| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹7.5 L+₹1.3 L (21.0%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | VALAYAM L2 | POONJAR LABOUR CONTRACT CO OPERATIVE SOCIETY LTD L1 |
|---|---|---|---|---|---|
| 1.00School Maintenance | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 5.76 | cum | 3,634 ₹20,931.84 | 1,475 ₹8,496 Lowest |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.29 | cum | 2,107 ₹4,829.24 | 566.4 ₹1,298.19 Lowest |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 60 | sqm | 350 ₹21,000 Lowest | 377.6 ₹22,656 |
| 1.00 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 180 | kilogram | 115 ₹20,700 Lowest | 135.7 ₹24,426 |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 508.42 | kg | 185 ₹94,057.7 | 141.6 ₹71,992.27 Lowest |
| 1.01 | 12.50:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 111.25 | sqm | 840 ₹93,450 Lowest | 920.4 ₹1,02,394.5 |
| 1.01 | OD62986/2026-2027:Providing and fixing 200 mm semi circular PVC 4kgf/cm2 rain water gutter pipe with iron
brackets with 32x5 mm size flat, screws and washers etc., including making necessary
connections with rain water pipes etc. complete. | 18.5 | metre | 500 ₹9,250 | 413 ₹7,640.5 Lowest |
| 1.01 | 50.18.9.15.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 40 mm dia 6 Kgf/cm2 - External work - Exposed on wall | 6 | metre | 420 ₹2,520 | 247.8 ₹1,486.8 Lowest |
| 1.01 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 104 | sqm | 390 ₹40,560 | 171.1 ₹17,794.4 Lowest |
Tender Value
₹7.6 L
EMD Value
₹19,054
Closing Date
24 Jul 2026, 2:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer LID and EW Division Kottayam
Annual Plan-DPK 291/27-Erumeli Division Koovakkavu GHS Infrastructure Development-General Civil Work
2026_LSGD_860809_23
1/2026-27/AEE/LID and EW
Open Tender
Civil Works - Others
Item Rate
365 days
Kottayam
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,680
Yes
₹19,054
Yes
28 Jul 2026
17 Jul 2026
25 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1School Maintenance | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.003 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | - | sqm | - | - |
| 1.004 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kilogram | - | - |
| 1.005 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | - | kg | - | - |
| 1.006 | 12.50:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | - | sqm | - | - |
| 1.007 | OD62986/2026-2027:Providing and fixing 200 mm semi circular PVC 4kgf/cm2 rain water gutter pipe with iron
brackets with 32x5 mm size flat, screws and washers etc., including making necessary
connections with rain water pipes etc. complete. | - | metre | - | - |
| 1.008 | 50.18.9.15.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 40 mm dia 6 Kgf/cm2 - External work - Exposed on wall | - | metre | - | - |
| 1.009 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | - | sqm | - | - |
stage.html
html • 0.02 MB
finance_1456023.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.18 MB
affida.pdf
Tender Documents • 0.23 MB
viewsbd.pdf
Tender Documents • 2.07 MB
pa.pdf
Tender Documents • 0.25 MB
BOQ_1456023.xls
BOQ • 0.32 MB
epay.pdf
Tender Documents • 0.24 MB
feere.pdf
Tender Documents • 0.33 MB
fot.pdf
Tender Documents • 0.24 MB
ip.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .