Loading…
Loading…
Tender Value
₹44.0 L
EMD Value
₹44,000
Closing Date
18 May 2026, 6:00 pmClosed
Executive Engineer Shedhi Irrigation Division Nadiad
Providing C.C. lining to Hariyala Distry Ex Kajipura Branch Canal with Structures.
300567
02 of 2026-27
Open
Civil Works - Canal
Nadiad
6 documents required · 4 mandatory · 2 optional
₹1,500
Executive Engineer Shedhi Irrigation Division Nadiad
₹44,000
2 May 2026
2 May 2026
2 May 2026
18 May 2026
2 May 2026
SCHEDULE -'B'(Bill of Quantity)
Providing C.C. lining to Hariyala Distry Ex Kajipura Branch Canal with Structures.
Item No. Item of work Unit Qty
Clearing the shrubs, like akadas, weeds and other
vegetables including depositing the same outside
and burning etc. complete from canal bed, top Rs. Five
and both slopes of the banks, for canal with Thousand
discharge.For Canals Below 20 Cusec. Seven
Clearing the silt from the CANAL BED / SLOPE by
digging the same to the required bed level and
gradient including depositing the excavated
earth regularly in spoil bank for utilizing the same
preparing the banks after breaking clods as and
where directed for lead upto 50 m. and all lifts. Rs. Fifty
(BY MACHINERY) Seven &
Earth work in embankment using selected soil,
soft & hard murrum excavated from approved
borrow area / village tanks etc. Including Rs. One
conveying, spreading in uniform layers, breaking Hundred
3A clods and dressing to the designed canal section Cum 1572.00 110.80 Ten &
etc. with lead upto 500m and all lifts Eighty
(for canals having capacity up to 300 Cusec) ( By Paise Only
Earthwork/Back filling with selected earth
including watering ramming,Compaction with
pnuematic temping with all lead and all lift etc Rs. One
complete. Hundred
3B Cum 1.00 144.5000 Forty Four
Compaction for making embankment for canal by
laying in regular layers of 15 cm in thickness
including breaking clods to 25 mm size incl. light
rolling by suitable rollers with slight watering to Seven &
4 facilitate rolling and dressing the side slopes etc. Cum 2195.00 27.70
SCHEDULE -'B'(Bill of Quantity)
Providing C.C. lining to Hariyala Distry Ex Kajipura Branch Canal with Structures.
Providing and laying plain/reinforced cement
concrete lining of M 15 (MSA 20 mm) in bed, side
slopes and curvature including batching, mixing,
transporting, placing, vibrating, smooth finishing,
curing including dewatering where required. Twenty
5 (MACHINERY BASED by "FLORI" - WITHOUT Sqmtr 7830.00 327.90
PAVER WATER CURING) Ninety
Providing groove and filling expansion joint of
size 12 mm wide and 25 mm deep in canal lining Rs. Thirty
during construction with two coats of primer and Four &
filled with bituminous and fine sand in Seventy
proportion of 2:1, as directed etc. complete. Paise Only
Dismantling the brick pitching including sorting Rs. Fifty
out and stacking of the useful materials on site Seven &
7 including removing the rubbish etc. complete as Cum 1587.00 57.80
directed. Paise Only
Dismantling the existing brick masonry including Rs. Seven
sorting out and stacking the useful material and Hundred
8 removing the debris and making good the Cum 14.00 750.90 Fifty &
damages etc. complete as directed. In Cement Ninety
Mortar. Paise Only
Dismantling the R.C.C. work and disposing off the Rs. One
stuff including stacking of the useful materials Thousand
etc. complete as directed.Light Reinforcement ( Seven
9 Main bar upto 16 mm. dia. ) Cum 1.00 1732.80 Hundred
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soils ,soft & hard
murrum etc. in dry condition including Rs. One
depositing the excavated stuff in uniform layers Hundred
10 in banks or as and where directed etc. complete Cum 101.00 107.80 Seven &
for lead up to 500m and all lift. (BY
MACHINERY)Including dewatering.
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as Rs. Four
directed with all lead & lift etc complete without Thousand
11A dewatering and excluding the cost of steel Cum 23.00 4012.50 Twelve &
reinforcement.(A) For Footing of column / Fifty Paise
Abutment / Pier / Bottom slab of barrel / Plinth Only
course / Coping / Approach Slab etc.(b) Concrete
grade M-15 and MSA-40 mm
SCHEDULE -'B'(Bill of Quantity)
Providing C.C. lining to Hariyala Distry Ex Kajipura Branch Canal with Structures.
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as
directed with all lead & lift etc complete without Rs. Four
dewatering and excluding the cost of steel Thousand
reinforcement.(A) For Footing of column /
Abutment / Pier / Bottom slab of barrel / Plinth
course / Coping / Approach Slab etc.(b) Concrete
grade M-15 and MSA-20 mm
Providing & Laying in position "DESIGN MIX"
cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI"
including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as Rs. Four
directed with all lead & lift etc complete without Thousand
dewatering and excluding the cost of steel Five
reinforcement.(A) For Footing of column / Hundred
Abutment / Pier / Bottom slab of barrel / Plinth Forty Three
course / Coping / Approach Slab etc.(c) Concrete Only
grade M-20 and MSA-20 mm
Providing & Placing in position reinforcement
bars including cutting, bending, welding joints
where necessary, hooking etc. complete as per Rs. Eighty
drawing for all lead and lifts. TMT / CRS Two
12 MT 4.518 82019.00 Thousand
Providing and laying in position 110 mm dia (6 Rs. Two
kgf/sqcm) P.V.C. Pipe for weep holes with non Hundred
13 corroding jali in abutments, wing walls, retaining Meter 48.00 262.50 Sixty Two &
walls etc. complete. Fifty Paise
Providing and fixing 110 mm diameter P.V.C. Rs. Three
pipe (6kgf/sqcm) Water spout with necessary Hundred
14 iron gratting as per design Meter 1.80 369.20 Sixty Nine
Providing temporary all weather and fair weather Rs. One
diversion suitable for traffic during the Thousand
construction period of the structure including One
15 providing necessary drain diversion and all safty Meter 10.00 1103.10 Hundred
measures including red lamps/ signals at night Three &
for traffic etc. comp. Ten Paise
Back filling the foundation trenches around the Rs. Thirty
structures etc with selected excavated stuff Six &
16 including watering, ramming, compacting etc. Cum 34.00 36.90
complete. (By Machinery) Paise Only
SCHEDULE -'B'(Bill of Quantity)
Providing C.C. lining to Hariyala Distry Ex Kajipura Branch Canal with Structures.
Providing and fixing in position ( different
diameter ) NP2 R.C.C. pipe with collar including Rs. Six
filling and caulking the joints with cement mortar Hundred
17 1:1 proportion, finishing to design grade and Meter 13.00 635.70 Thirty Five
level curing etc. complete for all leads and & Seventy
lifts.NP-2 class 300 mm dia pipe. Paise Only
Overhauling and oiling greasing of CR/HR gates
of branch/distributary/minor etc comp as Rs. One
directed.New / Repairing of steel gate including Hundred
providing basic steel material; M.S. Shaft plate, Twenty
angles, channels etc. incl. fabrication Seven &
transporting to site & erection and painting etc. Twenty
complete. Paise Only
Providing and fixing the iron rod for steel gates
including providing big size thread and finishing Rs. One
as required etc comp.b- dia of bar 50mm rod Thousand
19A Rmt 3.00 1740.80 Hundred
Providing and fixing the iron rod for steel gates
including providing big size thread and finishing Rs. One
as required etc comp.b- dia of bar 38mm rod Thousand
19B Rmt 7.00 1268.50 Hundred
Providing and fixing heavy duty CI nut for steel
gates as directed etc comp.b- for 50mm and 63 Rs. Two
mm dia rod land height of nut is 160 x 160 x 120 Thousand
20A Nos 1.00 2795.40 Hundred
Providing and fixing heavy duty CI nut for steel
gates as directed etc comp.a- for 38 mm dia rod
and height of nut is 120 x 120 x 100 cutting Rs. One
20B Nos 5.00 1300.00 Three
Providing and fixing heavy duty thrust bearing for
following dia as directed etc comp.a- for 38 mm
dia and 50 mm dia bar and ID/OD 65mm to
21 Nos 6.00 800.0000 Hundred
SCHEDULE -'B'(Bill of Quantity)
Providing C.C. lining to Hariyala Distry Ex Kajipura Branch Canal with Structures.
In Words: Rs. Forty Three Lac Ninety Five Thousand Three Hundred Twenty Eight & Eighty Eight Paise Only
I/We am/are willing to carry out the work at……………………………. % above/ below percent (Should be written in figures and words) of
the estimated rate mentioned above. Amount of my/our tender works out as under.
Estimated amount Estimated amount
Deduct :- ____ % Below Rs. _______________ Add ____ % above Rs. ______
Net Tender amount Rs. ______________ Net Tender amount Rs.
1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which
no extra payment shall be made.
2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 - GST and Income tax TDS will be deducted at a source while making payments of bills
4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC
10/2017CementConsumption /16/CDate:11/05/2017as stated in S.O.R. therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input
rate mentioned in all the tender.
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division or as directed by
supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be filled in inkand total
of entries in last column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects and hold good for work
under all conditions, site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. Hact - Hactare MT - Metric Tonne Rmt = Running metre
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs. 5483.37/M.T. (Rate as per CGWRD SOR 2023-24)
Signature of agency
Tedner Clerk Deputy Executive Engineer
Shedhi Irrigation Division Meshwo Irrigation Sub Division
Executive Engineer Divisional Accoutant
Shedhi irrigation Division Shedhi Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Final SBD.pdf
2 Schedule-B Final.pdf
3 Technical Specification.pdf
4 Material Specifications.pdf
5 VRB Drawing.pdf
6 CR Drawing.pdf
7 Outlet Drawing.pdf
Tender Notice No.02 of 2026-27.pdf
Download all tender documents and submit your bid