Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹11.3 L+₹46,628.25 (4.29%)Rejected-AOC CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L2 | Rejected-AOC Rejected financially |
Tender Value
₹11.8 L
EMD Value
₹14,800
Closing Date
6 Mar 2023, 5:00 pmClosed
SO EnM
SO EnM OFFICE, RAJRAPPA
Complete maintenance, overhauling ,all gasket replacement, improvement of insulation of 03 nos. 3MVA, 6.6KV, make Andrew Yule Sl.No. 11366 make Bharat Bijli, Sl.No.- 2469-1,2469-2 installed at 2X12.5MVA, 33KV-6.6KV Main substation of RJP
2023_CCL_271108_1
GM(R)/SO(EnM)/Rjp/22-23/Et/101 dt 15.02.2023
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
RAJRAPPA
Please refer Tender documents.
2 documents required · 2 mandatory
₹14,800
8 Jul 2023
16 Feb 2023
7 Mar 2023
17 Feb 2023
6 Mar 2023
17 Feb 2023
17 Feb 2023 - 22 Feb 2023
Amount
Providing of Buchholz relay (Aluminium pressure die cast with mercury switches for alarm & trip, powder coated flange size 50mm, abd flange distance 184mm.
Providing of winding temperature meter with trip, non-trip alarming system having capilliary tube of length3 mtr.
Providing of oil temperature meter with trip, non-trip alarming system having capilliary tube 3 mtr long.
Providing of magnetic oil level gauge dial size 150mm housing and body pressure die cast with powder coated.
Providing of Oil level gauge Transparent tube for conservator 130mm long.
Providing of Silica gel breather body Aluminium die cast container poly carbonate powder coated with flange mounting with silica gel blue 3Kg capacity.
Providing of Terminal Block for connections.
Providing of Copper un-armoured cable 10 core, 2.5 Sq.mm
Providing of Bushing with stud for primary side.
Providing of Bushing with stud for secondary side.
Replacement of gasket of conservator, radiator, Buchholz relay, Top cover & inspection chamber.
Heating of winding and varnishing for improvement of insulation value.
Dehydration/ filteration of transformer oil.
Cost of following test from NABL certified LAB
a) Dissolved gas analysis (DGA)
b) water content measurement ( PPM)
c) Dielectric Dissipation factor.
d) Total acidity test.
e) Sludge content test.
Replacement of oil seal ring of bushing of HT & LT side.
Miscellaneous item such as Brass washer/ GI nut bolts and insulating tap etc.
Labour cost on SL NO. 1 TO 10
Contractor's profit
Total impact of GST for the purpose of CTC
coalfields engineering works
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_280521.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .