Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹22.2 L+₹47,334 (2.18%)Rejected-Finance | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹22.6 L+₹83,889 (3.86%)Rejected-Finance | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹24.7 L+₹2.9 L (13.4%)Rejected-Finance | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹25.1 L+₹3.4 L (15.6%)Rejected-Finance | L5 | Rejected-Finance Not Being L1 |
Tender Value
₹25.9 L
EMD Value
₹51,800
Closing Date
9 Mar 2020, 6:00 pmClosed
GE I DM
GE I DM NAVAL DOCKYARD VISAKHAPATNAM 530014
REPAIR/MAINTENANCE OF AHUs AND MISC MAINTENANCE WORKS OF VARIOUS PACKAGE AC PLANTS AT NAVAL DOCKYARD VISAKHAPATNAM
2020_MES_326037_1
SSGE/8276/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
NAVAL DOCKYARD VISAKHAPATNAM
As per tender documents
7 documents required · 7 mandatory
₹500
GE I DM
₹51,800
Yes
30 Apr 2020
17 Feb 2020
11 Mar 2020
17 Feb 2020
9 Mar 2020
3 Mar 2020
Amount
Repairs, overhauling and servicing of 120 TR AC plant Plant compressor by stripping out both end covers, cylinder head, cylinders, connecting rod, crank shaft, oil pump, side covers, bush bearings etc.,and refrigerant taking the cylinder for reuse (if available) of unserviceable worn out parts in the compressor, cleaning the system with CO2/Nitrogen gas for leak detection for minimum 24 Hrs, after flushing out the system, vacuumization and charging with refrigerant gas & compressor oil and testing the unit on no load and full load conditions all as specified and directed. Note:- Supply only refrigerant gas, compressor oil and spare parts for the compressors shall be measured and paid seperaterly.
All as per item No 1.00 above, but 30 TR AC plant
Supply only Crank shaft suitable for 120 TR AC plant No.04 (Make:- Carrier Model :- 5H-120) complete all as specified and as directed.
All as per item No 3.00 above, but Piston
All as per item No 3.00 above, but Liners (cylinder)
All as per item No 3.00 above, but DE ( main) bearing
All as per item No 3.00 above, but Seal and bearing
All as per item No 3.00 above, but Shaft seal
All as per item No 3.00 above, but center bearing
All as per item No 3.00 above, but capacity controlller
All as per item No 3.00 above, but Discharge reed
All as per item No 3.00 above, but suction reed
All as per item No 3.00 above, but piston ring set
All as per item No 3.00 above, but Oil ring set
All as per item No 3.00 above, but discharge guide assembly
All as per item No 3.00 above, but valve plate
All as per item No 3.00 above, but Pump and washer
All as per item No 3.00 above, but seal and washer
All as per item No 3.00 above, but seal with thrust washer
All as per item No 3.00 above, but oil regulator
All as per item No 3.00 above, but piston pin
All as per item No 3.00 above, but oil filter
All as per item No 3.00 above, but DV springs
All as per item No 3.00 above, but SV springs
All as per item No 3.00 above, but Value lifter spring
All as per item No 3.00 above, but CR bush
All as per item No 3.00 above, but CIV clip
All as per item No 3.00 above, but Lock washer
All as per item No 3.00 above, but discharge value guided bolt
All as per item No 3.00 above, but oil pump assembly
All as per item No 3.00 above, but connecting rod nut and bolts
All as per item No 3.00 above, but gasket set
All as per item No 3.00 above, but CR bearing set
All as per item No 3.00 above, but valve lifter pin
All as per item No 3.00 above, but discharge bypass valve
Supply only compressor oil Servo 68 complete all as specified and as directed Make : Servo
Supply only R-22 gas. complete all as specified and as directed Make:-Refron 22/Floron 22/Mafron 22
Supply & fix HMI display board with micro processor controller touch pad for 26 TR ductable AC plant (Model No :- 30RBS80S Make:- Carrier) including taking out old unserviceable one complete all as specified and as directed
Supply & fix NRCP board for 26 TR ductable AC plant (Model No :- CEBD 430335 -16 - RB Make:- Carrier) including taking out old unserviceable one complete all as specified and as directed
Supply & fix EXV board for 26 TR ductable AC plant (Make:- Carrier) including taking out old unserviceable one complete all as specified and as directed
Supply & fix suction gas temperature tranduger (LP) for 26 TR ductable AC plant (Make:- Carrier) including taking out old unserviceable complete all as specified and as directed
Supply & fix dischage gas temperature tranduger (HP) for 26 TR ductable AC plant (Make:- Carrier) including taking out old unserviceable one complete all as specified and as directed
Supply & fix living water temperature sensor for 26 TR ductable AC plant (Make:- Carrier) including taking out old unserviceable one complete all as specified and as directed
Supply & fix entering water temperature sensor for PHE for 26 TR ductable AC plant (Make:- Carrier) including taking out old unserviceable one all as specified and directed.
Supply and outside temperature sensor for 26 TR ductable AC plant (Make:- Carrier) including taking out old unserviceable one all as specified and directed.
Supply and HP switch for 26 TR ductable AC plant (Make:- Carrier) including taking out old unserviceable one complete all as specified and as directed
Supply and LP switch for 26 TR ductable AC plant (Make:- Carrier) including taking out old unserviceable one complete all as specified and as directed
Supply & fix of shaft seal for 120 TR AC plant, taking out refrigerant reuse (if available) and taking out old unserviceable shaft seal in the compressor, cleaning the system with CO2/Nitrogen gas for leak detection for minimum 24 Hrs, after flushing out the system, vacuumization and charging with refrigerant gas complete all as specified and as directed Make:- Kirloskar. Note:- Supply only refrigerant gas for the compressors shall be measured and paid seperaterly.
Supply & fix of shaft seal for 60 TR AC plant, taking out refrigerant reuse (if available) and taking out old unserviceable shaft seal in the compressor, cleaning the system with CO2/Nitrogen gas for leak detection for minimum 24 Hrs, after flushing out the system, vacuumization and charging with refrigerant gas complete all as specified and as directed Model No:- 5H 60 Make:- Carrier. Note:- Supply only refrigerant gas for the compressors shall be measured and paid seperaterly.
Supply & fix of shaft seal for 30 TR AC plant, taking out refrigerant reuse (if available) and taking out old unserviceable shaft seal in the compressor, cleaning the system with CO2/Nitrogen gas for leak detection for minimum 24 Hrs, after flushing out the system, vacuumization and charging with refrigerant gas complete all as specified and as directed Model No:- SMC-6-65 Make:- Accel. Note:- Supply only refrigerant gas for the compressors shall be measured and paid seperaterly.
Supply & fix of shaft seal for 40 TR AC plant, taking out refrigerant reuse (if available) and taking out old unserviceable shaft seal in the compressor, cleaning the system with CO2/Nitrogen gas for leak detection for minimum 24 Hrs, after flushing out the system, vacuumization and charging with refrigerant gas complete all as specified and as directed Model No:- AC 4 - 70 Make:- Kirloskar. [Note:- Supply only refrigerant gas for the compressors will be measured and paid seperaterly.]
Material & labour for repairs/maintenance of 26 TR ductable AC Plant by leak testing with N-2 gas under constant Pressure of 250 PSI (17 kg/cm2) after complete transfer of refrigerant gas from the entire system, rectification of leakage by cutting and brazing the refrigeration system wherever required, replacement Of “O” rings, teflon washers of valves, copper tubing, safety valves, flare nuts etc., neutralising after the pressure holds, good for atleast 24 hours, vaccumization, charging the system with refrigerant Gas, performance test and commissioning complete all as specified and as directed [Note: Gas charging shall be measured and paid for separately.]
Material & labour for 26 TR Ductable AC plant complete checking, servicing/ rectification of electrical circuits for all units and control wiring showing phase sequence with proper lugging of AC plant control panel including replacement of fused indication lamps with new ones, cleaning of all power contacts, rectification of minor defects in Ammeters and Voltmeters, testing and commissioning complete all as specified and as directed
SRIVEN TECHNOLOGIES
SRI SIDDHI VINAYAKA ENTERPRISES
HARSHITHA INFRA
M/s SIRI INFRA
bhavani constructions
sri sai ram constructions
LAKSHMI SAI CONSTRUCTIONS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .