| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹2.5 Cr | L1 | Accepted-AOC First Lowest |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹5.1 L
Closing Date
4 Mar 2024, 2:00 pmClosed
S.E. Irrigation Works Circle Varanasi
S.E. Irrigation Works Circle sigra Varanasi
Restoration of Internal and Outer Section and Pucca Work and Demarcation of Canal Land of Garaura Dy from Km. 0.000 to Km. 14.100 Situated in District Bhadohi.
2024_UPIDC_897344_7
05/SE/2023-24
Open Tender
Civil Works
Item Rate
120 days
Vill Veerapur Block Abholi Bhadohi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹5.1 L
16 Mar 2024
27 Feb 2024
4 Mar 2024
27 Feb 2024
4 Mar 2024
27 Feb 2024
Amount
Dismantling brick work or stone work in lime or cement mortar including stacking of materials as directed by Engineer-in-charge within a distance of 60 M.
Earth work for road diversion including proper compaction, dressing, labour and T&P etc. required for proper completion of work. (for diversion)
Earth work in excavation of foundation in ordinary soil /sand loam, clay or sand including lift up to 1.5 m and lead up to 30m including filling, watering, ramming of excavated earth into the foundation dressing and manual compaction directed by engineer-in-charge.
Laying C.C. 1:4:8 with coarse sand, dala stone grit of 20-40mm size including cost of all material, labour and T&P etc. required for proper completion of work.
1st class brick work in 1:4 C.M. with coarse sand and cement including cost of all material, labour and T&P etc. required for proper completion of work.
Centering and shuttering for R.C.C work 3 to 5 m span including cost of all material, labour and T&P etc.
Laying R.C.C 1:1.5:3 with coarse sand, dala stone grit of 10 - 20mm size including cost of all material, labour and T&P etc. required for proper completion of work.
Laying C.C. 1:1:2 in wearing coat over slab & coping including cost of all material, labour and T&P etc. required for proper completion of work.
Providing Cutting, bending & binding of steel bar in R.C.C. work including cost of labour and T&P etc. required for proper completion of work.
Struck deep pointing in 1:2 C.M. on brick work including cost of all material, labour and T&P etc. required for proper completion of work.
Fabrication of Mild steel/iron work in grill, Gates, railing, Door and window frames including cutting, drilling, welding/revetting & hinges, where necessary and fixing in position including cost of all material, labour, T&P etc. required for proper completion of work with one coat of red oxide primer
Preparation of subgrade excluding cost of earth work including labour and T&P etc. required for proper completion of work.
Supplying and laying local sand for making subgrade with proper compaction and dressing including all material labour and T&P etc. required for proper completion of work.
Supply and fixing of r.c.c wheel guard including supply of all materials, labour and T&P etc. required for proper completion of work
Painting chainage in VRB/DRB/FB/Sign board including all material, labour and T&P etc. required for proper completion of work.
Finishing walls with water proofing cement paint of approved make such as super snowcem, Durroocem, robiecem, Guttu cem, Super cem quality and of required shade on new wall surface (two coats) over one coat of white cement primer to give an even shade after thoroughly brushing the surface to remove powdered materials including curing and cost of all materials.
Supplying & laying of 125 micron polythene sheet under the foundation (for anti salt peter treatment) or over sub base to act as seperation between sub-base and conc. slab for (C.C. Road slab) including supply of all materials, labour and T&P etc. below C.C. linning for proper completion of work.
Fixing hectometer, boundary, R.C.C. post. including cost of all labour and T&P etc. required for proper completion of work.
Laying C.C. 1:2:4 with coarse sand dala stone grit of 12.5 to 20mm size with course sand and cement including cost of all material, labour and T&P etc.
Writing letters for details of canal boundary
Painting of RCC Precast Boundary Pillar size 150x150x1650 (mm) including cost of material labour, T&P, etc proper completion of work as per direction of engineer-in-charge.
Random Rubble masonry with 1:4 c.m. with course sand including all cost of labour, material and T&P etc. required for proper completion of work.
Dry Stone Boulder Pitching, filling joint with sand including cost of all type of labour , material T&P etc. icluding cost of boulder for proper completion of work.
Grouting boulder/stone pitching including all material, labour and T&P etc. required for proper completion of work.
Providing/Laying CC 1:3:6 M-15 A-20 Coarse sand (FM 2.25) with mechanical mixing by batching plant including all cost of materials, labour and T&P etc. required for proper completion of work.
Construction of Coursed Rubble stoned masonary work in 1:3 C.M. with cement sand motar including cost of all material, labour and T&P etc. required for proper completion of work.
Providing and fixing of 150 mm dia kulawa pipe including cost of labour and T&P etc. required for proper completion of work.
Fabrication of Mild steel/iron work in grill, Gates, railing, Door and window frames including cutting, drilling, welding/revetting & hinges, where necessary and fixing in position including cost of all material, labour, T&P etc. required for proper completion of work with one coat of red oxide primer
Earth work in Filling for restoration of canal including proper compaction, dressing, labour and T&P etc. required for proper completion of work.
Earth work in cutting for correcting section of canals including proper compaction, dressing, labour and T&P etc. required for proper completion of work..
Supplying of EC bags filled with earth and placing at position including cost of EC bag, cost of sutli, labour and T&P etc.
Making and fixing bamboo pile in position including cost of bamboo, labour and T&P etc..
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .