Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.5 LAccepted-Finance 801 RAMESHWAR APARTMENT JALARAM T STREET NO 2 3 UNIVERSITY ROAD RAJKOT 360005 GUJRAT | RAJKOT | GUJARAT | 360005 | ₹58.5 L | L1 | Accepted-Finance lowest bidder (L1) |
| 2 | L2₹62.7 L+₹4.2 L (7.25%)Rejected-Finance 3RD FLOOR T 19 SUKAN MALL NEAR RAJSTHAN HOSPITAL SHAHIBAUG AHMEDABAD GUJARAT 380004 | AHMADABAD | GUJARAT | 380004 | ₹62.7 L+₹4.2 L (7.25%) | L2 | Rejected-Finance Quoted amount is higher than lowest bidder. |
| 3 | L3₹63.3 L+₹4.8 L (8.22%)Rejected-Finance | ₹63.3 L+₹4.8 L (8.22%) | L3 | Rejected-Finance Quoted amount is higher than lowest bidder. |
| 4 | L4₹81.3 L+₹22.8 L (39.0%)Rejected-Finance KAMAL KUNJ KAMAL MUKHI DEVI RAM JAIPAL NAGAR GOLA ROAD BAILEY ROAD DANAPUR PATNA BIHAR 801503 | PATNA | BIHAR | 801503 | ₹81.3 L+₹22.8 L (39.0%) | L4 | Rejected-Finance Quoted amount is higher than lowest bidder. |
| 5 | L5₹84.3 L+₹25.8 L (44.1%)Rejected-Finance 1036 B STREET 11 PATEL NAGAR GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | ₹84.3 L+₹25.8 L (44.1%) | L5 | Rejected-Finance Quoted amount is higher than lowest bidder. |
| Sl No | Description | Qty | Unit | Parikh Kashyap Indulal L1 | M/S VALLABH CORPORATION L2 | Kamla Infracon and Services Pvt. Ltd. L4 | R K AND CO L5 | M/S JK GHAI L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Painting runway/taxi track/apron marking (including painting of Numbers, Alphabets, Arrows and other markings of all shapes etc.) with adequate nos of coats to give uniform finish with water based road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete.
New work (Two or more coats) | 1,000 | Sqm | 61 ₹61,000 Lowest | 100.99 ₹1,00,990 | 81 ₹81,000 | 81 ₹81,000 | 62 ₹62,000 |
| 2.00 | Painting runway/taxi track/apron marking (including painting of Numbers, Alphabets, Arrows and other markings of all shapes etc.) with adequate nos of coats to give uniform finish with water based road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete.
Old work (One or more coats) | 67,225 | Sqm | 46 ₹30,92,350 | 73.47 ₹49,39,020.75 | 54 ₹36,30,150 | 60.3 ₹40,53,667.5 | 38 ₹25,54,550 Lowest |
| 3.00 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. | 4,214 | Sqm | 284 ₹11,96,776 | 102 ₹4,29,828 Lowest | 454 ₹19,13,156 | 531 ₹22,37,634 | 460 ₹19,38,440 |
| 4.00 | Removal of old runway/Taxiway/Apron markings using a surface scrubbing/grinding machine, followed by water jetting or blasting, to eliminate dust, grit, and foreign deposits etc. The operation shall ensure no damage to the existing surface and maintaining the required surface texture and roughness, avoiding excessive smoothness, as per the directions of the Engineer-in Charge. | 3,976 | Sqm | 200 ₹7,95,200 | 9 ₹35,784 Lowest | 346 ₹13,75,696 | 360 ₹14,31,360 | 235 ₹9,34,360 |
| 5.00 | Supplying skilled manpower for day to day jobs inculding coordination with Ops & other Dte., passing operational instructions to labour while working in operational area and other assigned tasks as per the directions of Engineer-in-charge.
Note:
1.The contractor shall ensure payment of minimum wages and all statuary compliance/labour law as per relevant GCC clauses. Necessary/supporting documentation related to payment of labour shall be provided to AAI official(s) without any delay.
2.Difference in wages on account of revision of minimum wages from time to time shall be paid extra to contractor after submission of proof documents regarding payment of same. However, contractor profit and overhead shall not be payable on same. | 365 | Each | 918 ₹3,35,070 | 900 ₹3,28,500 Lowest | 1,500 ₹5,47,500 | 900 ₹3,28,500 Lowest | 1,100 ₹4,01,500 |
| 6.00 | Supplying highly skilled manpower taking day to day measurements/checking/markings/allignments/lettering edge lines etc. for day to day jobs inculding coordination with ATC on walkie talkie and other assigned tasks as per the directions of Engineer-in-charge.
Note:
1.The contractor shall ensure payment of minimum wages and all statuary compliance/labour law as per relevant GCC clauses. Necessary/supporting documentation related to payment of labour shall be provided to AAI official(s) without any delay.
2.Difference in wages on account of revision of minimum wages from time to time shall be paid extra to contractor after submission of proof documents regarding payment of same. However, contractor profit and overhead shall not be payable on same. | 365 | Each | 1,008 ₹3,67,920 | 1,200 ₹4,38,000 | 1,600 ₹5,84,000 | 810 ₹2,95,650 Lowest | 1,200 ₹4,38,000 |
Tender Value
₹1.2 Cr
EMD Value
₹3.7 L
Closing Date
29 Apr 2026, 6:00 pmClosed
AGM (E-C)
O/o AGM (E-C) AAI, Dehradun
Annual Rate Contract for Painting of Runway, Taxi Track, Apron etc. in operational area at Dehradun Airport for the year 2026-27
2026_AAI_274044_1
AAI/DDN/ENGG(C)/RWY PAINTING/2026
Open Tender
Civil Works
Item Rate
365 days
Dehradun Airport
Please refer Tender document.
2 documents required · 2 mandatory
₹1,180
₹3.7 L
16 Jun 2026
8 Apr 2026
4 May 2026
9 Apr 2026
29 Apr 2026
9 Apr 2026
9 Apr 2026 - 15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Painting runway/taxi track/apron marking (including painting of Numbers, Alphabets, Arrows and other markings of all shapes etc.) with adequate nos of coats to give uniform finish with water based road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete.
New work (Two or more coats) | - | Sqm | - | - |
| 2 | Painting runway/taxi track/apron marking (including painting of Numbers, Alphabets, Arrows and other markings of all shapes etc.) with adequate nos of coats to give uniform finish with water based road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete.
Old work (One or more coats) | - | Sqm | - | - |
| 3 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. | - | Sqm | - | - |
| 4 | Removal of old runway/Taxiway/Apron markings using a surface scrubbing/grinding machine, followed by water jetting or blasting, to eliminate dust, grit, and foreign deposits etc. The operation shall ensure no damage to the existing surface and maintaining the required surface texture and roughness, avoiding excessive smoothness, as per the directions of the Engineer-in Charge. | - | Sqm | - | - |
| 5 | Supplying skilled manpower for day to day jobs inculding coordination with Ops & other Dte., passing operational instructions to labour while working in operational area and other assigned tasks as per the directions of Engineer-in-charge.
Note:
1.The contractor shall ensure payment of minimum wages and all statuary compliance/labour law as per relevant GCC clauses. Necessary/supporting documentation related to payment of labour shall be provided to AAI official(s) without any delay.
2.Difference in wages on account of revision of minimum wages from time to time shall be paid extra to contractor after submission of proof documents regarding payment of same. However, contractor profit and overhead shall not be payable on same. | - | Each | - | - |
| 6 | Supplying highly skilled manpower taking day to day measurements/checking/markings/allignments/lettering edge lines etc. for day to day jobs inculding coordination with ATC on walkie talkie and other assigned tasks as per the directions of Engineer-in-charge.
Note:
1.The contractor shall ensure payment of minimum wages and all statuary compliance/labour law as per relevant GCC clauses. Necessary/supporting documentation related to payment of labour shall be provided to AAI official(s) without any delay.
2.Difference in wages on account of revision of minimum wages from time to time shall be paid extra to contractor after submission of proof documents regarding payment of same. However, contractor profit and overhead shall not be payable on same. | - | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tenderdoc.pdf
Tender Documents • 7.57 MB
BOQ_320028.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .