Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹30 Cr
EMD Value
₹30 L
Closing Date
27 Jan 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, Technical Cell, GWSSB, Gandhinagar
Request For Proposal For Appointment Of Project Management Consultancy (PMC) Including Supervision Services For Water Supply Projects In Gujarat
258956
2/2025-26
Open
Miscellaneous Works
Works
Gandhinagar
3 documents required · 3 mandatory
₹24,000
Member Secretary, GWSSB, Gandhinagar
₹30 L
30 Dec 2025
30 Dec 2025
30 Dec 2025
27 Jan 2026
30 Dec 2025
Including Supervision Services For Water Supply
Projects In Gujarat
Estimated Amount of Contract (INR) 30.00 crore
24 Months from issuance of LOI
Duration of Assignment (in Months) (Liability of the Firm/Agency will be up to end of
Defect Liability Period of the allocated project)
Bidding Type Open
Bid Call (Nos) One(1)
Tender Currency Type Single
Tender Currency Settings Indian Rupee (INR)
Joint Venture Not Applicable
Rebate Not Applicable
Bid Document Fee / Bid Processing Fees / Rs. 24,000/-
Tender Fee : (Rupees Twenty Four Thousand Only)
Demand draft in favor of Member Secretary,
Bid Document Fee Payable To :
GWSSB, Gandhinagar
1% of the Estimated cost as mentioned in NIT in
Bid Security / EMD / Proposal Security (INR) : form of D.D./F.D.R./B.G in favor of Member
Secretary, GWSSB, Gandhinagar
Bid Security / EMD In Favor of : Member Secretary, GWSSB, Gandhinagar
Tender Dates All Dates are in dd/mm/yyyy, hr: min as per
Indian Standard Time (IST)
Bid Document Downloading Start Date / /2025 onwards
Bidders can submit their queries through e- mail:
Pre Bid Meeting [email protected], or in person before
day of last date of online submission.
Bid Document Downloading End Date / /2025 18:00:00 hrs
Last Date & Time for Online Receipt of Bids / /2025 18:00:00 hrs
Physical Submission of documents last Date / /2025 17:00:00 hrs
Bid Opening Date / /2025 17:30:00 hrs
180 Days from the last date of submission of bid
Bid Validity Period
which may be extended on request.
Instrument of tender fee & EMD shall be
submitted in electronic format only through online
(By scanning while uploading the bid). This
submission shall mean that Tender Fee and
EMD are received for purpose of opening the bid.
Accordingly offer of only those shall be opened
whose tender fee and EMD is received
electronically. However for the purpose of
realization of instrument of tender fee & EMD,
bidder shall send the same in original through
RPAD/Speed Post/ Courier/ Hand Delivery so
Physical submission of Tender Fee, Earnest
as to reach to " The Chief Engineer, Technical
Money Deposit and PQ supporting document.
Cell, Gujarat Water Supply & Sewerage
Board, Jal Seva Bhavan, Sector-10A, In front
of Air Force Station, Gandhinagar, Gujarat "
before stipulated date and time as mentioned
above. For not submitting DD/FDR/BG in original,
bid shall be outright rejected and not considered
for evaluation.
Any document in supporting to tender bid shall
be submitted in electronic format only through
online (by scanning etc.) and submission only in
hard copy will not be accepted separately.
1. Tender fee, Earnest money deposit, PAN
Card shall be uploaded online only.
2. Tender Fee (Document fee) amounting to
Rs. 24,000/- (Rupees Twenty Four Thousand
only) in favor of " The Member Secretary,
Gujarat Water Supply & Sewerage Board, Jal
Seva Bhawan, Sector-10 A, Opp. Air Force
Station, Gandhinagar, Gujarat" in form of
Demand Draft shall be issued by any
nationalized bank or as per list mentioned in
latest GR of Finance Department, GR dtd. 01-
05-2025 issued by Finance Department of
Payments details
Government Of Gujarat.
Earnest Money Deposit of Rs 30.00 lakhs
(Thirty Lacs) in form of FDR or Bank Guarantee
in favor of "The Member Secretary, Gujarat
Water Supply & Sewerage Board, Jal Seva
Bhawan, Sector-10A, Opp. Air Force Station,
Gandhinagar, Gujarat " valid up to 28 days from
the date of closure of the bid validity period of
180 days i.e(180+28=208 days), shall be issued
by any nationalized bank or as per list mentioned
in GR dtd. 01-05-2025 issued by Finance
Department of Government Of Gujarat
Chief Engineer, Technical Cell, GWSSB,
Officer Inviting Bids :
Chief Engineer, Technical Cell, GWSSB,
Bid Opening Authority :
Gujarat Water Supply & Sewerage Board,
Address : JalSeva Bhawan, Sector-10A, Opp. Air Force
Station, Gandhinagar, Gujarat.
Contact no of officer inviting bids
The following documents shall be uploaded while
submitting the BID online:
Scanned copy of Demand Draft as tender
Scanned copy of FDR / BG as EMD
Scanned copy of consultancy / company
registration certificate in Govt.
Scanned copy of PAN card
Scanned copies of Experience certificates
Submission of tender showing successful completion of work (with
Scan copies of financial documents.
In addition to the documents mentioned above,
the documents required as per attached Forms &
Annexure are also to be uploaded. Bidder shall
submit their offer i.e. Technical bid as well as
price bid in Electronic format on stipulated
website& date as mentioned in the tender
document. No offer in physical form will be
For any clarification the bidder may contact:
Chief Engineer Superintending Engineer Executive Engineer,
Technical Cell, Technical Cell, Technical Cell,
GWSSB, Gandhinagar GWSSB, Gandhinagar GWSSB, Gandhinagar
Phone No 9978406839 Phone No 9978406652 Phone No
General Terms & Conditions :
1 Downloading of Tender Document
Interested consultants can download the tender document free of cost from the website.
Bidders wish to participate in the Tender will have to register on web site www.
https://tender.nprocure.com.
2 Digital Certificate
Bidders who wish to participate in this Tender will have to procure / should have legally
valid Digital Certificate as per Information Technology Act-2000 (Class-III) using which
they can sign their electronic RFP.
Bidders can procure the same from (n)Code Solutions-A Division of GNFC Ltd.- who
are licensed Certifying Authority by Govt of India having following address and contact
(n)Code Solutions (A Division of GNFC Ltd.)
(n) Procure Cell
403, GNFC Info tower, S.G.Road,
Bodakdev, Ahmedabad - 300054. Gujarat
Email : [email protected]
Bidders who already have a valid Digital Certificate need not procure a new Digital
3 Pre-Bid Conference
Pre-bid conference for this tender shall be conducted on date as mentioned in NIT, at
Gujarat Water Supply & Sewerage Board, Jal Seva Bhavan, Sector-10-A, Opp. Air
Force Station, Gandhinagar
The Bidders shall obtain the clarifications to the queries raised in form of Minutes of
Meeting which will be uploaded by GWSSB on the website. These Minutes and any
Amendments to the tender shall be a part of Tender Document.
4 Online Submission of Technical and Price Bid
Bidders can prepare and edit their offers number of times before final submission. Once finally
submitted bidder cannot edit their offers submitted in any case. No written or online request in
this regards shall be granted.
Bidder shall submit their offer i.e. Technical bid as well as price Bid in Electronic format on
above mentioned website. Dt. Shown above after digitally signing the same.
Offers submitted without digitally signed will not be accepted.
Offers in physical form will not be accepted in any case.
5 Opening of Tender
Opening of Bid documents will be held on Date & time shown above in NIT at the office of Chief
Engineer, Technical cell GWSSB, Gandhinagar.
Intending bidders or their representative who wish to remain present at GWSSB, premises
at the time of tender opening can do so.
The Offline technical evaluation of the tenders received on or before last date of submission
would be done and results will be displayed on website.
After Successful completion of Technical Evaluation, price bid of only those bidders would
be opened online who are found to be substantially responsive.
6 Contacting officer
Further Details/Clarifications if any required will be available from:
Superintending Engineer, Technical Cell, GWSSB, Gandhinagar.
In case bidder needs any clarification/assistance or if training required for participating in
online tender, they can contact the following office.
M/s (n)Code Solutions.
A Division of Gujarat Narmada Valley Fertilizers Company Ltd.
301,GNFC Infotower,BodakDev,Ahmedabad-300 054 Phone:079-26857316,
Email:[email protected] or www.nprocurement.com
Free training camp will be organized every Saturday between 4.00 to 5.00P.M. At M/s
nProcurement Technologies Pvt. Ltd. Bidders are requested to take benefit of the same.
7 General Instruction
Tender shall be awarded to single bidder.
The fees for online tender document will not be refunded under any circumstances.
Consulting Firms shall have to submit technical bid as well as price bid in electronic format only
on n procure website till the last date and time for submission.
Bids shall only be signed by Authorized Signatory.
Offers in physical form will not be accepted in any case
EMD in the form specified in tender document only shall be accepted.
Tenders without Tender fees, Earnest Money Deposit (EMD) and which do not fulfill all or
any of the condition or submitted incomplete in any respect will be rejected.
Conditional tender shall not be accepted.
Bids shall be self-explanatory, self-content proposal, no reference to external documents will be
considered. Reference documents uploaded with the bid will only be considered
The bidder are advised to read carefully the Instruction to Bidder, Eligibility criteria for
qualification contained in the tender documents
Bid once submitted shall not be amended /appended after the last date of submission, unless in
response to some queries or clarification sought by GWSSB.
The tender notice shall forma part of tender document.
The Bidders are advised to read carefully the “Instruction for Bidder” and
"Eligibility Criteria” contained in the tender documents.
The internet site address for E-Tender is http://tender.nprocure.com
Tender Documents are also available on GWSSB website
https://gwssb.gujarat.gov.in
Other terms and conditions as per detailed tender documents
8 GWSSB reserve the rights to reject any or all the tenders without assigning any reason thereof.
Chief Engineer,
Technical Cell,
GWSSB, Gandhinagar
LETTER OF INVITATION
LETTER OF INVITATION
Sub: Request for Proposal for Appointment of Project Management Consultancy (PMC)
Including Supervision Services for Water Supply Projects In Gujarat
GWSSB has taken up implementation of the Water Supply Schemes for various Urban /
Rural areas of the state. The projects are being implemented in a phased manner. The
eligible payments under this contract shall be made from the funds received from
Government of Gujarat and /or Government of India.
GWSSB intend to appoint Consultant for Project Management Services including Survey
Work, preparation of detailed project report, Bid process & evaluation, Construction
Supervision Services from qualified, technically competent, experienced consultancy
agencies. Consultants should note that the works are of water supply in nature and
component generally involved in the work such as intake works, Water treatment plant,
transmission pipeline, distribution network, sump, elevated reservoir, pump house, SITC
of Pumping machinery and ancillary electro-mechanical works etc. The objective of the
assignment is to ensure quality assurance, timely completion of projects within the
budgeted costs. Aggregated cost of the project management consultancy fee put under
the tender of consultancy service is to the tune of Rs. 30.00 Cr (approximately) and
allocation of the consultancy work will be decided by competent authority of client without
any prejudice to any consulting agency as per tender provisions. The Firm/Consultant
who shall achieve highest combined score (Technical and Financial) may be considered
for allocation of consultancy work.
In case, if it may happen that there may be more than one first rank bidders based on
equal combined technical and financial scoring, the award of the consultancy work may
be decided based on the lowest quoted price among the first rank bidders.
PMC work under the agreement will be allocated up to 24 months from LOI. However
functioning of the PMC agency under contract and liabilities of PMC shall be till the
completion of the defect liability period of the project assigned to PMC.
Under the contract, PMC agency can be awarded works extended up to 25% of the
estimated amount of work
Broadly the scope of the Consultancy service is envisaged as follows:
o “To assist client in overall Project Management and Implementation of the
Item rate / EPC / Turnkey Contracts, that includes:
Survey & Investigation
Detail Project Report
Bid Process management,
Evaluation of Bids and assisting client in finalization of Contract,
Construction Supervision Services and Contract Administration,
Review of Contractor’s design and construction document,
Inspection of materials, machineries and equipment
Commissioning assistance
Services during defects liability period”.
More details on the services are provided in Request for Proposal
(1) A Firm will be selected based on Quality and Cost Based Selection (QCBS)
procedures described in this RFP.
(2) The eligibility criteria as per the Section-2 of this RFP.
(3) Consultants are, therefore, invited through this Request for Proposal (RFP) to upload
with digitally signed your Technical and Financial offers for further consideration by
GWSSB for selection of the consultants.
(4) This Volume- 1 of Technical proposal includes the following sections. Volume- 2, is
the price proposal, provided in a separate volume
Section – 1: Letter of Invitation.
Section – 2: Information to Consultants
Eligibility criteria for qualification
Special instructions
Section – 3: Technical Proposal- Standard Forms
Section – 4: Broad scope of work and request for
Section – 5: General Conditions of Contract
Special Conditions of Contract
Section – 6: Appendices Standard Form of Contract
(5) Address for Submission of Bid
Please inform us in writing to the following address:
(a) That you received the letter of invitation; and
(b) Whether you will submit a proposal alone or in association.
The Consultants are requested to ensure that the Technical Proposal along with
RFP Fee and EMD (original) are submitted by date and time shown in NIT with the
reference number, name of the project and clear identification of the contents
on the envelope to:
Tender for Consultancy Services
Chief Engineer,
Technical Cell,
Gujarat Water Supply and Sewerage Board,
Opposite Air Force, ‘Chh Road’,
Sector 10(A), Gandhinagar-382
Yours sincerely,
Chief Engineer,
Technical Cell,
Gujarat Water Supply and Sewerage Board
INFORMATION TO CONSULTANTS
INFORMATION TO CONSULTANTS
1. INTRODUCTION :
1.1 The Client named in the "Data Sheet" will select a Firm in accordance with the
method of selection indicated in the Data Sheet and detailed in the Guidelines given
in the Data Sheet.
Selection of consultant by the GWSSB will be Quality and Cost Based Selection
(QCBS method) out of the firms responding from the RFP
1.2 The consultants are invited to submit electronically under e-tender procedure the
Technical Proposal and a Financial Proposal as specified in the Data Sheet (the
proposal) for consulting services required for the Assignment named in the Data
Sheet. The Proposal will be the basis for contract negotiations and ultimately
signature of a contract with the selected Firm.
1.3 The Assignment shall be implemented in accordance with the phasing indicated in
the Data Sheet. When the Assignment includes several phases, continuation of
services for the next phase shall be subject to satisfactory performance of the
previous phase, as determined by the Client.
1.4 The Consultants must familiarize themselves with local conditions and take them into
account in preparing their proposals. To obtain firsthand information on the
assignment and on the local conditions, consultants are encouraged to pay a visit to
the Client/Project Locations before submitting a Proposal. The Consultant's
representative should contact the officials named in the Data Sheet to arrange for
their visit or to obtain additional information. Consultants should ensure that these
officials are advised of the visit in adequate time to allow them to make appropriate
1.5 The client will provide the inputs specified in the Data Sheet, assist the Consultants in
obtaining licenses and permits needed to carry out the services, and make available
relevant project data and reports.
In preparing their proposals, consultant are expected to examine in detail the
documents comprising the RFP, material deficiencies in providing the information
requested may results in rejection of a proposal.
1.6 Please note that (i) the costs of preparing the proposal and of negotiating the
contract, including a visit to the Client, are not reimbursable (ii) the Client is not
bound to accept any of the Proposals submitted.
1.7 The Client policy requires that Consultants provide professional, objective, and
impartial expert Technical advice which is technologically sound, economical &
environmentally sustainable and at all times hold the Client's interests paramount,
without any consideration for future work, and strictly avoid conflicts with other
assignments or their own Corporate interests. Consultants shall not be hired for any
assignment that would be in conflict with their prior or current obligations to other
clients, or that may place them in a position of not being able to carry out the
assignment in the best interest of the Client.
1.7.1 Without limitation on the generality of this rule, consultants shall not be hired
under the circumstances set forth below;
(a) A Consultant which has been engaged by the Client to provide goods
or works for a project, and any of their affiliates, shall be disqualified
from providing consulting services for the same project. Conversely,
Consultants hired to provide consulting services for the preparation or
implementation of a project, and any of their affiliates, shall be
disqualified from subsequently providing goods or works or services
related to the initial assignment (other than a continuation of the
Consultant's earlier consulting services) for the same project.
(b) Consultants or any of their affiliates shall not be hired for any
assignment which, by its nature, may be in conflict with another
assignment of the consultants.
1.7.2 As pointed out in Para 1.7.1(a) above, consultants may be hired for
downstream work, when continuity is essential, in which case this possibility
shall be indicated in the Data Sheet and the factors used for the selection of
the consultant should take the likelihood of continuation into account. It will
be the exclusive decision of the Client whether or not to have the downstream
assignment carried out, and if it is carried out, which consultant will be hired
for the purpose.
1.7.3 Any previous or ongoing participation in relation to the assignment by the
Firm, its professional staff, or its affiliates or associates under a contract with
the Client may result in rejection of the proposal. Consultants should clarify
their situation in that respect with the Client before preparing the proposal.
1.8 It is the Client's policy to require that consultants under contracts observe the highest
standard of ethics during the selection and execution of contracts. In pursuance of
this policy, the Client ;
(a) defines, for the purposes of this provision, the terms set forth below as follows
i) "corrupt practice" means the offering, giving, receiving, or soliciting of
anything of value to influence the action of a public official in the
selection process or in contract execution; and
ii) "fraudulent practice" means a misrepresentation of facts in order to
influence a selection process or the execution of a contract to the
detriment of the Borrower, and includes collusive practices among
consultants (prior to or after submission of proposals) designed to
establish prices at artificial, non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.
(b) will reject a proposal for award if it determines that the Firm recommended for
award has engaged in corrupt or fraudulent activities in competing for the
contract in question;
(c) will cancel the portion of the payment allocated to the Firm's contract if it at
any time determines that corrupt
(d) or fraudulent practices were engaged in by representatives of the Consultant
during the selection process or the execution of that contract, without the
Consultant having taken timely and appropriate action satisfactory to the
Client to remedy the situation;
(e) will declare a Firm ineligible, either indefinitely or for a stated period of time, to
be awarded a contract if it at any time determines that the Firm has engaged
in corrupt or fraudulent practices in competing for, or in executing, a contract;
(f) will have the right to require that, in contract a provision be included requiring
consultants to permit the Client to inspect their accounts and records relating
to the performance of the contract and to have them audited by auditors
appointed by the Client.
1.9 Consultants shall not be under a declaration of ineligibility for corrupt and
fraudulent practices issued by the Client in accordance with the above sub
1.10 The terms / conditions and detailed scope of work with the contractor shall be part
1.11 Consultant shall bare all costs associated with the preparation and submission of
their proposals. Costs might include site visit, collection of information and if
selected attendance at contract negotiation.
1.12 Conditional bids are liable to be rejected.
1.13 Bids with variable costs/rates shall be rejected.
2.0 DOCUMENTS COMPRISING THE RFP :
This RPF include following
Volume :1 Technical Proposal
Section – 1: Letter of Invitation.
Section – 2: Information to Consultants
Eligibility criteria for qualification
Special instructions
Section – 3: Technical Proposal - Standard Forms
Section – 4: Broad scope of work and request for proposal
Section – 5: General Conditions of Contract
Special Conditions of Contract
Section – 6: Appendices Standard Form of Contract
Volume :2 Financial Proposal
2.1 Clarification shall only be asked during pre-bid meeting or through fax/ e-mail.
2.2 Pre bid meeting
The consultant or his official representative is invited to attend a pre bid
meeting, which will take place at time and place indicated in data sheet.
The purpose to the meeting will be to clarify issues and to answer question on
any matter related to the RFP that may be raised at that stage including the
clarifications requested under 2.1 above.
Non-attendance at the pre-bid meeting will not be a cause for disqualification
2.3 At any time before the submission of proposals, the Client may, for any
reason, whether at its own initiative or in response to a clarification requested
by an invited Firm, modify the RFP documents by amendment. Any
amendment shall be issued in writing through addenda. Addenda shall be
sent by mail, cable, telex, facsimile, or electronic mode to all invited
consultants and will be binding on them. The Client may at its discretion
extend the deadline for the submission of Proposals.
3.0 PREPARATION OF PROPOSALS :
3.1. Consultants are requested to submit a Proposal (Para 1.2) written in the
language(s) specified in the Data Sheet. It should be submitted in two bids
viz, Technical and Financial.
Technical Proposal:
3.2 In preparing the Technical Proposal, consultants are expected to examine the
documents comprising this RFP in detail. Material deficiencies in providing
the information requested may result in rejection of a Proposal.
The technical proposal should clearly demonstrate the consultants
understanding of the assignment requirements and capability and approach
for carrying out the tasks set forth in the RFQ
3.3 While preparing the Technical Proposal, consultants must give particular
attention to the following :
i) The assignment carried out by individual staff member or any
associates prior to joining the Firm of consultant cannot be called as
the experience of the Firm but may be referred to in the curriculum vita
of staff proposed for the services.
ii) All the key staff proposed shall be regular full time employees of the firm
for not less than 12 months and the age of maximum 65 years shall be
considered prior to date of submission of the proposal.
However, in case of Financial Analyst and Legal Expert the experience of
the person engaged by the consultant for their firm may be considered.
Copy of the TDS/PF statement of staff must be attached as a proof.
iii) Proposed professional staff must have at least the experience
indicated in the Section 2(C) Eligibility Criteria for qualification,
preferably under conditions similar to those prevailing in the country of
the Assignment.
iv) Alternative professional staff shall not be proposed, and only one
curriculum vitae (CV) may be submitted for each position.
v) Reports to be issued by the consultants as part of this assignment
must be in the language(s) specified in the Data Sheet. It is desirable
that the Firm's personnel have a working knowledge of the client's
national / local language.
3.4 The Technical proposal should provide the following information using the
attached Standard Forms (Section-3):
i) A brief description of the Firm's organization and an outline of recent
experience on assignments (Section3; Form 3C- 1 to 5)of a similar
magnitude and nature and present workload
ii) Any comments or suggestions on the Request for Proposal and on the
data, a list of services, and facilities to be provided by the Client
(Section3; Form 3E-1).
iii) A description of the methodology and work plan for performing the
assignment (Section 3; Form 3D-6).
iv) The list of the proposed staff team by specialty, the tasks that would
be assigned to each staff team member, and their timing (Section 3;
v) CVs must be recently signed by the proposed professional staff on
Firms letter pad and the authorized representative submitting the
proposal. Key information should include educational qualification,
number of years working for the Firm/entity, and degree of
responsibility held in various assignments in the past 10 to 15 years
(Section 3; Form 3D-9).
vi) Copy of TDS and PF statement for each key staff OR Proof of
employee is on pay role of company shall be submitted. (Section 3;
vii) Estimates of the total staff effort (professional and support staff; staff
time) to be provided to carry out the Assignment, supported by bar
chart diagrams showing the time proposed for each professional staff
viii) Forms for specific Project Experience Section.
3.4 The Technical Proposal shall not include any financial information.
Financial Proposal:
3.6 In preparing the Financial Proposal, consultants are expected to take into
account the requirements and conditions of the RFP documents. The
Financial Proposal should follow Standard Forms (Volume 1 Section- 4). It
lists all costs associated with the Assignment are deemed to be included in
the financial offer, such costs could be (a) remuneration for staff (foreign and
local, in the field and at headquarters), and (b) reimbursable such as
subsistence (per diem, housing), transportation (international and local, for
mobilization and demobilization), services and equipment (vehicles, office
equipment, furniture, and supplies), office rent, insurance, printing of
documents, surveys; and training, if it is a major component of the
3.7 The Financial Proposal shall be inclusive of all the taxes excluding GST,
but including all local taxes (including social security), duties, fees,
levies, and other impositions imposed under the applicable law, on the
consultants, the sub-consultants, and their personnel.
3.8 Consultants may express the price of their services in terms of percentage of
the approved project cost of work.
3.9 Commissions and gratuities, if any, paid or to be paid by consultants and
related to the Assignment will be borne by the consultant.
3.10 The Data Sheet indicates how long the proposals must remain valid after the
submission date. During this period, the consultant is expected to keep
available the professional staff proposed for the assignment. The Client will
make its best effort to complete negotiations within this period. If the Client
wishes to extend the validity period of the proposals, the consultants who do
not agree have the right not to extend the validity of their proposals.
3.11 The financial proposal shall be quoted as percentage of approved project cost
for Project Management and construction supervision Consultancy Services
as given in the price bid. Payment shall be paid as per payment schedule.
(a) The costs shall be given inclusive for phases of work, i.e.
Survey & Investigation
Preparation of DPR
Pre-contract work
Construction Supervision Services, and
Defects correction supervision
In due consideration of the pertaining descriptions of the Request for Proposal
as included and the Sample Draft Contract Agreement and of the following.
(i) The Period of DPR and DTP’s is expected to be about 3(Three) months
for Detail Project report and Draft Tender paper submission.
The work will involve
Survey and Investigation
Preparation of DPR(Drawing and mapping of alignment and
assets on PM GATISHAKTI)
Preparation of Bid document
Qualification of Firms
Attending pre bid meeting and preparing minutes of meeting,
corrigendum to the documents etc.
Technical and Financial Bid Evaluation
Finalization of Contracts up to issue of work order.
(ii) The Period for the Pre-contract work is assumed at one weeks and shall
be used to ensure that all head (branch) office and site staff to be involved
fully understands
The Contract Agreement
The construction contract documentation
The activities and tasks required under their proposed position
The particular procedures and ways of interaction with the
Employer and the contractor
Checking and approval of detailed designs of civil (structural
designs) & electro-mechanical equipment etc.
The period shall also include for the consultant's mobilization prior to
the contractor entering the site. The consultant shall mobilize
immediately after entering the contract agreement.
(iii) The assignment period of the Consultant’s service is Twenty Four
Months. It is required to extend contract due to any reason, payment will
be made at the approved tender rate, for the balance portion of work
beyond 24 months. The Agency shall base his pricing on this duration but
take into account the various items in the construction contract (e.g. work
schedule and bill of quantities), which may affect the need for reduced/
increased staff input during particular stages of works' execution. With
regard to early or delayed completion, refer to the Sample Draft Contract
Following Works are envisaged during construction supervision period.
Inspection of materials and equipment
Over all supervision of Construction activities, assist in taking
measurement & preparation of bill, certification of bills, monitoring of
progress of work, submission of periodical progress report,
monitoring of Quality Assurance Program, inspection of materials
and equipment at site as well as factory site (manufacturing unit),
satisfactory certification of work and satisfactory completion
certificate of the project.
Monitoring towards Commissioning of projects
Periodical monitoring for Defect correction period up to completion of
(iv) The “Defects Correction Supervision” will be of duration of 36(thirty Six)
months from the date of issue of the certificate of completion to the
contractor. During this period, permanent presence of Agency staff on site
is not necessary. However, Agency Personnel shall visit all site at least
once in a month and submit report. Further Agency personnel should be
readily available for a site visit at any time on 48 hours’ notice by the
Client whenever required.
(c) Consultant’s price proposed shall include the followings.
Professional staff site office:
All decision making key personals shall be deployed by the consultant
at site office. The rates hereto shall be all inclusive per staff member
and month, and cover basic salary, social charges (incl. pension fund
and similar payments), overheads (incl. tax and insurance liabilities,
sickness, holiday and bonus payments, charges for support staff office
and backstopping, etc.) consultant's fees and any other accountable
and variables. The rate shall also include staff required by consultant
at head and branch office for their own general administration.
Charges for travel of staff from home base to site and field allowances
for boarding and lodging, etc. shall also be covered.
Transportation
The rates hereto shall be all-inclusive per vehicle type per month and
cover rent/depreciation, running and maintenance, driver's wages,
charges and allowances, consumables and any other accountable and
Site office and equipment
The rates hereto shall be all-inclusive per month and cover rent/
depreciation, operation, running and maintenance, internet facility,
costs for document reproduction, communication, support staff like
computer operator with AutoCAD knowledge, draughtsman, tracers,
office staff, computer operator, etc. and any other accountable and
Other expenses (if any)
(To be specified by consultant in his financial proposal)
All costs and rates quoted shall be fixed for the duration of the contract
agreement, except as otherwise provided for therein.
Any costs not entered shall not be payable, except as otherwise
provided for in the contract agreement.
4.0 SUBMISSION, RECEIPT, AND OPENING OF PROPOSALS :
4.1 The original Proposal (Technical Proposal and Financial Proposal; shall be
submitted electronically.
4.2 An authorized representative of the Firm initials all pages of the Proposal
submitted in hard copy. The representative's authorization is confirmed by a
written power of attorney accompanying the proposals.
4.3 Bid processing fees and earnest money deposit shall be submitted to the
client as shown in Data sheet
4.4 The technical proposal and financial proposal must be uploaded online on or
before the time and date stated in the data sheet. All submission shall be in
PDF portable document format or joint photographic experts group (JPG)
4.5 After the deadline for submission of proposals the technical proposal shall be
opened immediately by the Authorized representative of GWSSB. The
financial proposal shall remain encrypted with a respectable public auditor or
independent authority until all submitted proposals are opened publicly, as
decided by the client.
4.6 A consultant should submit only one proposal if a consultant submits or
participate in more than one proposal for the same project such a consultant
shall be disqualified.
4.7 The tenders shall be rejected outright if:
a) Tender is in the name of person or firm who is not a consulting firm.
b) Tender fees and Earnest Money Deposit not received in the time prescribed
c) Offer submitted in physical form.
d) If the consultant has quoted rates with additional condition and counter
e) In case of any deviation in the terms of reference, terms and conditions of the
f) If the tender is not digitally signed by the consulting firm.
g) If the “Technical Bid” of any firm is decided as non-responsive the “Price Bid”
of that firm shall not be opened
h) If the rate are not workable.
5.0 PROPOSAL EVALUATION :
From the time the bids are opened to the time the contract is awarded any
effort made by the Firm to influence the Client in the Client's proposal
evaluation, proposal comparison or contract award decisions may result in the
rejection of the consultant's proposal.
5.2 Evaluation of Technical Proposals:
The individual member of the evaluation committee appointed by the Client
will carry out the evaluation of proposals on the basis of mandatory
requirement for general and specific criteria and scoring criteria specified in
the section 2 (c) eligibility criteria for qualification. Each responsive proposal
shall be preliminarily evaluated to assess their performance and their
capability with respect to mandatory requirement for general and specific
criteria. Based on this evaluation of responsiveness of bid shall be decided.
The consultant do not satisfy this mandatory requirement, their bid will be
considered non responsive. No further evaluation shall be made for such bid
and the consultant disqualifying for further evaluation. Each responsive
proposal shall be further evaluated for technical content and will be given a
technical score (St). Any proposal found unsuitable shall be rejected at this
stage if it fails to achieve the minimum technical score indicated in the section
2 (c) eligibility criteria for qualification The Client shall notify consultants of the
rejection of their Technical Proposal indicating that & their Financial Proposals
shall remain unopened after completing the selection process.
For technical scoring a weightage of 100 marks is assigned. To qualify
technically, it is required that a consultant should score minimum 60% marks
in the following two individual parameters (group) and at least 80 marks
5.3 First Stage Evaluation for qualification:
The qualification of the consultants offer shall be based on mandatory qualifying
requirement and further by marking system proposed as under:
Group No Category Maximum
1. Relevant Experience of the Consultant’s
Firm in last Five years in India
2. Relevant Experience of the Key Personnel
Any proposal not complying with the instructions or is poorly presented or has
omissions shall be liable to rejection at this stage.
5.4 The consultant who scores (Technical St) 60 % marks in each group and 80 marks out
of 100 marks as stated here in above shall be post qualified and included in the short
list for opening and evaluation of their financial proposals.
5.5 Public Opening and Evaluation of Financial Proposals;
After the completion of technical evaluation, The Client shall notify the successful
consultants that they have secured the minimum qualifying mark, indicating the date
and time set for opening the Financial Proposals.
The Financial Proposals shall be opened publicly in the presence of the consultants'
representatives who choose to attend. The name of the consultant, the quality
scores, and the proposed prices shall be read aloud and recorded when the Financial
Proposals are opened.
For financial evaluation, the total lump sum fee indicated in the Financial Proposal
shall be considered. GWSSB will determine whether the Financial Proposals are
complete, qualified and unconditional. The cost indicated in the Financial Proposal
shall be deemed as final and reflecting the total cost of services. Omissions, if any, in
costing any item shall not entitle the Firm to be compensated and the liability to fulfill
its obligations as per the RFP within the total quoted price shall be that of the
Consultant’ Firm
5.5.1 In order to allow comparison of financial proposal on a common basis, each financial
proposal will be carefully scrutinized and total price shall be determined. The score
for each financial proposal is inversely proportional to its total price. The lowest
financial proposal (Fm) will be given a financial score (Sf) of 100 points. The financial
score (Sf) of other financial proposal will be computed as under.
5.5.2 Formula for determining the financial scores:
Sf = 100 x Fm/F ,Fm is the lowest price and F the price of the proposal under
The weights given to the Technical and Financial Proposals are:
5.8 Combined and final evaluation
Proposals of the post qualified applicant consultants during the process of
evaluation of the technical bid will finally be ranked according to the total score
(Technical Score + Financial Score).
For this QCBS (Quality & Cost Based Selection) evaluation, the lowest evaluated.
Proposals will be ranked according to their combined technical (St) and financial (Sf)
scores using the weights (T = the weight given to the Technical Proposal; P = the
weight given to the Financial Proposal; T + P = 1) as under.
The Firm achieving the highest combined technical and financial will be
ranked as first
5.9 The Selected Applicant Consultant shall be the first ranked Applicant Consultant .The
second ranked Applicant Consultant shall be kept in reserve and may be invited for
negotiations in case the first ranked Applicant Consultant withdraws, or fails to
comply with the requirements specified hereinabove.
5.10 This evaluation procedure reflects the high importance attached to quality and
competence. Please note that the Client is not bound in any manner to select any of
the Firms submitting proposals or to select the Firm offering the lower price.
6.0 AWARD OF CONTRACT :
The allocation of the consultancy work will be decided by competent authority of client
without any prejudice to any consulting agency as per tender provisions. The consultant
who shall achieve highest combined score (technical and financial) may be considered
for allocation of consultancy work.
In case, if it may happen that there may be more than one first rank bidders based on
equal combined technical and financial scoring, the award of the consultancy work may
be decided based on the lowest quoted price among the first rank bidders.
Information relating to evaluation of proposals and recommendations concerning awards
shall not be disclosed to the consultants who submitted the proposals or to other persons
not officially concerned with the process, until the winning Firm has been notified that it
has been awarded the contract.
8.0 MODE OF EXECUTION
The works of Water Supply Project are spread over entire Gujarat state. A number of
works are to be taken up simultaneously in the state. The project works are to be taken
up under GWSSB. Therefore, the online tender for consultancy works are invited at the
level of head office of GWSSB. The receipt of tenders, evaluation of the bid, and
selection of consultant and award of work shall be processed at head office of GWSSB.
The successful consultant shall execute the agreement for consultancy work with The
Chief Engineer, Technical Cell, GWSSB, Gandhinagar. However the actual work shall be
performed with the concerned Executive Engineer or equivalent, Superintending
Engineer or equivalent, Chief Engineer or equivalent of the project under GWSSB. The
Chief Engineer Technical Cell, GWSSB shall issue the orders to the consultant stating
the name and location of the project, along with the name of concerned Executive
Engineer, Superintending Engineer, Chief Engineer in charge of the project and the
name of organization (GWSSB). The consultant shall be responsible to the concerned
officers in charge of the work for the implementation of consultancy work. The
performance of the consultant shall be monitored, reviewed based on the report of
project in charge of officers.
Information to Consultants
1 The name of the Client is Gujarat Water Supply and Sewerage Board.
The method of selection is Quality and Cost-Based Selection
The Guidelines are As mentioned in this RFP
2 Technical and Financial Proposals are Yes
3 The Assignment in phased Yes
Broadly, the role of PMC consultant shall be in
following phases.
The consultancy work shall be for new water
supply projects or for remodeling/ augmentation of
the existing project or for the project in which DPR
is already available with GWSSB
Survey and Investigation
Preparation of DPR
Bid Process Management
Pre-construction Activities
Activities during Construction
Defects correction Supervision
Post Construction Activities
Checking of detailed design and drawing of
civil work, M&E works, Hydraulic design,
to be prepared by the contractor is in the
scope of the PMC Consultant.
4 The main objectives and description of The broad role of the Project Management
the Assignment are Consultant shall be to act on behalf of GWSSB
to manage various Item rates /EPC/Turnkey
Water Supply Contracts of GWSSB, and the
responsibility shall include:
Survey and Investigation
Preparation of DPR(Drawing and
mapping of alignment and assets on PM
Assist GWSSB is bid process
management from preparation of bid to
evaluation and finalization of contract.
Assist GWSSB in carrying out
construction supervision, contract
administration progress monitoring,
quality control, testing, test check of
invoices, resolution of claim, change in
design, and taking over, and safety
management for all contracts.
Inspect mechanical and electrical
equipment at manufacturer’s works as
and when required in India and submit
an acceptance/rejection report for
considerations of GWSSB engineers
who will also witness such equipment
inspection along with consultant’s
inspection engineer(s).
Prepare project schedule and render
necessary assistance to GWSSB in
monitoring the project
Ensure time bound completion of the
works to be executed strictly as per the
specifications laid down in the bid
documents. Assist the GWSSB
Engineers for other project management
related activities of the contracts.
Carry out review of design and
construction documents furnished by the
Contractor. The review and approval of
Contractor’s designs shall run parallel to
the construction works
5 Scope of Services for Consultancy The scope of the Consultant can be broadly
Services classified in following areas.
Preparation of DPR
Bid Process Management
Construction Management Services
Inspection Activities during construction
Review Contractor’s Design and
Drawing documents
Commissioning activities
Identifying O& M needs
Supervision during Defects correction
Broad scope of work and term of
reference are provided in Section
6 A pre bid conference will be held As per NIT
7 The Client will provide the inputs / As mentioned in Request for Proposal.
assistance to the Firm
8 The Client envisages the need for No
continuity for downstream work
9 Proposals should be submitted in the English.
10 Firm / entity may associate with other No
short-listed Firm
11 Minimum required qualification of the Section 2(C)
Firm and experience
12 The minimum required experience of Section 2(C)
proposed key staff
13 Reports which are part of the English.
assignment must be written in the
14 The Client will provide the following Refer Section 4 Clause 6.8 of Terms of
inputs/ assistance Reference
15 The clauses on fraud and corruption in Section 5, GCC Clause
the contract are
16 Training is an important feature of this Yes
17 Cost In Indian Rupees
18 Validity of the Proposal 180 days after last date of submission
19 Clarification on Bid May be requested seven days before the last
submission date.
The address for requesting clarifications is ;
Shri Nirav P. Solanki
The Chief Engineer,
Technical Cell, GWSSB, Gandhinagar
20 The proposal submission address is The Chief Engineer,
addressed to Technical Cell
Gujarat Water Supply & Sewerage Board,
JalSeva Bhavan, Sector-10A,
Gandhinagar, Gujarat -
Technical Forms
Sl. Form No Content Remarks
1 3A Technical Proposal Submission Form
2 3B-1 Information on Consultancy firms organization
3 3B-2 ISO 9001 certification
4 3B-3 Information on blacklisting
5 3B-4 Key Personnel’s Employment Details For evaluation of Mandatory
6 3C-1 Financial Information of Consultants firm in Last Requirement.
7 3C-2 Firm’s experience in water supply projects in last Forms will be opened for
Five years those consultants who have
8 3C-3a Firm’s experience in Mild Steel pipeline work in submitted EMD and Bid
last Five years Processing fee online as well
9 3C-3b Firm’s experience in metallic and non metallic as in physical form For
pipeline work in last Five years evaluation of Specific Criteria.
10 3C-4 Firm’s experience in PMC services in Drinking
Water supply project in last Five years
11 3D-1 Experience of the firm in pipeline works for water Forms will be opened for
supply projects (RCC/ HDPE/DI) those consultants who have
12 3D-2 Experience of the firm in engineering of water passed the mandatory
intake system requirement.
13 3D-3 Experience of the firm in engineering of high
head pumping system with surge protection For Technical Scoring. Forms
device will be opened for those
14 3D-4 Experience of the firm in water treatment plant consultants who have passed
15 3D-5 Experience of the firm in water storage reservoir the mandatory requirement
16 3D-6 Team Composition and Task assigned and specific criteria
17 3D-7 Format for the Curriculum Vitae
18 3E-1 Comments and suggestions on RFP and on data,
services, facilities to be provided by the client
The formats mentioned above shall only be opened of those consultants who have
submitted details of EMD and bid processing fee in the format online as well as
instruments in physical form as prescribed in Data sheet.
ELIGIBILITY CRITERIA FOR QUALIFICATION
ELIGIBILITY CRITERIA FOR QUALIFICATION
To qualify, the consultant must have to satisfy the following Mandatory
(General & Specific) qualifying requirements.
1.0 General Requirement
(a) The Firm must have an office in India, operating for minimum last 5 Years. The Firm can
be a proprietary/ Partnership/ Company. (certificate of incorporation and PAN Card must
be furnished with technical proposal)
(b) The Firm must be having an ISO:9001 certification valid as on last date of bid
submission. (A copy of the certificates must be furnished with Technical Proposal)
(c) The Firm should not have been blacklisted or debarred by any Government / Semi
Government Organizations / funding agency (e.g. World Bank, ADB, NABARD etc.)
and/or Record of Poor performance at the time of bid submission.
(d) The experience and financial capability of parent company shall not be considered in
case of any Indian Subsidiary.
(e) Firms are not allowed to form Joint venture or Consortium with other Firms.
Subletting or subcontracting of any part of work except survey and soil investigations is
(f) Experience of personnel in consultancy organizations shall only be considered.
However in case of Financial Analyst and Legal Expert engaged by the consultant, the
experience of that analyst/ expert may be considered.
2.0 Specific Requirement
The Firm shall have a minimum Annual Turnover of Rs. 10.0 (Rupees Ten) crore per
annum from professional fees in any 2 (two) financial years during last Five years from Indian
Operations only. (Audited Balance sheet from certified Chartered Accountant to be furnished)
The turnover of previous year and cost of completed/executed similar nature of work shall be
given additional weightage of ten percent per year to bring them to current price level to
account for price escalation as illustrated below:
Financial Year Turnover/Cost of Effective cost of executed work at
Executed work previous completed financial year’s price
Financial year means period beginning from the 1st April to 31st March of the next year.
The details pertaining to Turnover for the year 2021-2022 to 2023-2024 shall be
certified by Chartered Accountant on his own letter head and duly attested.
(a) Firm must have experience as PMC/CSC services for successfully implemented/
commissioned drinking water supply and /or sewerage projects in last Five years of total
project value of not less than Rs. 500 Crores and the scope of the projects may include
survey and investigation, preparation of Detailed Project Report/ Feasibility Report,
engineering design, cost estimates, bid documentation, evaluation of bids and
preparation of contract documents, construction supervision/Project management
services & commissioning of the system for projects in India. However cost estimates, bid
documentation, evaluation of bids and preparation of contract documents, construction
supervision/Project management services & commissioning of the system for projects in
India are mandatory for the scope of projects mentioned above. (Furnish copy
performance certificate issued by the Owner/Employer not below the rank of Executive
(b) The Firm should have experience as PMC/ CSC services of M.S. Pipe of the dia.
mm and above, of length at least 25 KM in any one year of last Five years. OR
M.S. Pipe of the dia. 600 mm and above, length at least 10 KM and other metallic and
non-metallic pipe of dia. 200 mm and above of length at least 15 km. in any one year of
last Five years.
(Furnish copy performance certificate issued by the Owner/Employer not below the rank
of Executive Engineer).
(c) The Firm should have experience in Project Management Services of at least one
drinking water supply Project of the value of not less than Rs. 500 Crores in last Five
(d) In case consultant fails to satisfy the above requirements, the bid shall be considered non
responsive and shall not be considered for further evaluation and the consultant shall be
disqualified at the stage.
3.0 Scoring Criteria
The relevant experience of the firm shall be evaluated based on the marking system
as under. The consultant shall have to satisfy the following criteria and as per the
performance, marking shall be given and accordingly evaluation shall be made.
Note:- The consultant shall have to secure minimum 60% marks in each group
mentioned above and total of all the two groups shall be minimum 80%.
Group Parameter Maximum Criteria
1 Relevant 50 1. Experience of the firm as a PMC/CSC consultant in
Experience water conveyance system in M.S. pipeline with inside
of the lining / outside coating for a minimum length of 25 km
for pipe size of 600 mm minimum, in any one year of
Five years in last Five years.
India Above 1000 mm – 10 Marks
Above 800 mm upto 1000 mm – 08 Marks
600 mm upto800 mm – 06 Marks
{following 1(a) + 1(b)}
1 (a) Experience of the firm as a PMC/CSC consultant
in water conveyance system in M.S. pipeline with inside
Lining / outside coating for a minimum length of 10 km
and for pipe size of 600 mm minimum, in any one year
of last Five years.
Above 1000 mm – 05 Marks
Above 800 mm upto 1000 mm – 03 Marks
600 mm up0to 800 mm – 02 Marks
1 (b) Experience of the firm as a PMC/CSC consultant
in water conveyance system in Non metallic pipe of
dia. 200 mm and above of length at least 15 km
in any one year of last Five years.
Above 200 mm – 05 Marks
Above 100 mm upto 200 mm – 03 Marks
Below 100 mm – 02 Marks
Note : The Consultant shall submit details as per Para
no 1 above OR alternatively as per Para 1(a) plus 1(b).
2 Experience of the firm as a PMC/CSC consultant in
Group Parameter Maximum Criteria
intake well of 25 MLD, in a single contract at one
Above 100 MLD – 10 Marks
Above 50 MLD and upto100 MLD – 08 Marks
25 MLD and upto50 MLD – 06 Marks
3 Experience of firm as a PMC/CSC consultant in
SITC of Pumping machineries having minimum
installed capacity of 1000 m3/hr and above along
with all associated control system and
instrumentation, in a single contract at one location.
Above 3,000 m3/hr– 10 Marks
Above 2,000 m3/hr upto 3,000 m3/hr – 08 Marks
1,000 m3/hr up to 2,000 m3/hr – 06 Marks
4 Experience of the firm as a PMC/CSC consultant in
water treatment plant/ Sewerage Treatment Plant
with automation and instrumentation system with
control room facilities for treating raw water of
minimum capacity 10 MLD to CPHEEO/ WHO
standards, in a single contract.
capacity Without With
automation automation
Above 50 MLD 09 Marks 10 Marks
Above 20 MLD 07 Marks 08 Marks
10 MLD 05 Marks 06 Marks
5 Experience of the firm as a PMC/CSC consultant in
storage reservoirs of R.C.C. construction with total
capacity above 5 ML for a reservoir, in a single
Above 15 ML –10 Marks
Above 10 ML up to 15 ML –08 Marks
5 ML upto 10 ML – 06 Marks
2 Relevant 50 1 Project Manager (Team Leader) 10 Marks
Experience 2 Construction Manager 10 Marks
of the Key 3 Survey Expert (GIS/GPS/
All type of Survey) 5 Marks
4 Geotechnical Engineer 1 marks
5 Geologist/ Geo-hydrologist
Group Parameter Maximum Criteria
/ Geo physics’ 1 mark
6 Structural Design Engineer 5 Marks
7 Water Supply Expert / 2 Marks
(network design expert)
8 Water Treatment Plant Expert 4 Marks
9 Procurement Engineer 2 Marks
/Contracts Evaluation Engineer
10 Financial Analyst 1 Marks
11 Legal Expert 1 Marks
12 Quality control & Quality
Assurance Engineer 2 mark
13 Mechanical Engineer 1 Marks
14 Electrical Engineer 1 Marks
15 Instrumentation & Control Engineer 1 Marks
16 Construction Engineer(Site engineer) 2 marks
17 Safety Engineer 1 Marks
The weightage to be applied for qualification,
experience etc. of the staff for the assignment are
General qualification - 30%
Master’s degree -
Graduate degree -
Relevant Experience - 40%
Above 15 years -1.00
Above 10 and upto 15 years -
Below 10 years -
Full time permanent staff – 30%
More than 2 years -
Team Composition – Key Personnel
All the key staff proposed shall be regular full time employees of the firm for not less than
months and the age of maximum 65 years shall be considered prior to date of submission of the
However in case of Financial Analyst and Legal Expert the experience of the person engaged by
the consultant for their firm may be considered.
Copy of the TDS/PF statement of staff must be attached as a proof.
No Position Minimum Qualification Minimum Experience
1 Project Manager M.E/ M.Tech in 15 year of experience in design
(Team leader) Environment Engineer / and execution of drinking water
Public Health Engineer /
No Position Minimum Qualification Minimum Experience
Water/ Civil/ Hydraulic supply
2 Construction Manager B.E Civil Engineering 15 years of experience in
construction activities of water
supply quality assurance and
quality control works.
3 Survey Expert B E in Civil Engineering 05 years’ experience in all type
(GIS/GPS/All type of of survey through total
Survey) station/GIS/GPS etc.
4 Geotechnical Engineer ME in Geotechnical 05 years of experience in
Engineering / Foundation geotechnical investigation,
engineering / Soil analysis of foundation strata,
foundation treatment etc.
5 Geologist/ Geo- M.sc in Geology /Geo- 05 years of experience in
hydrologist / Geo physist hydrology /Geophysics engineering geology/ Geo
physics/ Geological
6 Structural Design M. E. in Structural Design 10 years of experience in design
Engineer of water supply structures,
7 Water Supply Expert ME ( Hydraulics / 10 years of experience in water
Environmental Engineering supply projects
/ Water resources
8 Water Treatment Plant M E in Environmental 10 years of experience in
Expert Engineering design, planning, and vendor
drawing review of water
treatment plants.
9 Procurement Expert/ B E in Civil / Mechanical 10 years of experience in
Contracts Engineer Engineering preparation of Prequalification
and Bid documents, evaluation
of bids and familiarity of FIDIC
and other various types of
Government contract
Preference may be given in
evaluation for B E in Civil /
Mechanical Engineering with
10 Financial Analysts MBA in finance or CA/ ICW Minimum of experience of
or Equivalent years working in Infrastructure
11 Legal Expert LLB in general and 15 years experience in Techno-
Associated Member of Legal Arbitration, Litigation and
company Secretary company secretarial services..
12 Quality control & Quality B.E. Civil Engineering 10 years of experience in quality
Assurance Engineer control and quality assurance of
water supply projects
13 Mechanical Engineer B.E.(Mechanical 10 years of experience in water
No Position Minimum Qualification Minimum Experience
Engineering) supply projects, quality
assurance and quality control
14 Electrical Engineer B.E.(Electrical 10 years of experience in water
Engineering) supply projects, quality
assurance and quality control
15 Instrumentation & B.E/B.Tech in Electrical/ 10 years of experience in
Control Engineer Instrumentation/Electronics instrumentation engineering
16 Construction Engineer B E Civil Engineering 10 years of experience in
(Site Engineer) construction supervision and
planning of water supply
projects, quality assurance and
quality control works.
17 Safety Engineer B E in Civil / Mechanical 10 years of experience in
Engineering construction supervision and
worked as safety engineer.
18 Support staff for Diploma in Civil/ Minimum 1 years experience in
supervision of execution Mechanical/ Electrical case of Diploma in Engineering
on field Engineering / ITI In case of ITI, Minimum 3 years
certificate holder
experience in construction
1. The Consultant may assess the requirement of the support staff mentioned in Sr no 18 at
the time of bidding.
2. Actual requirement shall be decided in consultation with Engineer- In-charge of project of
GWSSB during work programming of project. Accordingly, consultant shall have to
engage support staff on field during execution.
3. In the evaluation, key staff mentioned above in Sr. No 1 to 17 shall be considered .
SPECIAL INSTRUCTIONS
SPECIAL INSTRUCTIONS
Information to Consultants
1.0 Submission of Proposal:
Your proposal shall be submitted in two parts, viz.
Technical proposal for qualification
Financial Proposal i.e. Price Bid.
The proposal is to be submitted on online and hard copy as described in the RFP
documents. The consultant is advised to take care that all the formalities are completed as
required. These include:
1. Bid processing fee of Rs. 24,000/- (Twenty Four Thousand) is paid and its scan copy of
receipt is submitted online by uploading scanned copy of the same.
2. EMD of Rs 30.00 lakh is paid in required format and its receipt / document is submitted
online by uploading the scanned copy of the same.
3. Selection of consultant by the agency will be quality and cost based selection (QCBS)
method out of firms responding to the RFP.
2.0 Technical proposal for qualification:
The technical proposal for qualification shall demonstrate firm’s general and specific
experience in water supply projects in the area of project management, supervision of
construction, inspection and quality control aspects of project typically having components
pipes, pumps, motors, valves etc. The technical proposal should also demonstrate
resources for carrying out engineering supervisor services.
The technical proposal shall also demonstrate the Firm's understanding of the project
requirements and of the requisite tasks set forth in the Request for Proposal, as included in
Section - 4. The technical proposal shall not contain any cost information whatsoever related
to the Services to be rendered. The information and documentation to be provided in the
technical proposals is listed below and shall be provided in the specific format as indicated
(a) Information of the history, background, organization, registration and legal status (Pvt.
Ltd., Ltd. Co., Partnership, etc.) and on general experience and experience of similar
nature as the services put to proposal of your Firm.
(b) Descriptions, in the format enclosed, of the works carried out by consultancy Firm, if
any. The experience so claimed shall be limited to projects for which your Firm and
associate(s) were legally contracted as (a) corporate entity(ies).
(c) Financial information regarding your Firm.
(d) A description of the general understanding of the Firm about the projects and the
approach the Firm will take to carry out the services based on the requirements of the
Request for Proposal. Such description may include as deemed relevant and also
comprise comments on the Request for Proposal or other aspects of the services to be
rendered. e.g. site supervision procedures, methods of measurements and acting in the
capacity of Engineer in the manner determined, which may contribute to performance in
carrying out the services.
(e) A work program, which shall distinguish clearly between the phases of
Detailed Project Report
Bid Process management
Checking and approval of detailed design and construction documents of the
Pre-Contract work
Contract Management, inspection of materials and supervision of construction
Defects Correction Supervision
Post contract work Supervision
For each phase, the program shall include an organization chart, an activity Bar-Chart
and a staffing schedule, consistent with the construction contract information enclosed
herein or otherwise made available to the consultant. The staffing schedule shall clearly
indicate the duration of the assignments of proposed staff to be employed on the site of
the works and elsewhere. Generally, it is considered that a competent consultant is
able to carry out the pre-contract work with minimal time inputs. In taking account of
this, consultant may presume proper coordination by the Client between the
mobilization of the consultant and the contractor.
Regarding project management, inspection of materials and Supervision of
construction, Consultant shall consider the need for staff inputs such that standard
Procedures of GWSSB are adhered to while any checking of contractor's work and
subsequent approval of certificates for payment by the Client can be carried out quickly
and efficiently.
The consultant must establish proper system for site working procedures,
documentation and communication. The Consultant is expected to provide full-time staff
for qualitative and quantitative inspection of works', experienced in works like pipeline,
reinforced concrete construction, mechanical and electrical installation including
instrumentation & automation.
In determining staff inputs, Agency shall give due attention to certain complicated parts
of the construction works, which will in particular cases be carried out under day work
provisions like e.g. rehabilitation of existing facilities, etc. However, depending on the
caliber of the proposed staff, additional inputs for such parts of the works shall be
Under this consultancy, Agency will be required to appoint a “Project Manager for
project management services including construction Supervision Services &
inspection of materials” to act on his behalf in managing office works & site
supervision in carrying out all contractual and administrative activities based on the
requirements of the Request for Proposal. The “project manager or person
authorized by project manager” is key functionary and evaluation of the technical
proposals will be influenced significantly by the caliber of the person proposed; apart
from being management expert / technically competent, he must be familiar with and
capable to carry out all procedural activities required.
To provide proper contract management, inspection of materials and supervision of
construction, it is expected that, for the purpose of this Contract Agreement, supervision
during the defects correction period will be limited to routine site visits, by the “Project
Manager” to ensure outstanding work is completed and to supervise the functioning of
the trained operators. Any other requirements will be on a Client-demanded basis and
paid for pro-rata according to rates entered into the Contract Agreement.
For all components of the service, Agency shall provide adequate backstopping from
his head/ branch office. Whilst such backstopping will normally be considered part of
the Firm's overheads, Agency may- depending on the caliber of the staff proposed-
provide for this separately at risk to his financial competitiveness.
(f) A named list of proposed staff including location and duration of assignments as well as
proposed positions shall be submitted by the consultant. Number and the qualifications
of the staff required are provided in the specific criteria.
Full curriculum vitae of all staff proposed, in the format enclosed, shall be part of the
technical proposal. The curriculam vitae shall comprise a description of academic or
trade qualifications and of previous exposure to work related to their proposed
(g) A list of facilities and provisions required to provide the service.
3.0 Financial Proposal
The financial proposal shall be quoted as a percentage of project cost for project
management services including Supervision of construction and inspection of materials as
given in the price bid. This cost shall contain the details of costs together with breakdowns
as listed in the price bid.
(a)The costs shall be given for the following phases of work, i.e.
Survey and investigation
Detailed Project Report
Bid Management process
Pre-contract work
Contract management, inspection of materials & Supervision of construction
Defects correction supervision
Post Contract work
In due consideration shall be given of the pertaining descriptions of the Request for
Proposal as included in Section - 4 and of the following.
i.) The period for preparation of DPR and DTP’s s expected to be three months
ii.) The Period for the Pre-contract work is assumed at one weeks and shall be used to
ensure that all head/ branch office and site staff to be involved fully understands
The Contract Agreement
The design and construction contract documentation
The activities and tasks required under their proposal position
The particular procedures and ways of interaction with the Employer and the
The period shall also include for the consultant's mobilization prior to the contractor
entering the site.
iii.) Request for proposal for appointment of Project management consultancy (PMC)
including supervision services for water supply project in Gujarat is “Twenty Four
months”, from date of work order issued to the Consultant, which includes the
contractor’s mobilization period. The Firm shall base his pricing on this duration and
account for various items in the construction contract, material and equipment to be
inspected at various vendor premises located anywhere in the country, review of
construction documents, activities during bid process management. It is clarified that
the cost towards travel of consultant’s staff for third party inspection in/outside Gujarat
shall not be reimbursed separately by GWSSB and it shall be borne by the consultant.
Consultant may increase / decrease the staff as per work load of the project during
particular stage of work’s execution but with the permission of Engineer – In – Charge
in consultation with Concern Chief Engineer of project.
(Engineer – In – charge means concern Executive Engineer of the concerned project)
iv.) The “Defects Correction Supervision” will be of duration of 36 (Thirty Six) months
from the date of issue of the certificate of completion to the contractor. During this
period, permanent presence of Agency staff on site is not necessary. However, The
Team Leader during contract management and Supervision of construction shall be
on standby to be available for a site visit at any time on 48 hours notice by the Client.
v.) Post Contract Work will be of duration of four weeks and shall be used to
The removal of all material, plant, equipment and staff from the site by the
contractor, agree with the Client and the contractor on all monies owed to or by the
contractor, including the remaining retention money, and release all guarantees
and securities in accordance with the provisions of the construction contract.
After clearing up of the site by the contractor is complete, carry out all work
required to close the construction contract administratively.
(b) For each phase of the works, Agency shall consider the costs on following
accounts in his pricing.
i.) Professional staff
Requisite professional staff for bid process management review of documents &
project management services, services and inspection of materials & equipments.
Some of these professional staff shall be at site of work, for which office setup will
The price of the consultant shall be all inclusive of salaries, social charges,
overheads, charges for travel of staff from home to site and field allowances for
boarding and lodging, etc.
ii.) Transportation
The consultant shall make adequate transportation facilities including running and
maintenance, driver's wages, charges and allowances, consumables and any
other accountable and variables. This facility shall be available throughout the
period of project implementation. These facilities shall also be considered while
quoting Firm and fixed price under this project management consultancy services.
iii.) Site Office and equipment
The price quoted by the consultant shall be all-inclusive for site office
accommodation & equipments which shall cover rent/ depreciation, operation,
running and maintenance, costs for document reproduction, communication,
support staff like draughtsman, tracers, office staff, computer operator with
AutoCAD knowledge etc. and any other accountable and variables.
iv.) Other expenses (if any)
(a) Any expenses not covered anywhere in foregoing paras but essential for
effective, efficient project contract management shall be covered in price
quoted by the consultant.
(b) Price quoted shall be fixed for the duration of the contract agreement, except
as otherwise provided for therein.
(c) Cost as per the breakdown of price requested in the price bid to entered in
required format provided. All rates and amounts shall be quoted in figures and
words. The rates in words shall be governing in the event of a discrepancy
between figures and words.
4.0 Joint venture is not allowed.
TECHNICAL PROPOSAL - STANDARD FORMS
Sl. Form No Content Remarks
1 3A Technical Proposal Submission Form
2 3B-1 Information on Consultancy firms organization For evaluation of
3 3B-2 ISO 9001 certification
Forms will be opened
4 3B-3 Information on blacklisting for those consultants
who have submitted
5 3B-4 Key Personnel’s Employment Details EMD and Bid
Processing fee online
as well as in physical
6 3C-1 Financial Information of Consultants firm in Last form For evaluation of
Five years Specific Criteria.
7 3C-2 Firm’s experience in water supply projects in last
Forms will be opened
8 3C-3a Firm’s experience in Mild Steel pipeline work in for those consultants
last Five years who have passed the
9 3C-3b Firm’s experience in metallic and non metallic mandatory
pipeline work in last Five years requirement.
10 3C-4 Firm’s experience in PMC services in Drinking For Technical Scoring.
Water supply project in last Five years Forms will be opened
11 3D-1 Experience of the firm in pipeline works for water for those consultants
supply projects (RCC/ HDPE/DI)) who have passed the
mandatory requirement
12 3D-2 Experience of the firm in engineering of water and specific criteria
13 3D-3 Experience of the firm in engineering of high head
pumping system with surge protection device
14 3D-4 Experience of the firm in water treatment plant
15 3D-5 Experience of the firm in water storage reservoir
16 3D-6 Team Composition and Task assigned
17 3D-7 Format for the Curriculum Vitae
18 3E-1 Comments and suggestions on RFP and on data,
services, facilities to be provided by the client
TECHNICAL PROPOSAL SUBMISSION FORM
(Location, Date)
From :( Name of Firm) To: (Name & Address of Client)
Ladies/Gentlemen:
Subject: Selection of Consultant for Project management services including construction
supervision services for various water supply projects of GWSSB.
We, the undersigned, offer to provide the Consultancy services for the above in
accordance with your Request for Proposal dated ------, We are hereby submitting our
Proposal which includes this Technical Proposal, and Financial Proposal submitted online.
We understand you are not bound to accept any proposal you receive.
Yours sincerely,
Authorized Signature:
Name and Title of Signatory:
INFORMATION ON CONSULTANCY FIRMS ORGANISATION
Sl. No. Information Details Remarks
1 Name of the Firm :
2 Year of incorporation : Certified copy of
incorporation to be
3 Place of incorporation :
4 Type of organization :
(Partnership/Privately
held/Publicly held)
5 No. of years of operation in :
6 Areas of business :
7 Number of technical employee :
8 PF Registration number :
9 PAN Detail : Certified copy to be
10 Brief profile of the firm : Separate document
may be attached
Authorized Signature:
Name and Title of Signatory:
ISO 9001 CERTIFICATION
Sl. No. Information Details Remarks
1 Name of the Firm :
2 Year of receipt of ISO :
Certification for the first time
3 Name of ISO Auditor :
4 Latest re-certification audit :
held in the year
5 Certified copy of the latest : To be attached
Authorized Signature:
Name and Title of Signatory:
INFORMATION ON BLACKLISTING
Sl. No. Information Details Remarks
1 Attached affidavit, in
Was the consultant firm ever case no history of
blacklisted by any government blacklisting
/ non-government / private
agency/ organization/
institution / funding agency
and/or record of poor
performance at the time of
submission of the bid.
2 Is the consultant firm
blacklisted or in state of poor
performance at the time of bid
Authorized Signature:
Name and Title of Signatory:
KEY PERSONNELS’ EMPLOYMENT DETAILS
Sl. Proposed Name of Date of No. of Number of years Permanent/
No. Position the Person Joining of years of of Service with Contract
Consultant’s experience the Consultant’s Employee
Firm Organization
Note: Attach Copy of the TDS and PF statement for each of the proposed key staff as per
the table above.
Authorized Signature:
Name and Title of Signatory:
FINANCIAL INFORMATION OF CONSULTANT’S FIRM LAST SEVEN YEARS
Note: Attach Copy of the audited Balance Sheet certified by Chartered Accountant
Authorized Signature:
Name and Title of Signatory:
FIRM REFERENCE IN WATER PROJECTS IN LAST FIVE YEARS
Assignment Name : Country :
Location within country : Professional Staff Provided by
Your Firm/ Entity (profiles) :
Name of Client : No. of staff :
Address : No. of Staff -Months; duration of
Start Date Completion Date Value of consultancy
(Month/Year) : (Month/Year) : services:
Name of Associated Consultants, if No. of Months of professional Staff,
any : provided by Associated Consultants
Name of Senior Staff (Project Director/Coordinator, Team Leader) involved and
functions performed :
Narrative Description of Project :
Description of Actual Services* Provided by Your Staff :
Note. : Attached separate sheet for each work.
Authorized Signature:
Name and Title of Signatory:
FORM 3C-3A – For MS pipe
FIRM’S EXPERIENCE IN MILD STEEL PIPELINE WORKS
Sr. Name Water Project Client Type of Mild steel Pipeline Commissioning / Project
No of Supply Location Consultancy Commencement Duration
Project Projetct services of Operation (Months)
Name Client’s provided (PMC/
each pipeline dia, >or = 600 mm .
Detailed Design
Maximum length of pipeline laid
Material of Internal and External
Total Length (km) of pipeline of
supervision/PMC services, for
engineered supervised for the
Contact Engineering/Con
Diameters, >or = 600 mm
in a year (km/yr) during
each dia, >or = 600 mm
consultant’s tenure of
Design Flow (m3/s)
(Address, Supervision)
Telephone, and Duration
Fax etc) (Months) of
1. The project in which size of MS / Steel pipe is lower than 600 mm dia shall not be mentioned.
2. Projects successfully implemented and commissioned between FY 2020-21 to FY 2024-25 are to be mentioned, chronologically
3. The length of pipe line shall be only for a particular dia and not for a range of diameter.
4. Attach Client certification
Authorized Signature:
Name and Title of Signatory:
FORM 3C-3B for Metallic and non-metallic pipe
FIRM’S EXPERIENCE IN METALLIC AND NONMETALLIC PIPELINE WORKS (Except MS Pipeline)
Sr. Na Water Project Client Type of Metallic and Nonmetallic Pipeline Commissioning / Project Duration
No me Supply Locati Consultan Commencement of (Months)
of ? on cy Operation
Proj Name Client’s services
services, for each pipeline dia, >or
Maximum length of pipeline laid in
a year (km/yr) during consultant’s
Total Length (km) of pipeline of
engineered supervised for the
Type of pipe(metallic and non
tenure of supervision/PMC
Diameters, >or = 200 mm
each dia, >or = 200 mm
Design Flow (m3/s)
(Addres Engineeri
ne, Fax Supervisi
Services Date FY
1. The project in which size of metallic and non-metallic pipe is lower than 200 mm dia shall not be mentioned.
2. Projects successfully implemented and commissioned between FY 2020-21 to FY 2024-25 are to be mentioned, chronologically
3. The length of pipe line shall be only for a particular dia and not for a range of diameter.
4. Attach Client certification
Authorized Signature:
Name and Title of Signatory:
FIRM’S EXPERIENCE IN PMC SERVICES IN DRINKING WATER SUPPLY PROJECT
Sr. Name of the Project System Client Project Cost of Status of Date Time Date of Actual Actual cost
No Drinking Water Locatio Capacit cost in Consultanc the of limit completio date of of
supply Project n y (ml/d) Rs. Cr. y services project start n completio consultanc
1. Projects successfully implemented and commissioned between FY 2020-21 to FY 2024-25 are to be mentioned, chronologically
2. Attach Client certification
Authorized Signature:
Name and Title of Signatory:
EXPERIENCE OF THE FIRM IN PIPELINE WORKS FOR WATER SUPPY PROJECTS (RCC/HDPE/DI )
Sr.No Name Water Project Client Type of Consultancy Pipeline Commissioning / Project
of Supply? Location services provided (PMC/ Commencement Duration
Project Detailed Design of Operation (Months)
Name Client’s Engineering/Construction
Persons Supervision) and
Contact Duration (Months) of
Information Consultancy Services
1. Projects successfully implemented and commissioned in last Five years are to be mentioned, chronologically
2. Attach Client certification
3. Only the project having pipeline dia. Greater than or equal to 100mm for RCC/HDPE/DI pipe shall be mentioned.
Authorized Signature:
Name and Title of Signatory:
EXPERIENCE OF THE FIRM IN ENGINEERING OF WATER INTAKE SYSTEM
Sr. Name Project Client Type of Consultancy Water Intake System Commissioning / Project
No of Location services provided Commencement of Duration
Project (PMC/ Detailed Operation (Months)
Name Client’s Persons Design
Contact Information Engineering/Constru
(Address, ction Supervision)
Telephone, Fax etc) and Duration
1. Projects successfully implemented and commissioned in last Five years are to be mentioned, chronologically
2. Only projects having raw water intake capacity greater than or equal to 25 ml/d to be indicated
3. Attach Client certification
Authorized Signature:
Name and Title of Signatory:
EXPERIENCE OF THE FIRM IN ENGINEERING OF HIGH HEAD PUMPING SYSTEM WITH SURGE PROTECTION
Sr. Name Project Client Type of Consultancy Pumping System Commissioning / Project
No of Location services provided Commencement of Duration
Project (PMC/CSC ) and Operation (Months)
Name Client’s Persons Duration (Months) of
Rated Head (mwc)
Motor Rating (kw)
Contact Consultancy Services
1. Projects successfully implemented and commissioned in last Five years are to be mentioned, chronologically
2. Only projects having pumping capacity greater than or equal to 1000 m3/hr and along with control system and instrumentation in a single project at one location to be
3. Attach Client certification
Authorized Signature:
Name and Title of Signatory:
EXPERIENCE OF THE FIRM IN WATER TREATMENT PLANT
Sr. Name Project Client Type of Consultancy Water Treatment Plant Commissioning / Project
No of Location services provided (PMC/ Commencement of Duration
Project Detailed Design Operation (Months)
Name Client’s Persons Engineering/Construction
Contact Supervision) and Duration
Information (Months) of Consultancy
1. Projects successfully implemented and commissioned in last Five years are to be mentioned, chronologically
2. Only projects having water treatment plant capacity greater than or equal to 10 ml/d are to be indicated
3. Attach Client certification
Authorized Signature:
Name and Title of Signatory:
EXPERIENCE OF THE FIRM IN WATER STORAGE RESERVOIR
Sr. Name Project Client Type of Consultancy Water Storage Reservoir Commissioning / Project
No of Location services provided (PMC/ Commencement of Duration
Project Detailed Design Operation (Months)
Name Client’s Persons Engineering/Construction
Contact Supervision) and Duration
Information (Months) of Consultancy
(Address, Services
1. Projects successfully implemented and commissioned in last Five years are to be mentioned, chronologically
2. Only projects having Water Storage Reservoir capacity greater than or equal to 5 ml are to be indicated
3. Attach Client certification
Authorized Signature:
Name and Title of Signatory:
Team Composition and Task Assigned.
Name Number of Task Assigned Man month
Number of years proposed for
No of Educational
Sr no Category years of employed month duration
staff Qualification
experience with the of service of the
firm consultant
1 Project Manager (Team
2 Construction Manager
3 Survey Expert (GIS/GPS/All
type of Survey)
4 Geotechnical engineer
5 Geologist/ Geohydrologist /
6 Structural Design Engineer
including 1 hydraulic design
7 Water Supply Expert
(Network design expert)
8 Water Treatment Plant
9 Procurement Engineer /
Contracts Evaluation
10 Financial Analysts
11 Legal Expert
12 Quality control and Quality
assurance Engineer
Name Number of Task Assigned Man month
Number of years proposed for
No of Educational
Sr no Category years of employed month duration
staff Qualification
experience with the of service of the
firm consultant
13 Mechanical Engineer
14 Electrical l Engineer
15 Instrumentation & Control
16 Construction Engineer(
17 Safety Engineer
18 Support staff for supervision
of execution on field as per
1. The Consultant may assess the requirement of the support staff mentioned in Sr no 18 at the time of
2. Bidder shall deploy minimum manpower as below:
Sr.No Size of project Project In charge Civil Engineer Electro
1 Less than Rs. 10 crores 1 ( Minimum) 1 ( Minimum) 1 ( Minimum)
2 More than Rs. 10 crores and 1 ( Minimum) 2 ( Minimum) 1 ( Minimum)
less than Rs. 30 crores
Sr.No Size of project Project In charge Civil Engineer Electro
3 More than Rs. 30crores and 1 ( Minimum) 3 ( Minimum) 1 ( Minimum)
less than Rs. 50 crores
4 More than Rs50crores and less 1 ( Minimum) 4 ( Minimum) 1 ( Minimum)
than Rs. 70 crores
5 More than Rs. 70 crores and 1 ( Minimum) 5 ( Minimum) 1 ( Minimum)
less than Rs. 90 crores
6 More than Rs. 90 crores 1 ( Minimum) 6 ( Minimum) 1 ( Minimum)
3. Actual requirement shall be decided in consultation with Engineer- In-charge of projects of GWSSB
during work programming of projects. Accordingly consultant shall have to engage support staff on
field during execution.
4. In the evaluation, key staff mentioned above in Sr. No 1 to 17 shall be considered.
5. Projects will be allotted as and when required by GWSSB on need basis.
FORMAT FOR CURRICULAM VITAE
1 Proposed Position :
3 Date of Birth :
4 Nationality :
(The years in which
various qualifications
were obtained must be
6 Other Training :
7 Languages and Degrees :
8 Membership of :
Professional Societies
9 Countries/State of work :
10 Employment Record : (Starting with present position. List in
reversed order employment held)
Dates : From to
Position Held and :
Description of Duties
11 Detailed Tasks Assigned : Work Undertaken Which Best Illustrates
(List of tasks one by one Capability To Handle The Tasks Pertaining
and support each task by To The Proposed Position
project experience on the
right hand side)
: (List project names, locations, years,
positions held, i.e. supervision engineer,
site inspector, etc. with exact duties
rendered and time spent on each project)
12 Certification : I, the undersigned, certify that, to the best
of my knowledge and belief, this bio-data
correctly describe myself, my qualifications
and my experience.
I/We understand that any willful misleading statement described herein may lead to
disqualification.
Signature of Named Person :
Authorized Signature: :
Name and Title of Signatory: :
Name of Firm: :
Note: Consultant presented in format other than this will be rejected
Comments and suggestions on the Request for Proposal and on data, services, and
facilities to be provided by the Client
On the Request for Proposal:
On the data, services, and facilities to be provided by the Client
Consulting Firm's Name :
Authorized Signature:
Name and Title of Signatory:
BROAD SCOPE OF WORK
AND TERMS OF REFERENCE FOR
PROJECT MANAGEMENT SERVICESINCLUDING
CONSTRUCTION SUPERVISION SERVICES
BROAD SCOPE OF WORK AND TERM OF REFERENCE
FOR PROJECT MANAGEMENT SERVICES INCLUDING CONSTRUCTION
SUPERVISION SERVICE
1.0 Background Information
1.1 Drinking Water Scenario in Gujarat
Gujarat has been the engine of India’s industrial and economic growth contributing to the
Nation’s development. The State has many geographical advantages, viz. 1,600 km long
coastline, varied climatic conditions. In spite of the advantages, Gujarat too has its
problems associated with nature such as drought and erratic rainfall resulting in the
scarcity of water in almost 2/3rd area of the state.
The State has 5.96 percent of national geographic area with 4.03 percent population but
only 2.63 percent of country’s water resources. Availability of water varies from region to
region within the State. North Gujarat, Saurashtra and Kachchh face water scarcity. Per
capita fresh water availability is about 1,137 cubic meters per person per annum as
against the national average of 1,878 cubic meters.
Failing rains, poor recharge, deterioration of quality of water and excess withdrawal
leads to failure of resources and system becoming defunct. Throughout the year, vast
Government machinery is busy in meeting the emergency arrangement for ensuring
To overcome this situation, the State Government has conceived the Drinking Water
Supply Master Plan based on Sardar Sarovar Narmada Canals and other surface
sources. At present more than 14000 villages are covered with Multi village water supply
1.2 Organization and Management at GWSSB/GWIL Levels:
a) Project Execution:
GWSSB/GWIL has design, implement, maintained the bulk water pipeline RWSS
completed under this Narmada Master Plan Drinking Water Supply Project and
Regional Schemes based on surface/sub-surface sources.
b) Operation and Maintenance:
Due to the extension of the number of schemes operated by GWSSB/GWIL and addition
of augmented new schemes, required input of GWSSB/GWIL on O&M has increased
considerably. In the O&M GWSSB/GWIL maintain pipelines with pumping stations under
these projects.
Now GWSSB/ GWIL main focus is on O&M of main structural works, such as sources
(tapping points/ source), treatment plants, booster stations, reservoirs, transmission
main and village level facilities. After receiving the water at village O&M of village level
facilities are being maintained by village Panchayat.
1.3 Organization and Management at the Village Level:
Water And Sanitation Management Organization (WASMO) has been set up by Govt. to
look after village level management of water with active participation of community.
1.4 Water Supply Zones of GWSSB:
GWSSB is the organization set up by Government to carry out water supply activities in
the state. To perform the activity smoothly this state is divided into 6 zones and water
supply activity under each zone is carried out under the Chairmanship of Zonal engineer.
However, overall control is at Gandhinagar Headquarter under Chairmanship of Member
Zone Water Supply Activities to be performed in
Zone – I(Vadodara) Vadodara, Panchmahal, Dahod, Mahisagar,
Zone – II(Ahmedabad) Anand, Kheda, Ahmedabad, Gandhinagar,
Mehsana, Banaskantha, Patan, Arvalli, Sabarkantha.
Zone – III(Rajkot) Morbi, Surendranagar, Rajkot, Jamnagar,
Zone – IV(Kutch) Kutch
Zone – V(Junagadh) Bhavnagar, Amreli, Junagadh,
Porbandar,Botad,GirSomnath.
Zone-VI ( Surat) Dang, Surat, Tapi, Valsad, Navsari, & Bharuch,
2.0 Background of this consultancy service
(a) This Request for Proposal (RFP) is of this consultancy service for selection and
appointment of Consultants Project Management Services including
Construction Supervision Services through a Quality and Cost Based Selection
(QCBS) process for various Water Supply Projects for various villages/ULBs.
The works will be undertaken on behalf of the Government of Gujarat and funds
for the works will be obtained from the Government of Gujarat.
(b) The projects as a whole are monitored by the Gujarat Water Supply and
Sewerage Board (GWSSB) intends to appoint a consultant for execution of the
projects with respect to Bid process management, construction supervision and
inspection of materials. The projects are being implemented on modular basis
and in a phased manner. The eligible payments under this contract shall be
made from the funds received from the government of Gujarat and funding
(c) Each project will typically broadly comprise Water Intake System, Transmission
Pipelines, Treatment, Pumping Station, Pumping Machinery, Storage reservoirs
and other ancillary and appurtenant works.
(d) The projects envisaged under this contract are spread over the Gujarat state in
the five water supply zones of GWSSB.
(e) The extent of services of the PMC consultant will be from preparation of DPR,
managing bid process and finalizing Contractor for various type of contracts
and carry out construction supervision services
(f) The project already identified by GWSSB and it is expected that the PMC
Consultant will carry out necessary technical due diligence, carry out required
survey and site investigations and prepared detailed project report, including
cost estimate, tendering strategy and packaging of various type of Contracts
(g) Upon approval of DPR by GWSSB, the Consultant will prepare bid documents
and manage the bidding process leading to the Consultant will provide
construction Supervision and inspection services along with services during
defect liability period
3.0 Works subject of the consultancy service:
Broadly the Consultant will provide assistance to client in overall project
management and implementation of the Item rate/ EPC / Turnkey Contracts that
Survey and investigation
Preparation of Detailed Project Report (DPR)
Bid Process management,
Evaluation of Bids and assisting client in finalization of Contract,
Construction Supervision and Contract Administration,
Review of contractor’s construction document,
Inspection of materials, machineries and equipment
Assist in commissioning activities
Services during defects liability period.
4.0 Appointment of agency for project management services including construction,
supervision services
(a) GWSSB intend to appoint Consultants for Project Management and
Construction Supervision Consultancy services from qualified, technically
competent, experienced consultancy agencies with a view to ensure quality
assurance, timely completion of the projects within the determined costs and
without any time and cost overrun.
The consultancy work shall be for new water supply or for re-modeling/
augmentation of the existing project or for the project in which DPR is
already available with GWSSB
(b) The GWSSB will appoint a reputed Consultancy Firm, having adequate
experience in similar projects which shall act as the Consultant for the
purposes of overall management of the projects during the contract period.
The role of Consulting Firm will be mainly in the following areas;
Survey and investigation
Preparation of DPR
Bid Process management
Construction Supervisory and inspection services
Inspection services
Review of Contract RFP’s Design and drawings.
(c) The Consulting Firm shall act as an extended arm of the client in the
technical and contractual issues connected with the implementation of the
project. The agreement are deemed to be a part of this RFP, in so far as the
duties and obligations of the Consulting Firm are concerned, and the
Consulting Firm shall equitant himself to the letter and spirit of the
(d) The projects identified have received Administrative Approval. The projects
under the consultant’s scope are to be managed from the DPR to
construction supervision and implementation stage. GWSSB will decide the
priority of the projects to be taken up under this assignment and inform he
consultant progressively.
5.0 Broad scope of work :
The consultancy work shall be for new water supply or for remodelling/ augmentation of
the existing project or for the project in which DPR is already available with GWSSB.
The scope of consultant shall be as under.
1. Study of topography of site of reservoir along with river/drain flood study .
2. Availability of government / waste land.
3. Contour survey of reservoir basin , longitudinal section & cross sections at
various intervals .
4. Study of alternative area capacity for reservoir.
5. Detailed soil investigation of basin including all kinds of sampling.
6. Detailed Design of Storage reservoir (hydraulic design , stability analysis of
earthen bund , masonry / concrete waste weir (gated / non gated) , Design
of Sub Structure / Super Structure , head regulator / intake arrangement)
7. Identification & Design of Off taking point, inlet , intake , outlet , delivery point
, overflow section , breached section etc .
8. Report of treatment required for reservoir in slope/bed for preventing
seepage/losses of water/infiltration.
9. Designing pumping station, pumping machinery, pipeline and allied
accessories ( Including all Electro-Mechanical equipments ).
10. Construction material survey including borrow area survey, quarry survey
11. Detailed Project Report containing all kinds of survey , investigation , data
design, drawings, plans , estimates, maps and cross section of construction
details, salient features etc. as required by the client.
(a) Survey and investigation
General scope of work for survey and investigation
1. Fixing of the alignment including various alternatives
2. Selection of the final alignment
3. Detail survey of the alignment at every 30 mt interval with total station
4. Preparation of the L-section of the alignment
5. Survey of all types of crossings such as road, railway, canal, oil gas
6. Survey of forest land falling in the alignment
7. Details of government and private land for which right of use is
required to be taken.
8. Survey of soil strata including identification of the type of rock such
as hard rock or soft rock, hard murrum, soft murrum etc. This
includes geological opinion and test of rock for identification of hard
9. Contour survey for the head works such as WTP, Pumping Station,
10. To study the present situation of existing systems of entrusted area .
Consultant need to carry out detailed survey and soil investigation for
the purpose of carrying out detailed design, estimates. Responsibility
for correctness and validation of any kind of data rests with the
11. To carry out survey with help of total station of minimum 1 second
accuracy or DGPS. Google earth/ Google-Earth pro/low accuracy
GPS/ Auto level/ Dumpy level/ The odolite will not be permitted. TBM
shall be marked at site and its photographs shall be submitted for
identification and link with GTS. L-Section shall be submitted
including plan on each section as well as master map showing links
in handy pattern.
12. To prepare various agendas like technical committee agenda, Board
meeting agenda and checklist for administrative approval, detailed
technical sanction for each component, Draft tender papers.
13. To collect all kinds of essential data from GWIL/GWSSB,
Government offices, non-government offices etc. to prepare Concept/
Feasibility Report with three different options and then recommend
most suitable option to carry out further detailed engineering.
14. Consultant shall carry out appropriate analytical tools for design and
estimates including Detailed Project Report.
15. To prepare the detail design and tender drawings and to suggest
right type of system. Whenever requires,
16. To prepare COST ESTIMATES with such details that can be utilized
to invite tenders with hydraulic design and drawings of various
structures on turnkey basis(excluding structural design),project
report, financial and economical analysis, draft tender document with
detail specification.
17. All the statutory permissions from the different departments shall be
obtained in time by consultant. The Authorities shall provide required
assistance in the matter of statutory permissions.
18. Consultant shall depute personnel with relevant expertise during
execution of all the works, namely canal off take, pipeline, balancing
reservoir, pumping mechanism
19. Project Area : Various Kinds of Storage Structures under
GWIL/GWSSB Broad Guidelines: The DPR shall be designed as per
the norms and standards prevailing in the state.
20. Detailed design for various components like pipe, balancing
reservoir, pumping mechanism are covered in consultant scope of
21. All necessary manpower, machineries, equipments etc. Shall be
arranged and paid by the consultant only. Concerned field staff of
GWIL/GWSSB will only guide the representative of the consultant
regarding the areas.
22. The consultant shall accompany Official of GWIL/GWSSB/GWSSB
for discussion with relevant authority regarding design, drawing and
estimate submitted by them. If necessary to answer queries raised
thereupon and to revise design for due consideration from relevant
23. The consultant shall render to GWIL/GWSSB every assistance, all
technical services, guidance or advise on any matter concerning the
technical and engineering and financial aspect of the project
including periodical interactions with State Govt. or Central Govt. or
any other authority etc
24. Cost estimation of each component and item shall be done according
to latest SOR of GWSSB and R&B/Irrigation or provide rate analysis
based on current market prices.
25. Consultant shall also prepare and submit operation and maintenance
cost of each component of the project including the system of
operation and maintenance, with cost etc.
26. Prepare detailed design (inclusive of electrical – mechanical –
Instrumentation work etc.) and working drawing.
(b) Preparation of DPR
Generally following scope of work is envisaged for DPR
1. Pre-feasibility Report
1. Detail Feasibility Report
2. Detailed Project Report with Cost Estimates.
3. Draft Tender Documents.
2. Technical Feasibility;
i. Study and analysis of suitable and feasible cost effective
equipment/machineries/tools for this work.
ii. Review of existing situation and its impact;
iii. Study and analysis of various options relating to selection of
types of pipe materials pros and cons and recommending the
suitable device;
iv. Project cost estimation and financing plan.
3. Preliminary Designs and Cost estimation;
4. Financial projections for Project Finance, phasing of costs and Financing
Plan for Financial Feasibility;
5. Cost benefit analysis and sensitivity analysis; structuring self sustained
user charge and other such option
6. Economic analysis; Social Impact, Environmental analysis
7. Operational costs projection and analysis;
8. Assessment of present, intermediate and ultimate demand for the service
9. Carry out / confirming necessary site survey and investigation
10. Hydraulic study, sizing and optimization of the various components like
intake, transmission pipeline, storage reservoir etc.
11. Study of pumping system with respect to pumps and instrumentation,
electrical control and communication system
12. Preliminary Structure design
13. Preparation of Cost Estimates
14. Exhibits and Drawing
15. Analysis of several alternatives. - The alternatives should be complete in
all respects including owning and operating costs and financial
implications. Such analysis shall also include various structures with its
advantages, disadvantages and suitability for the project, and
consultant’s recommendations for selection of suitable structure.
16. The source of water for all these scheme will be Narmada Canal System,
Dam, Reservoir, River, etc.
17. Project implementation schedule including BAR CHARTS: The
Consultants shall also formulate Bar charts to plan out and monitor all
important project activities.
18. The consultants shall plan out the implementation schedule, list out
various project related activities, determine critical activities and
formulate a detailed chart based on Program Evaluation Review
Technique (PERT) and mark the Critical Path using the latest available
and appropriate Project Management software.
19. Project appraisal and the investment decision are based on the report.
This means that the study must advance all planning (including
Preliminary engineering designs for various components of the project)
to the point that implementation can begin as soon as funding is
20. The project report should be presented clearly in one or two volumes
with additional information and data provided in supplementary
documentation as appendices to the main volume. It is particularly
important to record all new data collected during (and at the expense of)
the study, as well as its analysis. However, there port itself should
concentrate on the results and not on data collection and methods of
21. The study shall also provide an environmental impact analysis relating to
22. The study shall also cover integration of the Project with existing and
future systems in the project area.
23. Project related issues and risks shall be identified and discussed along
with recommended solutions.
24. Reports shall be presented within at in a period of 90 days (depending
upon the schedule of meeting for discussing the project) from date of
consultant’s appointment as detailed below for allotted works. However,
time limit shall commence from the date of finalization of land to set up
for reservoir by GWIL/GWSSB.
Submission breakup for 90 days is given below:
1 Conceptual Project Report and Draft Within 30 days from the date of work order
Project Report (In three copies)
2 Final Detailed Project Report with soft Within 30 days from the date of approval of
copy in CD ROM Conceptual Project Report
(In five copies)
3 Draft tender documents with all estimates Within 30 days from the date of approval of
dully detailed technical sanctioned by Draft Project Report.
competent authority.
In each of the above case the consultant shall make available computer compact disk in
two copies. All drawing must be provided in AutoCAD format and all reports/details in MS
(c) Bid Process Management
Generally following types of Contracts are followed in GWSSB’s
tendering system
Engineering Procurement and Construction (EPC)
Lump-Sum Contract
Item Rate Contract
Percentage Rate Contract.
Depending on the contract packages prequalification/initial filter with
technical and financial bid documents shall be prepared.
GWSSB will provide to the Consultant, technically approved scheme,
estimate along with drawings for each Work under invitation. Based on
these inputs, the Consultant shall prepare the Bid document, suitable
to the Works to be invited for bid, in adherence to the guidelines of
Consultant shall prepare the bid the document for the works which are
to be invited during the next three years as per GWSSB standard
format and instruction of concerned officer and submit to the concerned
EE/SE for approval. After approval of bid documents, consultant shall
prepare and submit NIT (Notice inviting Tender) to EE for necessary
wide publicity. The consultant shall assist the uploading of tender
document on website through the agency identified by the GWSSB.
Consultant shall remain present during pre-bid conference, opening of
bid, assist in replying Firm’s queries, preparation of Rojkam (minutes of
meeting) and other documents.
Consultant shall carry out Technical and Financial Bid evaluation,
prepare the necessary statement, report in support of evaluation and
submit the evaluation report along with their recommendations to the
Consultant shall assist in the process of the approval of bid by the
component authority of GWSSB at every stage till acceptance of offer
and issue of LOI/ LOA (Letter of intention/ letter of acceptance)
including signing agreement with the contract RFP.
(d) Construction Management Services
Broadly, following scope is envisaged
Drawing and mapping of alignment and assets of water supply scheme
on PM GATISHAKTI.
Assist the GWSSB in obtaining utility diversions, connections and any
clearances from different service Departments such as Revenue,
Railways, Highways (National &State), Pollution Control Board,
Telephone, Electricity Department etc. through offline as well as PM
GATISHAKTI immediately after LOI of Each Project, for the purpose of
executing the works without any delay.
Scrutinize construction methods proposed by contractor including
environmental, safety, personnel and public issues
Monitor the construction methods by assessing the adequacy of the
contractors input materials, labour, equipment and construction
Examine the soil/Strata condition at Structural location and check for its
sustainability for foundation
Supervise and Monitor construction work of each and every stage of
contract package as per the schedule of each works.
Supervise construction works from start to finish by using the modern
methods of control. Verify the setting out of the works done by the
contractors and ensure that it is as per drawings and designs. Ensure
that the works adhere to the levels, alignment and dimensions
specified in the approved drawings and designs.
Establish Quality assurance system including verification of source of
all the material and certification;
Supervise the works to ensure conformance of construction works and
materials to relevant IS standards/ Bid specifications/
Designs/drawings. Approve materials and quality of works based on
test results produced by the works Contractor, factory inspection, site
testing etc. (Quality control)
Factory Inspection of equipment under the project
Assist in record measurements in measurement books at various
stages of works, carry out check measurement, prepare bills and
certify payments based on recorded measurements jointly with the
Departmental Officers during each stage. In case of such of those
works where measurements are hidden after completion, as in the
case of foundations, reinforcements in RCC structures etc, check
measurements are to be carried out immediately after each activity is
Monitor and achieve progress with reference to pre-fixed targets drawn
up jointly with the Contractors and furnish monthly progress reports in
the formats as decided in consultation with the GWSSB.
Advise on extra claims and time extension on works contract. In case
of any need for execution of non-tendered items of works, take
advance action to prepare specifications, carry out rate analysis with
supporting documents and got approved by the competent authority to
take further action strictly as per the conditions in the bidding
Ensure environmental and social safeguards as per standard practices
Co-ordinate with all concerned agencies and GWSSB to be appraised
To ensure strict compliance of labour laws by the contract RFP Firm.
Inspect and certify that the works are completed according to the
specifications on final completion before final settlement of bills.
Prepare completion of work report for all the works.
Obtain as-built drawings for all the works from the contract RFP, verify
the correctness and furnish to the GWSSB. Obtain O&M manual from
the contract RFP after completion and before commissioning the
Inspect all the completed works once in two months during the defects
liability period and assist the GWSSB in ensuring that the contract
RFPs attend to all kinds of construction /laying defects brought to their
Prepare monthly project progress reports describing the physical and
financial progress of each package, highlighting impediments to the
quality and progress of the works and remedial actions, for submission
Prepare periodic Statement of Expenditure for getting reimbursement
of expenditure in external funded projects
In case of dispute, arbitration arising during the PMC services
consultants will assist the GWSSB.
(e) Review of Contractor’s Design and drawings
The consultant shall review proof check and furnish comments / advise
/ recommendations on the acceptability of detailed designs, drawings,
data sheets, vender data, including all documents / data / design to be
furnished by the successful contractor of the work at the time of
construction / manufacture, erection, commissioning, testing of the
works, till takeover of the works by the employer in accordance with the
conditions of contract applicable. The consultant shall continue to
perform this activity till all the designs, drawings, furnished by the
contractor are approved as good for construction by the employer on
the recommendations of the consultants. Review the design prepared
by the contractor s including the following:
Process, hydraulic, plant layout, mechanical and electrical,
instrumentation and control systems, equipment design, hydraulic flow
diagram and plant.
Civil and Structural designs with reference to BIS and other codes
Equipment vendor design / drawings / data for all mechanical, electrical
equipments instruments and systems
Final civil/structural drawings and general assembly drawings for all
Prepare construction drawings for civil works and structural works as
Consultant shall compile and furnish all the as built drawings/ designs
for each of the contract carried out under the project.
Note: “Consultant shall furnish their final clearance within 30 days after
first submission of design, drawing etc by contractor duly complying all
kinds of observations.
Consultant shall discuss personally with the field officer of GWSSB and
the representative of the contractor for avoiding delay in the clearance of
the documents.’’
(f) Operation and Maintenance
Make an outline assessment of the staffing arrangement required for the
operation and maintenance of the project. Based on the contractor’s
proposal, the consultant will assist GWSSB in developing the staffing
arrangements in detail with job specifications, number of staff, qualifications,
training requirement etc.
The Consultants shall provide training to GWSSB staff on management,
operation and maintenance.
6.0 TERMS OF REFERENCE FOR PMC & CONSTRUCTION SUPERVISION SERVICES
The consultant shall provide consultancy services for project management including
Supervision of construction and inspection of Materials for water supply and
drainage schemes as per the terms set forth herein. The works will be undertaken up
by the EPC contact under the control of client with the help of Project Management
The project as a whole is monitored by the consultant. For the purpose of the works
implementation, the project management including supervision of construction &
inspection of materials shall be the scope of the project management consultant
appointed under this contract.
6.2 Works subject of the consultancy service
Whatever items are to be executed by the EPC contractor and to be managed,
inspected and supervised by the Project Management Agency. The client has
already identified the schemes under the consultant’s scope and obtained
administrative sanction. GWSSB will make this information on schemes available to
the consultant for preparation of DPR. Based on the approved DPR, the consultant
will prepare bid documents. Thus the consultancy services starts from preparation of
DPR and after performance report of implementation of project, i.e from concept to
commissioning of the schemes. The PMC consultant will act for successive
implantation of the project.
6.3 Appointment of consultant
GWSSB intend to appoint a reputed consultant having adequate experience in such
projects. The role of the consultant will be to prepare bid document, to carry out
evaluation of bids, assist GWSSB in finalizing the contractor, provide project
management and construction supervision services covering review of design and
approval, construction supervision, inspection, and determining and ensuring
compliance with the Technical Requirements, the Performance Standards,
management the progress and certification of measurements and payments during
the contract period.
6.4 Scope of work
As per Section-4 clause No.5 Broad Scope of Work (a) to (g)
6.5 Consultant’s general duties
(a) The broad role of the consultant shall be to act as the Client's representative for:
Survey and Investigation
Preparation of DPR(Drawing and mapping of alignment and assets on PM
Preparation of tender document, invitation of tender, financial and technical
evaluation of bid and final recommendation;
Detailed checking and approval of Structural design as well as Hydraulic
Design submitted by the contractor
Check of survey and settings
Construction supervision, Quality Assurance and Progress Management and
inspection of mechanical and electrical equipments
Measurements recording, scheduling and certification
Other activities related to the technical and contractual aspects of the construction
of the Project.
(b) Consultant shall, during the pre construction period, inspect the project site on day to
day basis in order to determine the progress of mobilization. The Consultant shall
monitor the progress of surveys and setting out, review the construction drawing
submitted by the contractor and the extent of compliance with the Technical
Requirements and the Performance Standards stipulated for the Facility, as well as
conformity to the Contractor's proposals.
(c) The Consultant shall, during the construction period, be available on a continuous
basis at the project site in order to supervise, inspect, monitor and certify the works,
and conformity with Technical Requirements and the Performance Standards
stipulated for the Facility. The Consultant shall also monitor the progress of setting
out, and review the construction drawings and as-built-drawings submitted by the
contractor. The Consultant shall also perform functions of recording measurements,
certification of payments, adherence to project program, and reporting. The
Consultant shall be responsible to generate the data/reports required to be
submitted to Client on a periodic basis as required in the contract agreement and
also give opinion for contractual matter viz; excess, extra items, extension of time
limit and other contractual matter.
(d) The Consultant shall, during the defects liability period, inspect the Project Site at
intervals as and when required to monitor technical performance of the Project.
(e) The Consultant shall report to the Client at very frequent intervals, on a daily,
weekly, and monthly basis, such details as are mutually agreed between the Client
and Consultant. Apart from period reports, the Consultant shall intimate the Client in
writing of any deviations from the Technical Requirements and Performance
(f) It is reiterated that the contract is EPC/other forms also; the Client binds the
contractor only on performance. The measurements and reviews do not constitute
approval rights as between the Client and the contractor, but in so far as the
Consultant is concerned, he shall ensure that a complete internal record of the work
is available. The Consultant shall ensure that his inspections do not impede the
design, construction and operation and maintenance of the Facility.
(g) The Consultant shall be required or
Survey and investigation
Preparation of DPR for the schemes taken into account techno- economic aspects
and should be easily manageable for operation and maintenance.
Preparation of tender document, invitation of the bid, technical and financial
evaluation of the bid and final recommendation.
DetailedcheckingandapprovalofStructuraldesignaswellasHydraulicDesignsubmittedb
ythecontractor.
Review and approve the Quality Assurance and Quality control plan.
Review and approve the Program Schedule.
Review and approve the construction drawings.
Carry out day-to-day site supervision for quality control.
Assisting in taking and recording the measurements, preparation of the bills and
dimension control. All the measurements are to be taken and recorded by an
authorized engineer of GWSSB. The measurement can be recorded in
measurement book. The measurement can be recorded in measurement book. The
measurement recorded by the authorized engineer of GWSSB will be certified by the
PMC Consultant.
Witness the testing and inspection of materials of construction and the inspection of
the mechanical, electrical as well as automation components of the project at factory
anywhere in India. The inspection of materials will be done at factory site by PMC
consultant in all over Gujarat and outside Gujarat
Monitor Work program, identify slacks and slippage, and suggest remedial
Monitor adequacy of manpower, machinery and other resources to meet the target.
Co-ordinate the review meetings.
Review and certify milestone payments.
Review and verify variations due to excess extra item and advise in value
Review and advice on time extensions.
Monitor implementation of quality assurance procedures.
Generate and compile reports as required under the contract agreement.
Review and certify stages of work such as Taking Over, Construction
Completion and Maintenance certificate.
Ensure the Environmental and Social covenants are implemented during
Monitor water supply management, operations & maintenance of system and safety
Assist clearance in ROU matter and getting approval from authorities for various
Any other work which may deem fit and decided by the client in consultation with the
6.6 Reporting and co-ordination
The Consultant (and his staff) shall report only to the Client's representative. The
Consultant shall not exercise any direct control over the contractor, but shall report
to the Client's representative who shall be the sole point of contact with the
Contractor. The Client shall also have senior and supervisory staff as required at
site. The contracts shall provide for a Consultant to supervise the contract
agreement. Similarly the Lenders may appoint a Lender's engineer. The Consultant
shall co-ordinate with all such persons for the fulfillment of obligations, but shall
report solely to the Client's representative.
The consultant shall submit daily report, weekly report, monthly reports, Quarterly
report, Half yearly report, and yearly reports as per the requirement of the GWSSB.
6.7 Project team
The Consultant shall be required to form a multi disciplinary Project Team for this
assignment, from the areas given below;
Water Supply Engineering
Hydraulics with Surge Analysis & Control
Project Management.
Structural Engineering
Mechanical, Electrical, Instrumentation.
Quality Assurance and Quality Control.
Contract expert.
Water Treatment Plant Expert
Construction supervision expert
Inspection Expert
The Consultant Team shall also have multi-disciplinary skills with various experience
in management of the Environmental Management Plan.
− Geotechnical Engineering / Foundation Engineering / Soil Mechanics
− Geo-hydrologist / Geo-physics / Geologist.
− Financial expert
− Safety engineer
6.8 Assistance from client:
Client would help in co-coordinating site visits and also any clarifications sought by
Consultants, before the Proposals are submitted.
The Consultants would be assisted by client obtaining relevant information from the
authorities as well extend co-operation on following areas:
a) Exchange of data and information related to the study.
b) Day-to-day interactions and management of activities to enable active project
management, issue letters of authority to consultants to facilitate activities
related to Assignments and collection of data from State Government
Departments and other agencies.
c) The Terms & Conditions, Contract Agreement with detailed scope of work of
Item rates/ EPC / TURN KEY /other type of Contract shall be made available
to the consultant
6.9 Phasing of and location for consultancy services
The Consultancy services are to be rendered in following four phases together with
a) Pre-Contract work :Office / site, as appropriate
b) Contract Management, Construction Supervision Site / at venders premises
Material inspection anywhere in India
c) Defects Correction Supervision site
d) Post-Contract work Office site as appropriate
6.10 Procedures and authority level:
(a) The Consultant shall carry out the Services as defined in Clause 6.11 of these
Terms of Reference or as otherwise required for efficient works' execution,
while acting in the capacity of the "Representative of the Client" according to the
intentions of the "Conditions of Contract", which form part of the tender/contract
documents for works execution and shall be available for review at the GWSSB.
The "Conditions of Contract" clarifies in detail, the duties and authorities of the
Consultant and of his representative, to whom the Consultant may delegate
duties and authorities as required.
(b) Principally, the Consultant have to carry out the day-to-day qualitative and
supervision of works execution and construction contract administration on
behalf of the Client following the laid down procedures.
The powers vested in the Consultant there to under the terms and conditions of
this Contract are subject to limitations as stipulated in the above said
"Conditions of Contract" in respect of taking major steps in construction contract
administration notably referring to.
approving assignment and sub-contracting issuing a notice to commence
certifying additional costs and payments
determining extensions of time
issuing a certificate of substantial completion
issuing a defects correction certificate
For which the specific approval of the Client in writing shall be needed in
(c) Whilst therefore being fully accountable to the client in ensuring that the works
are executed within the tender total or such other sum as may become payable
to the contractor under the provisions of this contract and within the scheduled
time for completion, the Consultant also has duties towards the contractor in
administrating and interpreting the contract properly and fairly to maintain the
work schedule and to avoid disputes. Thereto the Consultant shall ensure that
the Client's and the contractors’ rights under the construction contract are
upheld by ensuring good verbal and written communication between himself,
the Client and his representatives and the contractor and his representatives.
The Consultant shall follow the contractor's progress carefully and forecast well
ahead the needs for critical actions to be taken. He shall ensure, that items with
a lead time or otherwise not readily available e.g. pipes, pumps and electrical
installation items are ordered well in time by the contractor. He shall also
ensure that excessive quantities of materials are not ordered where the delivery
of such quantities could cause difficulties on site or the materials could
(d) In particular, the Consultant shall ensure that payments to the contractor can be
made on time by giving ample notice and opportunity to the Client's
representative to carry out whatever quality checks and measurements he may
wish prior to authorizing payment of amounts certified by the Project Engineer.
The Consultant shall therefore agree with the Client's representative on a
regular basis and well in advance on items on which the Client's
representative wishes to carry out checks and measurements and on the
extent of such checks and measurements. Provided that the Clients
representatives has been given adequate notice in writing to carry out his own
checks and measurements but fails to do so, works execution will continue
without delay and payment of the amounts certified by the Consultant will be
deemed to be authorized. In such events, the Consultant shall state in writing
to the Client that he was requested to carry out his own checks and
measurements but failed to do so. This Clause is not in any way limiting the
Client's rights to carry out spot checks and measurements at any time.
The Project Engineer, during the contract, shall provide the Client with monthly
reports indicating physical progress compared to the work schedule and cost
aspects including amounts certified so far and during that month and any
financial implication in the reports, the Consultant shall also include
observations and comments on testing results and quality of workmanship.
6.11 Detail Scope of work – Construction supervision stage
The Consultant shall carry out duties and authorities which include, without being
limited to them, the following functions and tasks by phase of work.
6.11.1 Pre-Contract work
Read and understand the concept of the details of the works and of the Services
from the various documents prepared by or on behalf of the Client.
Inspect all existing surveys, mapping and other site data to determine and
identify additional work as required to provide the contractor with sufficient
information to execute the works with no claims or time extension.
Jointly with the Client, develop formats for reporting and recording.
Mobilize all staff and other requirements well in time to carry out the services.
Technical and financial evolution of the bids
6.11.2 Contract Management, Construction supervision and inspection of materials
machineries & equipments
a) Contract Management
Within the powers granted to the Consultant, administer the construction
contract on behalf of the client.
Work closely with the client, to assist him to carry out his obligations under the
construction contract in order that the contractor is not hampered in any way in
Carrying out his duties.
ensure that the contractor carries out the works in accordance with the
construction contract and assist the contractor therewith, all to enable the
contractor to fully carry out his obligations within the tender total or such other
sum as may become payable to him under the provisions of his contract and
within the scheduled time for completion.
Liaise between the Client and the Contractor to ensure good communication
between all parties such that disputes do not arise and that any such disputes
are settled reasonably and amicably and assist in any adjudication.
Keep accurate records of all site activities and operations and those required
elsewhere for efficient works execution from the contractor and others under the
construction contract, including but not restricted to
- Correspondence between client, Consultant and contractor as well as
between them and third parties.
- Minutes of scheduled meetings
- Daily, weekly and monthly report from the Engineer's representative and the
site inspectors
- Instructions, variation orders, approval forms, etc.
- Level and survey books, including checks on setting out and completed work.
- Work records, such as measurements, levels, dimensions, drawings and
material delivery notes.
b) Progress Reports based on Prima Vera or M.S. Project software charts and
− test data and laboratory reports
− plant and labor returns
− day work records
− financial records, including interim statements plus supporting particulars
and certificates administrative records concerning leave, sickness,
Where applicable as submitted and as corrected, if necessary.
c) Work's programming:
Agree with the Client on the overall construction program.
Agree with the contractor at the start of the works on his detailed work program.
Monitor progress of the works and ensure that the contractor, as and when
required, produces revised programs.
Ensure that the contractor allows for sufficient lead time for the provision of all
materials, plant, equipment and labor to avoid hold ups or bottlenecks.
Timely devise, jointly with the contractor, a plan of action for detailed
investigations and testing of existing facilities, if any to be incorporated in the
permanent works.
prevent any hold ups due to factors beyond the control of the contractor,
including such factors in the hands of the client like granting of access to all
parts of the site, provision of certain facilities and storage areas, obtaining of
rights of way and way leaves and any such other items which are the duty of or
where assistance is to be given by the Client
assist the contractor in case, notwithstanding the above time problems not
caused by him occur in making up for any lost time or in negotiating interim
extension of time
finalize the no. of personnel to be engaged for particular project in consultation
with engineer in charge
d) Inspection of Materials, Machineries and Equipments
Inspection of Materials Machineries and equipment sat the place of manufacture
within Gujarat and outside Gujarat in the country.
The inspection shall consist of preparation of methodology sequences and
system report inclusive its commissioning for each category works ensuring
quality assurance and control so as to achieve the desired objective and
sustainability of the system for the anticipated serve life to each category.
Any effective modification found necessary during their inspection process for
achieving the designated aim shall be brought to the notice of the Client and
obligatory on the agency.
Typical inspection checklists shall be prepared for each category of works on
each operation and activities with reference to documents and standards. The
acceptance / rejection report through the concerted inspection engineer
ensuring all the points shall be mandatory.
The inspection system and procedure shall be prepared and maintained on day-
to-day basis. The inspection crews shall have guidelines, test plans, scope of
inspection, procedures, checklists and various formats to carry out inspection in
a systematic method.
The computerized inspection reports shall have to be prepared.
The inspection report on based on factory and / or onsite inspection shall be
submitted to the engineer-in-charge of the project, periodically as per
All stationary, drawing stationary, design facilities, reprographic facilities etc.
shall be provided by Consultant at his own cost.
The Consultant shall issue necessary certification on progressive completion of
each category of work after ensuring quality control and assurance so as to
achieve the designed objectives of the particulars works. The certification shall
be based on satisfactory adherence of the system and procedures of the
e) Review and Approval
Study of contract documents for civil, mechanical and electrical works
Inspection of Test Plan (ITP) prepared by the contractor / Vendors
Review of quality assurance plan.
Welding procedure, testing procedure etc. prepared by the contractor.
Checking and inspecting Factory / field laboratories provided by Vendor
/contractor to conduct laboratory tests.
Test certificates / reports of materials to be used for finished product for use in
construction and installation.
Provide construction as well as supervisory staff on regular basis at site of work
during excavation, foundation, any type of concreting, supply, laying and testing
of pipeline, Pumping station, Filter plants, STPs etc.
The support field staff shall have to remain present during concreting works for
supervision and quality control as per the tender specification and also keep the
work related record.
Construction field staff shall be provided in consultation with Engineer in Charge
1. Construction Engineer as per annexure-C
2. Support staff for field execution level (Degree/Diploma/ITI) for reinforcement
checking, concreting, all types of activities related to the project as per work
3. Record keeping personnel to be engaged depending upon the site of work,
Cost of the work, quantities involved etc.
f) Quality surveillance:
Foundation approval
Construction material
M.S. Plates / M.S. Coils Mild Steel Pipes Valves, Specials fittings etc.
Pipe external coating, internal lining at coating yards on at site etc.
DI/HDFC/PVC/UPVC/RCC/OPVC Pipes etc.
Pumping machineries including different types of pumps, L.T. H.T. Motors,
various type of valves, motorized actuators sluice gate, expansion bellows,
mechanical - electrical components of water treatment plant
Window Air Conditions
Surge Control devices such as Air Vessels, Air Cushion & Zero VelocityValves.
Flow measuring devices
Pressure measurement devices
Pressure switches
Welding electrodes
Ordinary port land cement
Drinking & Construction water
Building materials steel, cement bricks, coarse aggregates, sand etc.
Power transformers
3.3 to 11 KV switch gear
Capacitors with Panel
415 V – Switch gear
Air circuit Breakers
Current and Voltage Transformers
Indicating Meters
Terminal Blades
Lighting fixture
Protective Relays
LT/HT cable & cable termination
Miniature circuit Breaker
Instrument and control cables
Programmable logic controller
Local central panel
Rader type Measurement systems
Lightning Protection Unit
Panel Enclosure
g) Supervision of construction
Supervise the mobilization of the contractor, his staff, plant, equipment etc. and
his provisions for storage and other operating areas, paying particular attention
to land made available for the construction of the works, including rights-of-way
and way leaves.
Provide the contractor with points, lines and levels of reference, as made
available by the Client or otherwise established, and check the contractor’s
setting out his shall include the accurate locations and levels of all structures,
the lines and levels of pipelines and the locations of accesses, storage areas,
working areas, way leaves etc.
Check all construction materials and equipment arriving on site to ensure that
they are in compliance with the lists of supplies submitted by the contractor and
meet the requirements of the specification and the applicable standards’ ensure
that all materials handling and storage is in accordance with the manufacturers’
recommendations. Advise to the EPC contractor for safety measures &
Monitor and inspect the contractor’s methods of construction for permanent and
temporary works, including false work, checking of centering & scaffolding,
reinforcement and supervision of concrete & other civil work, as well as
materials and equipment installation, workmanship and other site operations in
regard of compliance with the requirements of the specification, the applicable
standards and the manufacturer’s recommendations, with all due attention being
given to adherence to safety codes, labour laws, either laws, bye-laws and
regulations and avoidance of public nuisance.
Prepare and Issue to the contractor from time to time, as and when necessary,
such further drawings, specification and instructions as required under the
construction contract to enable the contractor to complete his obligations under
his contract in a timely manner.
Direct and witness from time to time such tests regarding construction materials
and equipment and workmanship as required under the construction contract to
be executed by the contractor or elsewhere and instruct the contractor to
undertake corrective action in case of non- compliance with the specification or
the applicable standards.
Supervise the contractor’s detailed investigations and testing of existing
facilities, if any, in regard of compliance with the plan of action and decide on
the basis of the results of the testing on whether the said facilities are sufficiently
sound to be incorporated in the permanent works without adversely effecting
later operation and functioning.
In the event of technical problems arising on site, assist the contractor in
overcoming them in the interest of the Client. Within the tender total or such
other sum as may become payable to the contractor under the provisions of his
contract and within the scheduled time for completion.
Agree with the contractor on the breakdowns of any provisional sums provided
for in the bill of quantities of the construction contract and issue instructions as
regards the extent to and the manner in which the provisional sums will be
Upon having obtained approval of the client, issue variation orders or order
extension of time as required under the construction contract.
“ Provide construction as well as supervisory staff on regular basis at site of work
during excavation, foundation, any type of concreting, supply, laying and testing of
pipeline, Pumping station, Filter plants, STPs etc. “
The support field staff shall have to remain present during concreting works for
supervision and quality control as per the tender specification and also keep the
work related record.
Construction field staff shall be provided in consultation with Engineer in Charge as
1. Construction Engineer as per annexure-C
2. Support staff for field execution level (Degree/Diploma/ITI) for reinforcement
checking, concreting, all types of activities related to the project as per work
3. Record keeping personnel to be engaged depending upon the site of work,
Cost of the work, quantities involved etc.
h) Review / Approval of the documents
Study of contract documents for Civil / Mechanical and Electrical work.
Inspection test plan prepared by the contractor for Civil, Mechanical and
Electrical works.
Material test certificates for cement, reinforcement and major bulk materials.
All check test reports laboratory as well as internal for the materials convert,
i) Site Supervision of construction
Ensuring setting up of field laboratories
Contractors internal test on materials, concrete, mortar etc.
Pipe line trenching, bedding
Lowering, laying and welding & jointing of Mild Steel pipe lines of various sizes.
Installation of valves, specials fittings.
Inside in-situ lining
Pipeline hydro testing and pre commissioning test.
Proper alignment of pipeline trenching.
Nallah / River crossings – culverts bridges etc.
Major / minor road crossings
Railway crossings
Orientation location of structures depth of foundation etc. with respect to
approved drawings and approved test plan
Dimensions, reinforcement, concreting in foundation for major civil works.
Shuttering, plumb, dimensions, concreting etc. in sub structure including vertical
wall, ring beams, tie beams, columns, slab etc as per approved inspection test
Civil, mechanical and electrical works of water treatment plant - ESR, GSR,
intake structure, pump house.
The items listed in scope of works are major items covered under the
construction contract.
The miscellaneous items and any other major items remained in the lists but
required for the successful implementation of the project shall also form the part
of scope of work under this consultancy.
j) Measurement, Valuation, Certification Settlement of claims and financial
Monthly or otherwise periodically measure the permanent works and value them
in accordance with the methods of measurement and notes on pricing as well as
the unit rates of the bill of quantities as included in the construction contract.
Receive the contractor's monthly statement and upon verification against the
measurement and valuation as above, certify the statements or correct them as
required under the construction contract and forward them to the Client for
Keep accurate records to maintain an effective cost control system in order that
the cost of works execution remains within the approved amount of contract
during the period of the execution of the works, the estimate of the total costs
shall be continuously updated and the Client kept informed of his financial
commitments and when he shall be required to make payments.
Keep accurate records of all variations made and all Claims forwarded by the
contractor, together with the reasons thereof, which may affect the sum
becoming payable to the contractor under the provisions of his contract; claims
shall be verified skillfully, but fairly interpreting the provisions of the construction
contract and shall only be agreed upon when truly justified.
Upon agreement with the contractor on outstanding work still to be carried out
by him during the defects correction period and upon having obtained approval
of the Client thereto, issue at the appropriate time the certificate of substantial
completion and certify for erase the portion of the retention money related
k) Operation and Maintenance Manuals and Training of Operators
Ensure that "as-built" drawings meeting professional standards are provided by
the contractor.
Prepare detailed project report "as-executed" and operation and maintenance
manuals for all components of the permanent works, as required.
Train scheme operators, selected by the Client or others, to give them the
appropriate skills for proper operation and maintenance of the works.
6.12 Defects Correction Supervision
Make periodic site visits to ensure that any outstanding work agreed upon with
the contractor before the issue of the certificate of substantial completion is
properly carried out.
In the event of any defect and whenever required, visit the site, ensure that
repairs are properly carried out.
On the occasion of site visits as above and / or request of the Client, supervise
performance of the operators and report to the Client in case of shortcomings,
including recommending on corrective actions.
At the end of the defects correction period and when all outstanding work is
completed and all repairs are carried out satisfactorily, issue the defects
corrections certificate in accordance with the provisions of the construction
6.13 Post Contract Work
On removal of all material, plant, equipment and staff from the site by the
contractor, agree with the Client and the contractor on all monies owed to or by
the contractor, including the remaining retention money, and release all
guarantees and securities in accordance with the provisions of the construction
After clearing and tidying up of the site by the contractor is complete, carry out
all work required to finalize the construction contract administratively.
7.0 MILESTONE FOR CONSTRUCTION SUPERVISION CONSULTANT FOR WATER
SUPPLY PROJECTS
The following is a typical general guide line that gives an overall responsibility and
the duties of Construction supervision consultant for different types and kinds of
works that are generally the part of civil and mechanical activities of water supply
and drainage projects. There may be various other categories of works, but the
general guide lines will remain more or less same.
Broadly following activities are expected to be carried out under construction
supervision services.
To study the tender document thoroughly including specifications, drawings and
bill of quantities and to offer ambiguity if any
To visit the site, examine the soil, analysis, report, survey data and opine
regarding the location of the structures and lay out prepared by the contractor
– water table, flood level, etc
To study the methodology and work plan submitted by the contractor
To collect the samples of the material, steel, and send the same for testing from
the approved laboratory and approve the material to be consumed in the work
To attend project review meeting and submit the progress report to employer
To opine in written regarding excess, extra items, time limit and other
contractual matter
7.2 Inspection/Supervision
The supervision team to visit the site at various important and critical stages
for each component of the project as under:
7.2.1 Pipeline Work
All the material i.e. pipes, valves, joints, etc. to be inspected and tested at
factory as per the relevant BIS and as per tender specifications
Regular supervision and checking of excavation of pipeline trenches, bedding
and laying, jointing of pipeline work
At the time of hydraulic testing and commissioning of the pipeline
7.2.2 Civil Work
It is essentially the responsibility of the consultant to arrange for over all
supervision and inspection of works; however there should be some bare minimum
visits for regular supervision and checking of the works as shown against each item
7.2.3 Pump House/Intake works
Approval of the foundation along with comparison with S.B.C. report and water
Visit at plinth level including foundation for pumping machinery, etc.
Visit at slab level including checking of reinforcement, centering and cube
Visit at final finishing including verification of excess extra items, time limits and
important contractual matter
7.2.4 GSR/Sump/Reservoir
Approval of the foundation along with comparison with S.B.C. report and water
Visit at the site of casting of base slab including reinforcement checking, etc.
Visit at 50% height of vertical walls and columns including reinforcement
checking, cube test, etc.
Visit at full height of vertical walls and columns including reinforcement
checking, cube test, etc.
Visit at the time of roof slab casting with checking of steel and centering
Visit during the plastering and other allied works including inlet, outlet, scour
Visit at the time of hydraulic testing and commissioning and certifying of test
results for cube test and reinforcement test, etc
7.2.5 Elevated Service Reservoir
Foundation approval along with comparison with S.B.C. report and water table,
Visit at the time of casting the footing and vertical shaft wall or columns etc with
dimension check, verticality check and cube test, etc.
Visit at 30% staging height with dimension check, verticality check and cube
Visit at 60% staging height with dimension check, verticality check and cube
Visit at 100% staging height with ring beam, checking the centering,
reinforcement, centering, dimensions of container, verticality check including
cube test, and casting of base slab and slant wall
Visit at the time of vertical wall of container – reinforcement, centering and
dimensions of container and verticality check including cube test
Visit at the time of casting roof slab/dome – checking centering, reinforcement,
Visit at the time of erection of vertical pipes – pipe checking and alignment
Visit during the plastering and other allied works
Visit at the time of testing and commissioning along with checking of excess,
extra items time limit and other contractual matter
7.2.6 Filtration Plant
Scrutinizing the hydraulic diagram along with approved design and the layout of all
the units suggested by agency. Visit for checking the line out and foundation of
clarifier, filter, chemical house along with SBC report, water table and general
appearance, etc
Visit at the time of base slab along with checking all required levels
Visit at the time of flocculator walls along with checking at all required levels,
cube test and verticality test
Visit at the time of casting vertical wall up to 50% height along with checking at
all required levels, cube test and verticality test
Visit at the time of casting vertical wall at 100% height, casting launder and
platform along with checking at all required levels, cube test and verticality test,
v-notch fixing, etc.
Visit at the time of finishing and testing
Minimum 3 visit for erection of mechanical and electrical equipment and testing
of equipment at factory site and installation, testing and trial run atsite.
(b) Filter House
Approval of the foundation along with checking S.B.C. report and water table,
Visit at the time of base slab concreting and column footing, reinforcement, etc
Minimum 2 visit for concreting work for vertical wall of the filter bed and first
floor slab – verification with structural drawings, cube test, etc
Visit at the time of casting roof slab – verification with structural drawings, cube
Visit at the time of casting all the chambers and channels and other allied work
Minimum 3 visit for erection of mechanical and electrical equipment and testing
of equipment at factory site and installation, testing and trial run at site
3 visits at the time of all the piping work and under drainage system, filling of
gravel and sand – filter media – back wash arrangement, wash out
arrangement as per drawings, etc
Visit at the time of commissioning, hydraulic testing, flow testing and quality and
quantity checks
(c) Chemical House and Recycling Unit
Periodical 4-visits for both the work considering all of above technical points
including laboratory and office setting–alum and chlorine dosing–
Equipment testing, installation and commissioning
7.3 Mechanical and Electrical
100% inspection of material i.e pumping machinery,motor, surge vessel,
transformer, cables, panel, valves, etc
Finalization of P. &I. diagram
Checking of layout of foundation blocks
Erection of pumps and motor
Erection of electrical components
Trial run and testing of equipment
8.0 Penalties (Limitation of Liability)
The Consultant shall carry out the Consulting engineering services in conformity
with general accepted norms and sound standard of engineering.
The Consultant shall be responsible for technical soundness of the services
GWSSB may review, monitor and check the works carried out by the consultant.
If such checks disclose that the works carried out by the consultant do not meet
the specified requirements, GWSSB may not pay the consultancy fees for their
affected portion.
In the event of any deficiency in these services aforementioned in Section-4, the
Consultant shall interlay promptly re-do such engineering services at no
additional cost to GWSSB.
If due to faulty DPR major changes is found in estimated cost, then 25%
consultancy fees of that project shall be deducted and this amount shall not be
more than 10% of the total PMC agreement cost.
9.0 Special terms and conditions of the contract
a) Staff deployment: The staff deployed for the project shall not be changed
without the permission of GWSSB.
b) Transportation: The consulting Firm shall have to engage vehicles in good
working condition as per requirement at site. In case, vehicles are found to be
short than requirement, deduction shall be made at prevailing market rate or
rate given in breakup of price shown in appendix-E by him, whichever is higher
on per day basis.
c) Office Requirement: The consulting Firm shall establish one main office at
Gandhinagar and one office at Zone/District level where projects are being
implemented after allotment of particular project for execution, as decided by
CE(Tech Cell) of GWSSB. Decision of CE(Tech cell) shall remain final.
d) Overall supervision: GWSSB is engaging consulting Firm for the work of
Project Management and construction supervision consultant for quality and
timely execution of work. Thus essence of the contract is quality of work and
GWSSB wants no compromise in this respect due to any action of Consulting
e) If the Consultant does not establish their office at site with furniture, computer,
printer/plotter, Scanner, fax, stationary, staff, vehicle for supervision etc. within
three month from date of work order, then Rs. 2000 per day for the number of
days delayed for establishing the office for the particular project will be
deducted from the bill. One employee of consultant’s firm shall be depolyed by
Team leader at site office for all concerned work related to allocated project.
GENERAL CONDITIONS OF CONTRACT
SPECIAL CONDITIONS OF CONTRACT
GENERAL CONDITIONS OF CONTRACT
1. GENERAL PROVISIONS
1.1 Definitions;
Unless the context otherwise requires, the following terms whenever used in this
Contract have the following meanings:
(a) “Applicable Law” means the laws and any other instruments having the force of
law in the Government’s country, or in such other country as may be specified in
the Special Conditions of Contract (SC), as they may be issued and in force from
(b) “GWSSB” means the GUJARAT WATER SUPPLY & SEWERAGE BOARD, a
Govt. of Gujarat undertaking, Gandhinagar
(c) ”Consultant” means Agency / Bidder, any private or public entity that will provide
the Services to the GWSSB under the Contract.
(d) “Contract” means the Contract signed by the Parties and all the attached
documents listed in its Clause 1 that is this General Conditions (GC), the Special
Conditions (SC), and the Appendices.
(e) “Day” means calendar day.
(f) “Effective Date” means the date on which this Contract comes into force and
effect pursuant to Clause GC 2.1.
(g) “Foreign Currency” means any currency other than the currency of the GWSSB’s
(h) “GC” mean these General Conditions of Contract.
(i) “Government” means the Government of the GWSSB
(j) “Local Currency” means the currency of the GWSSB
(k) “Member” means any of the entities that make up the joint
venture/consortium/association, and “Members” means all these entities.
(l) “Party” means the GWSSB or the Consultant, as the case may be.
(m) “Personnel” means professionals and support staff provided by the Consultants
or by any Sub-Consultants and assigned to perform the Services or any part
thereof; “Foreign Personnel “means such professionals and support staff who at
the time of being so provided had their domicile outside the Government’s
country; “Local Personnel” means such professionals and support
Staff who at the time of being so provided had their domicile inside the
Government’s country; and “Key Personnel” means the Personnel referred to in
Clause GC 4.2(a).
(n) “Reimbursable expenses” means all assignment-related costs other than
Consultant’s remuneration.
(o) “SC” means the Special Conditions of Contract by which the GC may be
amended or supplemented.
(p) “Services” means the work to be performed by the Consultant pursuant to this
Contract, as descridbed in Section-4 hereto.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DMO_2876_01-May-2025_273.pdf
PMC tender vol 1 27.11.25.pdf
PMC tender Vol 2 27.11.25.pdf
Amendment 1.pdf
Amendment no 2.pdf
Pre Bid Clarifications.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .