| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹23.4 L (19.4%)Admitted-Finance T10 3RD FLOOR RAYHILSORT RESIDENCY DR PICKLE ROAD UTTARA KANNADA KARNATAKA 581301 UDYAM GA 02 0002041 27AAJCM4307Q1ZY B 29AAJCM4307Q1ZU R | UTTARA KANNADA | KARNATAKA | 581301 | ₹1.4 Cr+₹23.4 L (19.4%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹29.5 L (24.5%)Admitted-Finance | ₹1.5 Cr+₹29.5 L (24.5%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹38.3 L (31.8%)Admitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | ₹1.6 Cr+₹38.3 L (31.8%) | L4 | Admitted-Finance |
| 5 | L5₹2.4 Cr+₹1.2 Cr (96.0%)Admitted-Finance | ₹2.4 Cr+₹1.2 Cr (96.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Chandrika Marine Services L1 | M/s Dynatron services Private Limited L6 | ROYAL MARINE ENGINEERING WORKS L3 | Mercury Ship Repairs Pvt Ltd L2 | ULTRA MARINE L4 | Marine Blue Technologhy Pvt Ltd L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Scope of work | |||||||||
| 1.01 | Maintenance of S/W pipe lines (EG50100G Diesel oil general manifold) and (EG50200M Sea water general manifold) as per JIC EG-00-D-001.
1. Degutting of pipes as per procedure.
2. Chemical cleaning of pipes with permissible chemicals.
3. Thickness Gauging/Condition assessment of pipes for condition assessment.
4. Pressure testing of pipes up to prescribed test pressure.
5. Galvanization of pipes for corrosion resistant.
6. Re- gutting and trials at on board | 20 | MTR | 22,000 ₹4,40,000 | 20,150 ₹4,03,000 | 8,500 ₹1,70,000 | 8,000 ₹1,60,000 Lowest | 40,000 ₹8,00,000 | 9,523 ₹1,90,460 |
| 1.02 | Carry out exhaust gas circuit pipes maintenance of BQ20004,BQ50003E / BQ00163,BQ50004E / BQ00218,BQ50005E / BQ00165,BQ50006E / BQ00216, BQ50007E, BQ50008E, BQ50010E, BQ50012E, BQ50013E, BQ50018E, BQ50020E, BQ50021E, BQ50022E, BQ50023E, BQ50024E, BQ50025E, BQ50026E, BQ50095E, BQ50097E, BQ50196E, BQ50221E, BQ50262E, BQ50264E, BQ50266E, BQ50270E, BQ50271E, BQ50271E, BQ50275E and BQ50283E) as per JIC BQ-00-D-001.
1. Degutting of pipes as per procedure.
2. Chemical cleaning of pipes with permissible chemicals.
3. Thickness Gauging/Condition assessment of pipes for condition assessment.
4. Pressure testing of pipes up to prescribed test pressure.
5. Galvanization of pipes for corrosion resistant.
6. Re- gutting and trials at on board | 50 | MTR | 22,000 ₹11,00,000 | 18,600 ₹9,30,000 | 8,500 ₹4,25,000 | 8,000 ₹4,00,000 Lowest | 40,000 ₹20,00,000 | 9,523 ₹4,76,150 |
| 1.03 | Endoscopic check of fuel pipes as per JIC BX-00-I-002.
1. Ensure switch off of appropriate power supply.
2. Ensure all related valves are shut off.
3. Close hand pump inlet valves
4. Unscrew filter element after ensuring no pressure in the circuit.
5. Dis assemble cap with metal mesh.
6. Remove “O” Ring.
7. Insert endoscope into the pipe via strainer & inspect condition inside pipe, be aware presence of sludge, particles or sign of excessive corrosion.
8. If found unsatisfactory flush as per BX-01-1-002.
9. Assemble new “O” ring in Cap.
10. Assemble Cap in free part of metal mesh.
11. Assemble filter element in its housing.
12. Open valve DAR 1 &DAR 2.
13. Switch on relevant breaker in switch board BF02550.
14. Undertake trails to confirm Satisfactory operation. | 95 | MTR | 25,000 ₹23,75,000 | 10,850 ₹10,30,750 | 12,500 ₹11,87,500 | 8,000 ₹7,60,000 Lowest | 30,000 ₹28,50,000 | 9,473 ₹8,99,935 |
| 1.04 | Carry out diesel engine seawater circuit pipes BM50006M, BM50007M, BM50020M, BM50035M, BM50036M, BM50037M, BM50065M, BM50121M, BM50200M, BM50202M, BM50229M, BM50240M, BM50305M and BM50316M maintenance as per JIC BM-00-D-001.
1. Degutting of pipes as per procedure.
2. Chemical cleaning of pipes with permissible chemicals.
3. Thickness Gauging/Condition assessment of pipes for condition assessment.
4. Pressure testing of pipes up to prescribed test pressure.
5. Galvanization of pipes for corrosion resistant.
6. Re- gutting and trials at on board | 15 | MTR | 22,000 ₹3,30,000 | 20,150 ₹3,02,250 | 8,500 ₹1,27,500 | 8,000 ₹1,20,000 Lowest | 40,000 ₹6,00,000 | 9,523 ₹1,42,845 |
| 1.05 | Carry out the seawater circuit pipes maintenance of Sterngland cooling pipe (MB50300M/ MB50301M/ MB50302M/ MB50304M/ MB50305M/ MB50309M/ MB50310M), Sterngland freshwater rinsing pipe (MB50303M), Sterngland cooling circuit draining pipe (MB50307M) and MB00303 filter drain pipe (MB50308M) as per JIC MB-00-D-002.
1. Degutting of pipes as per procedure.
2. Chemical cleaning of pipes with permissible chemicals.
3. Thickness Gauging/Condition assessment of pipes for condition assessment.
4. Pressure testing of pipes up to prescribed test pressure.
5. Galvanization of pipes for corrosion resistant.
6. Re- gutting and trials at on board | 15 | MTR | 22,000 ₹3,30,000 | 20,150 ₹3,02,250 | 8,500 ₹1,27,500 | 8,000 ₹1,20,000 Lowest | 40,000 ₹6,00,000 | 9,583 ₹1,43,745 |
| 1.06 | Carry out the seawater circuit pipes maintenance as per JIC MB-00-D-002.
1. Degutting of pipes as per procedure.
2. Chemical cleaning of pipes with permissible chemicals.
3. Thickness Gauging/Condition assessment of pipes for condition assessment.
4. Pressure testing of pipes up to prescribed test pressure.
5. Galvanization of pipes for corrosion resistant.
6. Re- gutting and trials at on board | 10 | MTR | 22,000 ₹2,20,000 | 18,600 ₹1,86,000 | 8,500 ₹85,000 | 8,000 ₹80,000 Lowest | 40,000 ₹4,00,000 | 9,583 ₹95,830 |
| 1.07 | Maintenance of sea water circuit pipe (EL50001L Embarkation and draining exterior pipeline) as per JIC EL-00-D-001.
1. Degutting of pipes as per procedure.
2. Chemical cleaning of pipes with permissible chemicals.
3. Thickness Gauging/Condition assessment of pipes for condition assessment.
4. Pressure testing of pipes up to prescribed test pressure.
5. Galvanization of pipes for corrosion resistant.
6. Re- gutting and trials at on board | 10 | MTR | 22,000 ₹2,20,000 | 17,050 ₹1,70,500 | 8,500 ₹85,000 | 8,000 ₹80,000 Lowest | 40,000 ₹4,00,000 | 9,585 ₹95,850 |
| 1.08 | Carry out seawater circuit pipes maintenance as per JIC EM-00-D-001.
1. Degutting of pipes as per procedure.
2. Chemical cleaning of pipes with permissible chemicals.
3. Thickness Gauging/Condition assessment of pipes for condition assessment.
4. Pressure testing of pipes up to prescribed test pressure.
5. Galvanization of pipes for corrosion resistant.
6. Re- gutting and trials at on board | 15 | MTR | 22,000 ₹3,30,000 | 18,600 ₹2,79,000 | 8,500 ₹1,27,500 | 8,000 ₹1,20,000 Lowest | 40,000 ₹6,00,000 | 9,583 ₹1,43,745 |
| 1.09 | Carry out seawater circuit pipes maintenance as per JIC EM-00-D-001.
1. Degutting of pipes as per procedure.
2. Chemical cleaning of pipes with permissible chemicals.
3. Thickness Gauging/Condition assessment of pipes for condition assessment.
4. Pressure testing of pipes up to prescribed test pressure.
5. Galvanization of pipes for corrosion resistant.
6. Re- gutting and trials at on board | 10 | MTR | 22,000 ₹2,20,000 | 18,600 ₹1,86,000 | 8,500 ₹85,000 | 8,000 ₹80,000 Lowest | 40,000 ₹4,00,000 | 9,583 ₹95,830 |
Tender Value
Refer Docs
EMD Value
₹5.4 L
Closing Date
2 Feb 2024, 11:00 amClosed
THE ADMIRAL SUPERINTENDENT
Naval Ship Repair Yard Naval Base Karwar 581308
MAINTAINANCE OF VARIOUS PIPES P75 (2) SUBMARINE
2023_NAVY_635028_1
REG/P 75(2) /PIPES
Open Tender
Marine Services
Item Rate
90 days
NAVAL SHIP REPAIR YARD, NAVAL BASE, KARWAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5.4 L
Yes
MEWR(ENGG) DEPT
22 Apr 2024
30 Dec 2023
3 Feb 2024
30 Dec 2023
2 Feb 2024
31 Dec 2023
8 Jan 2024
Amount
Scope of work
Maintenance of S/W pipe lines (EG50100G Diesel oil general manifold) and (EG50200M Sea water general manifold) as per JIC EG-00-D-001. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Carry out exhaust gas circuit pipes maintenance of BQ20004,BQ50003E / BQ00163,BQ50004E / BQ00218,BQ50005E / BQ00165,BQ50006E / BQ00216, BQ50007E, BQ50008E, BQ50010E, BQ50012E, BQ50013E, BQ50018E, BQ50020E, BQ50021E, BQ50022E, BQ50023E, BQ50024E, BQ50025E, BQ50026E, BQ50095E, BQ50097E, BQ50196E, BQ50221E, BQ50262E, BQ50264E, BQ50266E, BQ50270E, BQ50271E, BQ50271E, BQ50275E and BQ50283E) as per JIC BQ-00-D-001. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Endoscopic check of fuel pipes as per JIC BX-00-I-002. 1. Ensure switch off of appropriate power supply. 2. Ensure all related valves are shut off. 3. Close hand pump inlet valves 4. Unscrew filter element after ensuring no pressure in the circuit. 5. Dis assemble cap with metal mesh. 6. Remove “O” Ring. 7. Insert endoscope into the pipe via strainer & inspect condition inside pipe, be aware presence of sludge, particles or sign of excessive corrosion. 8. If found unsatisfactory flush as per BX-01-1-002. 9. Assemble new “O” ring in Cap. 10. Assemble Cap in free part of metal mesh. 11. Assemble filter element in its housing. 12. Open valve DAR 1 &DAR 2. 13. Switch on relevant breaker in switch board BF02550. 14. Undertake trails to confirm Satisfactory operation.
Carry out diesel engine seawater circuit pipes BM50006M, BM50007M, BM50020M, BM50035M, BM50036M, BM50037M, BM50065M, BM50121M, BM50200M, BM50202M, BM50229M, BM50240M, BM50305M and BM50316M maintenance as per JIC BM-00-D-001. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Carry out the seawater circuit pipes maintenance of Sterngland cooling pipe (MB50300M/ MB50301M/ MB50302M/ MB50304M/ MB50305M/ MB50309M/ MB50310M), Sterngland freshwater rinsing pipe (MB50303M), Sterngland cooling circuit draining pipe (MB50307M) and MB00303 filter drain pipe (MB50308M) as per JIC MB-00-D-002. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Carry out the seawater circuit pipes maintenance as per JIC MB-00-D-002. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Maintenance of sea water circuit pipe (EL50001L Embarkation and draining exterior pipeline) as per JIC EL-00-D-001. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Carry out seawater circuit pipes maintenance as per JIC EM-00-D-001. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Carry out seawater circuit pipes maintenance as per JIC EM-00-D-001. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Carry out seawater circuit pipes maintenance as per JIC DB-00-D-001. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Seawater circuit pipes maintenance of fresh air induction cupola leak indicator (BH50073M) as per JIC BH-00-D-001. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Carry out seawater circuit pipes maintenance as per JIC DB-00-D-001. 1. Identifying of pipes to be assessed. 2. Tallying of pipes for identification. 3. Degutting of pipes as per procedure. 4. Chemical cleaning of pipes with permissible chemicals. 5. Thickness Gauging/Condition assessment of pipes for condition assessment. 6. Pressure testing of pipes up to prescribed test pressure. 7. Galvanization of pipes for corrosion resistant. 8. Re- gutting and trials at on board
Seawater circuit pipes maintenance of fresh air induction cupola leak indicator (BH50073M) as per JIC BH-00-D-001. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Carry out the maintenance of Brine outlet (EJ50003M) and Sea water inlet (EJ50001M) to RO plant pipes as per JIC EJ-00-D-001. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
Maintenance of sea water circuit pipes (EJ50031J Fresh water external embarkation manifold) as per JIC EJ-00-D-003. 1. Degutting of pipes as per procedure. 2. Chemical cleaning of pipes with permissible chemicals. 3. Thickness Gauging/Condition assessment of pipes for condition assessment. 4. Pressure testing of pipes up to prescribed test pressure. 5. Galvanization of pipes for corrosion resistant. 6. Re- gutting and trials at on board
procurement of (new pipes & accessories) meterials for Sl 1-15
Renewal pipes as per sample
Mercury Ship Repairs Pvt Ltd
ROYAL MARINE ENGINEERING WORKS
ULTRA MARINE
Marine Blue Technologhy Pvt Ltd
M/s Dynatron services Private Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .