Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | -1.65% | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹15.8 L (9.30%)Admitted-Finance | +7.50% | ₹1.9 Cr+₹15.8 L (9.30%) | L2 | Admitted-Finance |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
31 Aug 2026, 6:00 pmClosed
SE PWD CIRCLE KOTA
SE PWD CIRCLE KOTA
RJ-23/NP-ML /2026-27/6
2026_CEPWD_586115_2
SE PWD CIRCLE KOTA NITNO-12/2026-27
Open Tender
Civil Works
Percentage
150 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
2000 EE PWD DISTT DIV KOTA
₹3.5 L
Yes
7 Sept 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
31 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle | |||||
| 1.01 | dksFkyk ls Fkksyiqjk fdeh 0@0 ls 3@0 | - | E | - | - |
| 1.02 | dqy | - | Hectare | - | - |
| 2Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | |||||
| 2.01 | dksFkyk ls Fkksyiqjk fdeh 0@0 ls 3@0 | 1 | E | - | - |
| 2.02 | dqy | 1 | Cum | - | - |
| 3Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge | |||||
| 3.01 | dksFkyk ls Fkksyiqjk fdeh 0@0 ls 3@0 | 1 | E | - | - |
| 3.02 | dqy | 1 | Cum | 1 | ₹1 |
| 4Granular Sub-base with Well Graded Material (Table 400-1) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.54 MB
Tendernotice_2.pdf
PDF • 1.39 MB
Tendernotice_3.pdf
PDF • 11.56 MB
BOQ_1041131.xls
BOQ • 0.36 MB
RATE-ANALYSIS-23-06.pdf
PDF • 5.41 MB
CERTIFICATE-06.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .