Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 Cr+₹33.6 L (13.9%)Rejected-Finance | ₹2.7 Cr+₹33.6 L (13.9%) | L2 | Rejected-Finance Second Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L8 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L5 |
Tender Value
₹3.4 Cr
EMD Value
₹1 L
Closing Date
18 Jan 2022, 6:00 pmClosed
Superintending Engineer, HENC,Kozhikode
Office of the Superintending Engineer, Harbour Engineering North Circle, Puthiyanirath, Elathur. P .O., Kozhikode-673 303
NABARD RIDF XXVII-LAND DEVELOPMENT AND DREDGING WORK IN THANUR FISHING HARBOUR
2022_HED_466607_1
11/HED/NC/2021-22
Open Tender
Civil Works - Others
Item Rate
360 days
THANUR FISHING HARBOUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹7,500
Yes
₹1 L
Yes
5 Feb 2022
10 Jan 2022
20 Jan 2022
10 Jan 2022
18 Jan 2022
10 Jan 2022
Amount
APPENDIX A- LAND DEVELOPMENT
od5777/2021_2022 : Supplying and stacking at site., Local material/quarry muck OD based on 16.3.3
od5778/2021_2022 : Filling with Departmentally supplied Local material/Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade<br>Based on 51.2.3
60.7.6 : Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.7 : Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
APPENDIX B- DREDGING
65.81 : Deepening the harbour basin and mouth by using sand pumps mounted on barges or any other suitable method and dumping the spoil with a flow rate of 500m3 slurry per hour with a solid output of not less than 75 m3/hour at location already pointed out by the departmental officers with a lead up to a radial distance of 500m, including hire charges of sand pump, all tools and plants and accesories , fuel charges,idling and mobilisation charges, providing and shifting the pipe lines including all labour charges, incidental charges and service tax etc. complete for a depth upto (-) 3.50m with a tolerance of +/- 20cm.
B&I CONSTRUCTIONS
Mohammed Fasil
AK BABU
EVERGREEN TRANSPORTING
NASEER PM
M P MUSHTHAK
BAIJU R
Bidder Name
Mohammed Fasil
M P MUSHTHAK
NASEER PM
P.KUNHIKOYA
AK BABU
EVERGREEN TRANSPORTING
B&I CONSTRUCTIONS
BAIJU R
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_668213.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .