Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
6 May 2024, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Repairs to 300 HP ATS Starter of Lift Irrigation Scheme Gantamulla and Sheeri-1. (Fresh).
2024_IFC_248288_3
eNIT 02 of 2024-25 MISD Baramulla
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Baramulla
Please refer Tender documents.
7 documents required · 7 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Yes
15 May 2024
29 Apr 2024
7 May 2024
29 Apr 2024
6 May 2024
29 Apr 2024
Amount
Repairs to 300HP ATS Starter of L.I.S Gantamulla by way of: Disconnecting of fully automatic Autotransformer Starter from the main circuit, then dismantling of damaged parts from the starter which comprises of following job. a) Replacement of damaged A.C coil of Telemecanique & Controls LCIF 500A 415volt 50HZ with new one (01 no). b) Providing/fitting & Testing of Single Phase preventer with Phase unbalance ,phase failure Phase Reversal protection relay voltage range 415V Ac 50Hz.(01 no) c) Providing and fitting of new fuse set of reputed make as per sample. d) Minor repairs to copper control wiring of starter including cable ties, connections, tapping and insulation as per requirement. . After completion of work the starter should be tested on full load. Note: Old scrap return to divisional store.
Repairs to 300HP ATS Starter unit no.02 of L.I.S Sheeri-I by way of: Disconnecting of fully automatic Autotransformer Starter from the main circuit, then dismantling of damaged parts from the starter which comprises of following job. a) Providing, fitting & testing of new Contactor Field Coil to MNX 550A 415 volts 50HZ. The Electromagnetic Contactor assembly coil voltage range 240V. (01 no) b) Providing, fitting & setting of electro pneumatic timing relay with timing range up to 60s coil voltage 415V.(2NO + 2NC double block) ON&OFF delay. c) Providing and fitting of new fuse set of reputed make as per sample. d) Minor repairs to copper control wiring of starter including cable ties, connections, tapping and insulation as per requirement. . After completion of work the starter should be tested on full load. Note: Old scrap return to divisional store.
Asif Engineering Works
M/s SAJID ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .