Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹5.6 L (4.25%)Rejected-Finance MAVAZHIKATHU VILA KANNIMEL CHERRY KAVANAD P O KOLLAM 691003 | KOLLAM | KOLLAM | KERALA | 691003 | ₹1.4 Cr+₹5.6 L (4.25%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
3 Feb 2021, 4:00 pmClosed
Superintending Engineer
O/o the Superintending Engineer PWD Buildings South Circle Thiruvananthapuram
BJM Government college Chavara - compound wall
2021_PWD_407428_1
PWD/2020-2021/12030/Bldgs SC
Open Tender
Civil Works - Buildings
Item Rate
180 days
BJM Government college Chavara
Please refer Tender documents.
7 documents required · 7 mandatory
₹6,508
Yes
₹50,000
Yes
12 Aug 2021
20 Jan 2021
6 Feb 2021
20 Jan 2021
3 Feb 2021
20 Jan 2021
Amount
APPENDIX- A Compound wall
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
50.2.3.1 : Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
od38459/2019_2020 : supplying and stacking half split Coconut Pole including spliting and edge sharping etc
od37553/2019_2020 : Coconut Pile-Driving down departmental half split coconut pile to lines and levels @75cm center to center through various strata including all hire charges and labour for fixing ,staging platform and all other appliances necessary for pile driving down after pointing the bottom end
od36757/2019_2020 : Dry rubble masonary with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12(1 cement:6 coarse sand:12 graded stone aggregate 20mm nominal size) including cost of through stone and bond stone
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.2.2 : Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.4.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
13.44.1 : Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
10.25.2 : Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
T K SANKARA NARAYAN KURUP
ROY JAMES
Bidder Name
SHIBI VALIYATH
ROY JAMES
T K SANKARA NARAYAN KURUP
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .