorised technician/service engineer of OEM once in a quarter other than breakdown calls for monitoring the operational condition of AC plant including preventive maintenance/breakdown calls whenever required. Each preventive maintenance & breakdown call if any will be measured Job
(b) Visual inspection for oil traces, Air heat exchanger (condenser) cleaning, check for removed protection devices, and improperly closed doors/ covers, check that the temperature difference between the heat exchange inlet and outlet is correct, check the refrigeration system, motors and starters for performance and healthy condition of plant.
(c) Checking the system for leaks and rectification of leaks if any.
(d) Taking a set of readings and evaluating the same to ensure the satisfactory performance of the plant.
(e) Checking the refrigeration control system for operation and adjusting the settings as and when required.
(f) General Cleaning the evaporator and condensing coils
(g) General Lubrication of the bearings of motors, pumps and fans as and when required.
(h) Inspection of belts, which includes adjusting the tension including replacement if required.
(l) Filling only the refrigerant as a result of leak arising from the system due to standard wear and tear.
(m) Repairing/ replacing the components of the equipment at site or at workshop as required
(n) To check proper functioning of microprocessor and take control test.
(o) Intimating any breakdown requiring specific major repairs/overhauling to the contractor/ department for immediate rectification of defect.
(p) Attending the complaints/ breakdown whenever received by user /JE /Engineer in charge and attending the complaint for same within 12 hrs of receipt.
(t) The repair/replacement of all spare parts like ICVC Boards, compressor / fan motor rewinding, electrical switch gears, contactors, PCB, refrigerant gas etc., are not in the scope. These items shall be measured and paid separately under relevant items.
(u) Any minor spares/ repairs items which are required to keep the plant in operational are deemed to be included in scope.
Supply & Fixing/ filling in repair following spares of 70 to 150 TR capacity variable speed screw type liquid chillar Make : Voltas/ Blue star
Oil cartridge filter
Compressor oil Make : HP Sheetal, Emkarate, Speed Air, Z Premium, Vacpac oil, MAG1,Denfos
Temperature sensor
LP sensor
Chillar flow switch with connection pipe
Pressure guage 0-7 kg/cm2
MNX 25 contactor 220 V ,50Hz Make : L&T / Schneider / C&S / GE
MNX 40 contactor 220 V ,50Hz Make : L&T / Schneider / C&S / GE
MNX 12 contactor 220 V, 50Hz Make : L&T / Schneider / C&S / GE
MNX relay 9-14 AMPS Make : L&T / Schneider / C&S / GE
Timer Star/ delta of 63 Amp to 100 Amp capacity Make : L&T / Schneider / C&S / GE
Auxillary block Make : L&T / Schneider / C&S / GE
Drier assly complete suitable for above model package unit
n) Ventilating fan suitable for HVAC drive panel of 132 KW /200 HP of the AC plant
M&L for carry out the repair to cooling tower fan motor 7.5HP/5HP flange mounted extended shaft type, including taking down from position, transporting to local work shop, dismantling the motor, replacing damaged unserviceable shaft, bearings, rusted nuts & bolts including servicing motor by motor varnishings to winding, external painting of motor, providing PVC cap for top portion of motor for main protection etc and bringing the assembly back and installation to position and testing comissioning complete all as directed by Engineer-in-charge.
M&L for replacing the cooling tower motor base frame, base plate, Nut & bolts with new all as per the existing size and shape as suitable 80 to 150 TR capacity.
M&L for taking down the defective unserviceable fan motor and assembly from the cooling tower and supply and fix the new fan motor of 7.5 HP, 3 phase,720RPM, 440V,50Hz of extended type shaft, flange mounted with IP-55 Degree of protection, weather proof along with fan assembly with 1300mm sweep by 04 fan blades with suitable hub assembly clamps nut & bolts etc. Including connecting the power supply and testing all as specified as directed by Engr-in-charge
Complete overhauling/servicing of FRP cooling tower, removal of complete scales, dirt etc. by using chemicals, cleaning the slump louvers, PVC fills, fan assembly, renewal of spray nozzles with connected pipe, renewal of nuts and bolts, leak arresting of the FRP tank and complete painting of the cooling tower as per the standard practice. Repairing to the leakage portion by lining with FRP material including replacement of rusted nut and bolts and replacing of bird screens at air intake portion and testing and commissioning of the cooling tower of the follwoing capacity as specified as directed.
M & L for taking down the damaged direct coupling unit of split casing pumps of chilled water/condenser water and S & F drive set of suitable size with necessary boring to the motor and pump shaft size including making of shaft key way slots and matching of proper alignment to the drive set and testing and commissioning of the drive set upto 25HP complete all as directed by Engineer-in-charge.
M & L for carrying out painting with one coat of synthetic enamel paint to central type Air conditioning plant including compressor, condensers, chillers, Refrigeration lines Condenser water line, pumps, motors foundation frame valves etc as per the existing colour code all as directed by Engr-In-Charge. Note:-1. Painting should be done with existing colour codes. 2. Quotated rate shall deemed to be included for preparation of old painted surface and applying one coat of zinc chrome primer over rusted portion all as directed.
3X25 TR (Indoor & Outdoor of Air cooled plant)
M&L for complete servicing/ repairs to package Air conditioning unit of Make: M/S Voltas of capacity 5.5 TR to 10 TR compressor units, with and including servicing of three Nos outdoor units complete by blowing out the dust, spraying the organic based scale removing agent at the appropriate ratio to the condenser fan area, till removal of complete scales and dust, flushing through for proper air flow across the coil, checking of all electrical connections, greasing of motor bearing, renewal of all defective copper tubes from indoor unit to outdoor unit, replacement of corroded sheet metal screws, applying synthetic enamal paint over a coat of primer on the rusted portion, reassembling the sheet metal parts and testing the unit all as specified and as directed by the Engineer-in-charge. Note : Required copper pipe shall be measured and paid under relevant Sch "A" items.
M&L for complete servicing/ repairs to Air cooled central air conditioning unit of Make: M/s voltas of capacity 3 x 11 to 11.6 TR consisting of three Nos 11 to 11.60 TR compressor units, with and including servicing of three Nos outdoor units( Each will be measured as one unit) complete by blowing out the dust spraying the organic based scale removing agent at the appropriate ratio to the condenser fin area , till removal of complete scales & dust , flushing through for proper air flow across the coil, checking of all electrical connections , greasing of motor bearing, renewal of all defective copper tubes from indoor unit to out door unit, replacement of corroded sheet metal scews, applying synthetic enamal paint over a coat of primer on the rusted portion, reassembling the sheet metal parts and testing the unit as specified and as directed by the Engineer-in-charge. Note : Required copper shall be measured and paid under relevant Sch "A" items.
Supply and charge refrigerant gas R-22 / R 407 C (environmental friendly) including leak testing the system, arresting the leaks with necessary materials like gasket/ 'o' rings/ washers all as directed by Engineer-in-charge. Make : Mafron/ Freon/ Floron
M&L for complete leak testing the indoor and outdoor units , refrigerant pipe with nitrogen gas, locating the leaks, rectify the leak by brazing/ welding and pressure testing the complete system for the capacity up to 5.5 to 11.60 TR air cooled package AC system all as specified and as directed by engineer-in-charge.
Carrying out repairs and Maintenance , attending to breakdown of 5.5 TR to 25 TR capacity package type, chiller plant, water cooled and air cooled AC plant as per the following scope of the work given below including carrying out general repairs/ servicing to ensure smooth and trouble free operation of plants to the entire satisfaction of users/department all as directed by Engineer-in-charge.
Scope of Work : (a) Periodical monitoring / Inspecting the complete AC plant and carrying out preventive/ periodical maintenance to ensure smooth functioning of AC plant.The periodical inspection for preventive maintenance shall be carried out by authorised technician/ service engineer of OEM once in a quarter other than breakdown calls for monitoring the operational condition of AC plant including for preventive maintenance/breakdown calls whenever required. Each preventive maintenance & breakdown call if any will be measured Job
(b) Visual inspection for oil traces, Air heat exchanger (condenser) cleaning, check for removed protection devices, and improperly closed doors/ covers, check that the temperature difference between the heat exchange inlet and outlet is correct, check the refrigeration system, motors and starters for performance and healthy condition of plant.
(c) Checking the system for leaks and rectification of leaks if any.
(d) Taking a set of readings and evaluating the same to ensure the satisfactory performance of the plant.
(e) Checking the refrigeration control system for operation and adjusting the settings as and when required.
(f) General Cleaning the evaporator and condensing coils
(g) General Lubrication of the bearings of motors, pumps and fans as and when required.
(h) Inspection of belts, which includes adjusting the tension including replacment if required.
(l) Filling only the refrigerant as a result of leak arising from the system due to standard wear and tear.
(m) Repairing/ replacing the components of the equipment at site or at workshop as required
(n) To check proper functioning of microprocessor and take control test.
(o) Intimating any breakdown requiring specific major repairs/overhauling to the contractor/ department for immediate rectification of defect.
(p) Attending the complaints/ breakdown whenever received by user /JE /Engineer in charge and attending the complaint for same within 12 hrs of receipt.
(t) The repair/replacement of all spare parts like ICVC Boards, compressor / fan motor rewinding, electrical switch gears, contactors, PCB, refrigerant gas etc., are not in the scope. These items shall be measured and paid separately under relevant items.
(u) Any minor spares/ repairs items which are required to keep the plant in operational are deemed to be included in scope.
Supply and fixing the following spares for carrying out repairs to package air conditioning unit of M/s Voltas/ M/s Blue star/ M/s Carrier.
Sealed compressor of capacity 5.5 to 10 TR Make: Dafoss/ Copeland/ Carrier / Kirloskar
Sealed compressor of capacity 11.6/ 12 TR Make: Dafoss/ Copeland/ Kirloskar/Carrier
Fan blade suitable for above model package unit
Fan motor suitable for above model package unit
Drier assly complete suitable for above model package unit
Compressor oil suitable for scroll type hermaticaly sealed type compressor Make : Dafoss/ Copel /Carrier
Chillar flow switch with connection pipe
Pressure guage 0-7 kg/cm2
MNX 25 contactor 220 V ,50Hz Make : L&T / Schneider / C&S / GE
MNX 40 contactor 220 V ,50Hz Make : L&T / Schneider / C&S / GE
MNX 12 contactor 220 V, 50Hz Make : L&T / Schneider / C&S / GE
MNX relay 9-14 AMPS Make : L&T / Schneider / C&S / GE
Timer Star/ delta of 63 Amp to 100 Amp capacity Make : L&T / Schneider / C&S / GE
Auxillary block.
M & L for taking down the corroded and unserviceable butterfly valves of size 80 mm and its counter flanges, nut and bolts from the exisiting position and S/F new butterfly valve of size 80 mm with counter flanges, nut and bolts etc including welding and testing the leaks cpmllete all as specified and directed by Engineer-in-Charge.
M & L for taking down the burnt out condenser/ indoor/ outdoor unit fan motor and carrying out rewinding/including renewal of bearings/bushes of the motor and fixing back to the position and testing and commissioning the unit of package type unit of capacity upto 12TR
M & L for taking down the burnt condenser/ indoor/ outdoor unit fan blade and supply and fix new fan blade for the unit of packaged unit of capacity upto 12TR
M & L for taking down the damaged refrigerant copper pipe and S/F new copper pipe of L type including necessary elbows/sockets/tee brackets/ clamps and bracing for the following size for air cooled package units of the following size :-
1/2 inch copper pipe
5/8 inch copper pipe
3/4 inch copper pipe
7/8 inch copper pipe
S & F insulation foam of tubular type for refrigeration pipe which run indoor-to-outdoor with necessary adhesive tapes for the following size
1/2 inch copper pipe
5/8 inch copper pipe
3/4 inch copper pipe
7/8 inch copper pipe
M & L for taking down the blower assembly of package type AC plant and taking out the damaged/worn out AHU shaft assembly and bearings and transporting to workshop to carry out the repair/replacement of the AHU shaft, replacement of pillar block bearing units and transporting back to site and installing into the position, matching of proper alignment and testing and commissioning of blower unit of capacity 5.5TR/8.6TR
Supply only LED indicator bulb(red/green )colour of suitable size as directed. Make : L&T/ Havells/CG.
Supply and fix in replacement MS pipe of size 80mm dia as required and directed complete with flange,bend whichever required for fixing complete in all respect including welding work as required on site as directed by Engr-in-charge. Make- JINDAL PIPES/ TATA/ BST/ PRAKASH TUBES/ OSWAL.
Supply and fix in replacement MS pipe of size 150mm dia as required and directed complete with flange,bend whichever required for fixing complete in all respect including welding work as required on site as directed by Engr-in-charge. Make- JINDAL PIPES/ TATA/ BST/ PRAKASH TUBES/ OSWAL.
M&L for taking down the defective unserviceable oil pressure deferential cut out unit and S&F new oil perssure deferential cut out unit including necessary wiring and testing & comissioning all as directed. Make:-DANFOSS/RANCO
Ditto all as per item no. 32.00 above but High pressure cut out.
Ditto all as per item no. 32.00 above but low pressure cut out .
M&L for taking down the defective fan motor of flange mounted extended type shaft upto 3 HP, 3 phase, 415 volts, 6 pole, 900 RPM, 50Hz,along with fan assembly and dismantling the motor complete cleaning with CTC, including rewinding the motor with appropriate gauge copper wire, necessary paper, tape, terminal etc., insulation shall be of class 'F' and degree of protection shall be IP-55, the work includes renewal of all corroded bolts & nuts, terminal block and assembling, fixing in position, fixing of fan blade and alignment of the fan blade for the suitable air throw of the cooling tower , testing & commissioning the cooling tower motor, all as specified and as directed by the Engineer-in-charge.
Material and labour for dismantling the defective induction motor of capacity 9.3 to 30 KW of any make 415 V any duty or any class of insulation , taking down from bed duly coupled with pump/ in AHU drive , transporting to work shop, removing the burnt out stator, complete cleaning the stator, remove the carbon and cleaning with CTC/petrol and winding the stator with super enamelled copper wire of appropriate gauge as per the existing standard, varnishing and baking , including replacing of both end bearings, and assembling, transporting back to site, fixing back to position coupling with pump/AHU motor including match proper aligment with drive set and testing & commisioning the motor .
S & F of pre Air filter of 90 down 10 micro washable made out of fiber visco type size of 500x400x50 mm Make : Honycomb / Europack
All as per item No. 37.00 but size of 500x500x50 mm
All as per item No. 37.00 but size of 600x600x50 mm
All as per item No. 37.00 but size of 500x600x50 mm
All as per item No. 37.00 but size of 600x400x50 mm
All as per item No. 37.00 but size of 400x400x50 mm
S & F PVC Fills size of 600x300x150 mm for FRP Cooling tower
M & L for carrying out the servicing/overhauling of split casing type pumpset, including dismantling and taking out the worn out parts such as wearing, bearings, bushes and gland packing etc, checking the shaft, cleaning the complete pump, assembling the pump set with new parts such as wearing, bearings,bushes, gland packing, gaskets and renewal of rusted stud bolts and refixing in position and matching good alignment including replacement of coupling rubber and testing and commissioning of capacity up to 20 KW all as specified as directed by Engr-in-charge
M/s.DSRK CONSTRUCTIONS
SRIESWARI ENTERPRISES
GS ENGINEERS
COOL CONTROL
SRIVALLI ENGINEERS
KRISHNA ENGINEARING
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .