Tender Value
₹9.7 L
EMD Value
₹12,113
Closing Date
31 Jul 2026, 5:00 pm5d left
Dr. Sunny Rao
Office of the Project Officer,WJ Area
Power rearrangement of 6.6KV for E9 longwall and belt circuit in bottom seam, TSUs dismantling, transportation and placing, cable rearrangement at different locations for main substation, Moonidih Colliery ,W.J.Area.
2026_BCCL_362224_1
BCCL/WJA/MND/SUR/2026-27/13
Open Tender
Miscellaneous Works
Percentage
25 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹12,113
21 Jul 2026
21 Jul 2026
3 Aug 2026
21 Jul 2026
31 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Power rearrangement of 6.6KV for E-9 longwall & belt circuit in bottom seam, TSUs dismentalling, transportation and placing, cable rearrangement at different locations for main substation, Moonidih Colliery ,W.J.Area. | |||||
| 1.01 | Dismentaling, transportation of 1 no of 500KVA from DR-3 junction to 8 dip junction for maintenance, Manshift required = 10 Manshift(Unskilled) x 2 shift = 20 Manshift@(1437.6) = 20 x 1437.6 = Rs. 28752 for 1 nos or 28752/no | 1 | nos | 28,752 | ₹28,752 |
| 1.02 | Dismentaling of breaker chamber from 500KVA TSU & assembling it at 8 dip junction. Manshift required = 4 Manshift(Unskilled) x 2 shift = 08 Manshift@(1437.6) = 08 x 1437.6= Rs. 11500.8 for 1 nos or 11500.8/no | 1 | nos | 11,500.8 | ₹11,500.8 |
| 1.03 | Transportation & placing of 1 no of 500KVA from 8 dip junction to 3A junction, Manshift required = 10 Manshift(Unskilled) x 1 shift = 10 Manshift@(1437.6) = 10 x 1437.6 = Rs. 14376.0 for 1 nos or 14376.0/no | 1 | nos | 14,376 | ₹14,376 |
| 1.04 | Side Dressing for making space for placing 4 nos of 200KVA TSU in 4th rise 4x(5x2.5x2) = 100.00m³ Analysis: For 10 M3 side dressing in coal Manshift required=3 skilled manshift+10Unskilled manshift for mucking , Cost involved 1.00 M3=(3xRs.1510.60+10x1437.60)/10= Rs18907.8/10 M3 =Rs.1890.78/M3 | 100 | m³ | 1,890.78 | ₹1,89,078 |
| 1.05 | Dismentaling, transportation, placing & charging of 2 no of 200KVA from E-8 top gate to 4th rise, Manshift required = 8 Manshift(Unskilled) x 5 shift = 40 Manshift@(1437.6) = 40 x 1437.6 = Rs. 57504.00 for 2 nos or 28752/no | 2 | nos | 28,752 | ₹57,504 |
| 1.06 | Dismentaling, transportation, placing & charging of 2 no of 200KVA from zero level to 4th rise, Manshift required = 8 Manshift(Unskilled) x 5 shift = 40 Manshift@(1437.6) = 40 x 1437.6 = Rs. 57504.00 for 2 nos or 28752/no | 2 | nos | 28,752 | ₹57,504 |
| 1.07 | Dismantling, Transportation of 75mtr, 95sqmm cable from DR-3 junction to 4th rise bottom seam. Manshift required = 10 Manshift(Unskilled) x 2 shift = 20 Manshift@(1437.6) = 20 x 1437.6 = Rs.28752 for 75mtr nos or 383.36/no | 75 | mtr | 383.36 | ₹28,752 |
| 1.08 | Dismantling, Transportation of 50mtr, 95sqmm cable from DR-3 junction to 3A rise level. Manshift required = 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1437.6) = 16 x 1437.6 = Rs. 23001.6 for 50mtr or460.03/mtr | 50 | mtr | 460.03 | ₹23,001.5 |
| 1.09 | Side Dressing for making space for placing 3 nos of 200KVA TSU in gaurakh rise 3x(5x2.5x2) = 75.00m³ Analysis: For 10 M3 side dressing in coal Manshift required=3 skilled manshift+10Unskilled manshift for mucking , Cost involved 1.00 M3=(3xRs.1510.60+10x1437.60)/10= Rs18907.8/10 M3 =Rs.1890.78/M3 | 75 | m³ | 1,890.78 | ₹1,41,808.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_375121.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].