Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.8 L+₹2,079.46 (0.55%)Admitted-Fee/PreQual/Technical/Finance | ₹3.8 L+₹2,079.46 (0.55%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.8 L+₹2,084.07 (0.55%)Admitted-Fee/PreQual/Technical/Finance | ₹3.8 L+₹2,084.07 (0.55%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.1 L+₹25,419.57 (6.69%)Admitted-Fee/PreQual/Technical/Finance | ₹4.1 L+₹25,419.57 (6.69%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | KARTHIKEYAN CK L1 | SUBIN N B L3 | SARIN OS L2 | SIJIL GANGADHAR L4 |
|---|---|---|---|---|---|---|---|
| 1.00Block office ceiling | |||||||
| 1.00 | OD141035/2026-2027:Engaging Labour | 3 | each | 973.97 ₹2,921.91 Lowest | 979.21 ₹2,937.63 | 979.37 ₹2,938.11 | 1,050 ₹3,150 |
| 1.00 | 13.97.1:Painting with oil type wood preservative of approved brand and manufacture:Old work (one or more coats) | 96.94 | sqm | 40.39 ₹3,915.25 Lowest | 40.62 ₹3,937.54 | 40.62 ₹3,937.54 | 44.88 ₹4,350.49 |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 709.66 | kg | 168.35 ₹1,19,472.1 Lowest | 169.29 ₹1,20,139.19 | 169.28 ₹1,20,132.09 | 183 ₹1,29,868.7 |
| 1.00 | OD140990/2026-2027:Providing and fixing 8 mm cement fiber board to backing or studding with screws etc. complete (Frames, backing or studding to be paid separately)
Details of cost for 350 x 200 cm = 7 sqm | 129.03 | sqm | 766.65 ₹98,920.85 Lowest | 770.9 ₹99,469.23 | 770.9 ₹99,469.23 | 800 ₹1,03,224 |
| 1.00 | 50.12.4.2:Providing and fixing false ceiling with 7.5 mm thick PVC wooden grains panel board ceiling of approved quality in aluminium frame work with necessary screws etc complete ( aluminium frame work shall be paid separately) | 64.84 | sqm | 915.85 ₹59,386.46 Lowest | 920.93 ₹59,715.86 | 920.93 ₹59,715.86 | 970 ₹62,897.71 |
| 1.01 | OD141062/2026-2027:Providing and fixing aluminium work consisting of tee /angle sections, of approved make conforming to IS : 733 in frames of false ceiling including aluminium angle cleats with necessary C.P brass/ stainless steel sunk screws, aluminium perimeter angles fixed to wall with stainless steel rawl plugs @ 450 mm centre to centre and fixing the frame work to G.I level adjusting hangers 6 mm dia. with necessary cadmium plated machine screws all complete as per approved architectural drawings and direction of the Engineer-in-Charge ( level adjusting hangers, ceiling cleats and expansion hold fasteners to be paid for separately ). | 71.33 | kg | 664.59 ₹47,403.21 Lowest | 667.89 ₹47,638.59 | 668.28 ₹47,666.41 | 690 ₹49,215.63 |
| 1.01 | 13.52.2:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work | 129.03 | sqm | 223.94 ₹28,894.98 Lowest | 225.18 ₹29,054.98 | 225.18 ₹29,054.98 | 245 ₹31,612.35 |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 129.03 | sqm | 148.38 ₹19,145.47 Lowest | 149.2 ₹19,251.28 | 149 ₹19,225.47 | 164 ₹21,160.92 |
Tender Value
₹4.2 L
EMD Value
₹10,557
Closing Date
14 Sept 2026, 11:00 amClosed
AE,LID EW,Thalikulam BP
AE,LID EW,Thalikulam BP
Thalikulam BP 2026-27 Changing of Roof ceiling of Block office building-Project No. 11/27-General Civil Work
2026_LSGD_867016_1
01/AE/ET/LIDEW/TKM/26-27
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thalikulam
PLEASE REFER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹935
Yes
₹10,557
Yes
15 Sept 2026
3 Sept 2026
15 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
3 Sept 2026 - 14 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Block office ceiling | |||||
| 1.001 | OD141035/2026-2027:Engaging Labour | - | each | - | - |
| 1.002 | 13.97.1:Painting with oil type wood preservative of approved brand and manufacture:Old work (one or more coats) | 0.4 | sqm | - | - |
| 1.003 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1 | kg | - | - |
| 1.004 | OD140990/2026-2027:Providing and fixing 8 mm cement fiber board to backing or studding with screws etc. complete (Frames, backing or studding to be paid separately)
Details of cost for 350 x 200 cm = 7 sqm | - | sqm | - | - |
| 1.005 | 50.12.4.2:Providing and fixing false ceiling with 7.5 mm thick PVC wooden grains panel board ceiling of approved quality in aluminium frame work with necessary screws etc complete ( aluminium frame work shall be paid separately) | 0.2 | sqm | - | - |
| 1.006 | OD141062/2026-2027:Providing and fixing aluminium work consisting of tee /angle sections, of approved make conforming to IS : 733 in frames of false ceiling including aluminium angle cleats with necessary C.P brass/ stainless steel sunk screws, aluminium perimeter angles fixed to wall with stainless steel rawl plugs @ 450 mm centre to centre and fixing the frame work to G.I level adjusting hangers 6 mm dia. with necessary cadmium plated machine screws all complete as per approved architectural drawings and direction of the Engineer-in-Charge ( level adjusting hangers, ceiling cleats and expansion hold fasteners to be paid for separately ). | 0.8 | kg | - | - |
| 1.007 | 13.52.2:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work | - | sqm | - | - |
| 1.008 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | - | sqm | - | - |
stage.html
html • 0.02 MB
finance_1467992.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.09 MB
ipactepayment.pdf
Tender Documents • 0.45 MB
BOQ_1467992.xls
BOQ • 0.23 MB
viewsbd.pdf
Tender Documents • 1.86 MB
paceiling.pdf
Tender Documents • 0.25 MB
Feeceiling.pdf
Tender Documents • 0.33 MB
affceiling.pdf
Tender Documents • 0.23 MB
Fotceiling.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .