Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹39.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹40.0 L+₹47,100.60 (1.19%)Admitted-Fee/PreQual/Technical/Finance N A | ₹40.0 L+₹47,100.60 (1.19%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹42.2 L+₹2.7 L (6.87%)Admitted-Fee/PreQual/Technical/Finance | ₹42.2 L+₹2.7 L (6.87%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹43.1 L+₹3.6 L (9.14%)Admitted-Fee/PreQual/Technical/Finance | ₹43.1 L+₹3.6 L (9.14%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹43.7 L+₹4.3 L (10.8%)Admitted-Fee/PreQual/Technical/Finance | ₹43.7 L+₹4.3 L (10.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BHARAT SINGH PANWAR L5 | DEV BHOOMI ASSOCIATES L1 | ANIL RAWAT L2 | Gaurav Gasain L3 | Vibhor Khanan L6 | M/s Vani Enterprises L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Providing of all materials, Carting from site store to site of work, Laying & jointing of G.I. Screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting threading and testing of pipe line etc complete. | |||||||||
| 1.01 | 40 mm dia (M) | 400 | Mtr | 495 ₹1,98,000 | 425 ₹1,70,000 | 380 ₹1,52,000 Lowest | 425 ₹1,70,000 | 484.6 ₹1,93,840 | 490 ₹1,96,000 |
| 1.02 | 32 mm dia (M) | 400 | Mtr | 433 ₹1,73,200 | 368 ₹1,47,200 Lowest | 380 ₹1,52,000 | 400 ₹1,60,000 | 402 ₹1,60,800 | 428 ₹1,71,200 |
| 1.03 | 25 mm dia (M) | 800 | Mtr | 340 ₹2,72,000 | 295.88 ₹2,36,704 Lowest | 300 ₹2,40,000 | 300 ₹2,40,000 | 324.2 ₹2,59,360 | 340 ₹2,72,000 |
| 1.04 | 15 mm dia (M) | 800 | Mtr | 190 ₹1,52,000 | 164 ₹1,31,200 | 150 ₹1,20,000 Lowest | 160 ₹1,28,000 | 179.5 ₹1,43,600 | 190 ₹1,52,000 |
| 2.00Cutting of bituminious CC & Bitumiuous road for laying of different size of pipe lines. | |||||||||
| 2.01 | CC Road | 9 | Cum | 1,900 ₹17,100 | 1,825 ₹16,425 | 1,900 ₹17,100 | 2,000 ₹18,000 | 2,253.1 ₹20,277.9 | 1,800 ₹16,200 Lowest |
| 2.02 | Reinstalement of road cutting as per item no. 3.01 | 9 | Cum | 7,000 ₹63,000 | 5,900 ₹53,100 | 5,000 ₹45,000 Lowest | 6,000 ₹54,000 | 7,293 ₹65,637 | 7,500 ₹67,500 |
| 3.00Excavation for pipe line in trenches etc. including lift upto 1.5 M lead upto 30 m including fitting watering remming and removal of surplus earth up to 60 m from trenches. | |||||||||
| 3.01 | Soil mixing (assuming 10% open) | 583.2 | Cum | 200 ₹1,16,640 Lowest | 236 ₹1,37,635.2 | 300 ₹1,74,960 | 220 ₹1,28,304 | 331.5 ₹1,93,330.8 | 280 ₹1,63,296 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
9 Jun 2026, 5:00 pmClosed
Executive Engineer
EE Construction Division Uttarakhand Peyjal Nigam Munikireti
TEMPORARY WATER SUPPLY ARRANGEMENT FOR KUMBH MELA 2027 IN SECTOR-28 MUNIKIRETI AREA.
2026_MDPEY_95666_1
634/107/23 dated 13-05-2026
Open Tender
Civil Works - Water Works
Item Rate
Reshikesh
Please refer to Tender Documents
3 documents required · 3 mandatory
₹4,720
EE Construction Division Peyjal Nigam Munikireti
₹1.1 L
17 Jun 2026
19 May 2026
11 Jun 2026
19 May 2026
9 Jun 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing of all materials, Carting from site store to site of work, Laying & jointing of G.I. Screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting threading and testing of pipe line etc complete. | |||||
| 1.01 | 40 mm dia (M) | 400 | Mtr | - | - |
| 1.02 | 32 mm dia (M) | 400 | Mtr | - | - |
| 1.03 | 25 mm dia (M) | 800 | Mtr | - | - |
| 1.04 | 15 mm dia (M) | 800 | Mtr | - | - |
| 2Cutting of bituminious CC & Bitumiuous road for laying of different size of pipe lines. | |||||
| 2.01 | CC Road | 9 | Cum | - | - |
| 2.02 | Reinstalement of road cutting as per item no. 3.01 | 9 | Cum | - | - |
| 3Excavation for pipe line in trenches etc. including lift upto 1.5 M lead upto 30 m including fitting watering remming and removal of surplus earth up to 60 m from trenches. | |||||
| 3.01 | Soil mixing (assuming 10% open) | 583.2 | Cum | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
Munikireti28.pdf
Tender Documents • 4.59 MB
BOQ_113100.xls
BOQ • 0.42 MB
CorrigendumMKR.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .