| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | BINU SEBASTIAN L1 |
|---|---|---|---|---|
| 1.00CULVERT | ||||
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 153.6 | cum | 64.98 ₹9,980.93 Lowest |
| 1.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 35.2 | cum | 865.85 ₹30,477.92 Lowest |
| 1.00 | OD204358/2024-2025: DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 28.62 | cum | 2,841.73 ₹81,330.31 Lowest |
| 1.00 | OD204359/2024-2025: Providing concrete for plain/reinforced concrete in open foundations (WITHOUT FORMWORK) complete as per drawings and technical specifications clause 802,803,1202 & 1203 (11.4.1.1 modified) P.C.C grade M10, Nominal mix 1:3:6 | 12.71 | cum | 7,957.08 ₹1,01,094.7 Lowest |
| 1.00 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 94.08 | cum | 9,089.48 ₹8,55,138.28 Lowest |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 4.7 | tonne | 92,335.37 ₹4,34,345.58 Lowest |
| 1.01 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.09 | tonne | 92,784.73 ₹8,165.06 Lowest |
| 1.01 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20 | 1.6 | cum | 9,613.87 ₹15,382.19 Lowest |
| 1.01 | OD204360/2024-2025:Filling with contractor's own earth (excluding rock) in OPEN AREAS in layers not exeeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m, and lift upto 1.5m as per direction of site Engineer in charge | 152.64 | cum | 426.87 ₹65,157.44 Lowest |
Tender Value
₹20.3 L
EMD Value
₹50,000
Closing Date
1 Oct 2025, 5:00 pmClosed
Executive engineer
Office of executive engineer Kalpetta
MLA-ADF-2024-25-Kalpetta LA - Construction of bridge on Aanakkappu-Aaram number road - Muppainad GP-2400000/-- General Civil Work
2025_LSGD_800987_66
D2-2374/2025(4)
Open Tender
Civil Works - Roads
Item Rate
365 days
Kalpetta
Please refer tender documents
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
21 Nov 2025
24 Sept 2025
3 Oct 2025
24 Sept 2025
1 Oct 2025
24 Sept 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1331104.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .