Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
5 Oct 2026, 11:30 am
Executive Engineer, Burdwan North Highway Division
Executive Engineer Burdwan North Highway Division, Aftab Club Court Compound 1st Floor, PO and Dist-Purba Burdwan, Pin-713101
Structural evaluation, widening and strengthening of flexible road pavements using Falling Weight Deflectometer (FWD), Technique for preparation of Detailed Project Report of Kashemnagar-Natunhat-Srikhanda Road (MDR) from 0.00 Km to 28.50 Km.........
2026_WBPWD_5073773_1
WBPWDRoadsEEBNHDNIQ17/26-2027
Open Tender
CIVIL WORKS
Item Rate
30 days
BURDWAN
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,000
Yes
21 Sept 2026
21 Sept 2026
7 Oct 2026
21 Sept 2026
5 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scope of Work
A. Collection of historical data about the pavement.
i) Initial pavement design-basis of design, guidelines followed, performance criteria adopted, layer types, layer thickness and properties assigned.
ii) Data regarding functional and structural evaluation carried out if the existing surface is an overlay.
iii) Laboratory testing results on different materials used (from Deptt.)
iv) Internal and external drainage arrangement made
v) As construction pavement details (from Deptt.)
vi) Maintenance and rehabilitation data such as past distresses, effectiveness of different maintenance and rehabilitation measures undertaken in the past (from Deptt.)
vii) Climatic condition data regarding rainfall intensity, temperature, occurrence of floods, overtopping of pavement, high water table etc.
viii) Past traffic volume history, axle load spectrum data (from data)
ix) Pavement core cutting test (@ 5 km interval)
x) Subgrade CBR test (@ 2 km interval along with validation of past data)
B. Pavement condition survey
Pavement condition survey shall precede the actual deflection measurement and consists primarily of visual observations supplemented by measurements for estimation of cracking, rutting and other distresses in the pavement. 01 No
C. Deflection Measurement as per relevent IRC (FWD)
D. Analysis of Data as perrelevent IRC
E. Estimate of Design Traffic as per relevent IRC
F. Overlay Design as per relevent IRC
G. Detailed inventory of road, bridges and structures (27.73 km)
H.Topographical survey with mobile LiDAR (27.73 km)
I.Overhead and underground utility survey through JV with concerned
departments of electricity & PHE (27.73 km)
J. K.Consolidated tree enumeration survey (27.73 km) if any
K. Preparation of LA plan and schedule through local amins including procurement of mouza maps and plot details (27.73 km) if any
L. ROW pillar installation (@ 250m interval on either side)
M. Road safety audit (RSA) of existing road (27.73 km)
N. Road safety audit (RSA) of existing road during operation (40 km outside project (road)
O. Marking of trees to be felled, separately under social forestry and PWD (27.73 km) if any
P. Tree Enumeration Report (for PWD & Social Forestry Division) if any
Q. Design of Horizontal & vertical alignment of main road and service road (if any)
R. Preparation of DPR 6 copy (soft copy should be submitted) | 27.73 | KM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 0.66 MB
Tendernotice_3.pdf
PDF • 1.20 MB
Tendernotice_4.pdf
PDF • 1.84 MB
BOQ_5158604.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .